A solar array on agricultural land and the classification

6 min readBy PlanScope Editorial Team

An illustrative walkthrough where a site specific soil survey split a field between subgrades, changed the layout and removed the objectors' strongest point.

The published agricultural land classification map for most of England cannot tell you whether a field is best and most versatile land. The provisional maps drawn before 1988 do not separate Grade 3a from Grade 3b, and that single distinction decides whether a solar application is arguing about high quality land or about ordinary farmland.

What follows is an illustrative walkthrough of a ground-mounted array, assembled from the way these applications usually run. No areas, yields or costs are quoted, because they vary too much to state usefully.

The site and the proposed array

Two adjoining arable fields on a gently sloping plateau, in the ownership of a single farming family, with a distribution network connection available at an acceptable distance. The proposal was a ground-mounted photovoltaic array with an operational life of around 40 years, sheep grazing retained between the rows, and the existing hedgerows kept and reinforced.

No statutory landscape designation applied. The nearest listed building was a farmhouse some distance away with intervening woodland. There was no public right of way across the site, though one ran along a lane to the east.

On the face of it a straightforward case. The obstacle was the mapping.

Published land classification and its limits

The provisional agricultural land classification maps, produced at a coarse scale before the current criteria were published in 1988, show the whole area as Grade 3. That grade covers land of good to moderate quality and it was never subdivided on those maps.

Grades 1, 2 and 3a are best and most versatile land. Grade 3b is not. National policy expects poorer quality land to be preferred for this kind of development, and expects an applicant proposing to use higher quality land to explain why. Everything therefore turned on which half of Grade 3 the fields fell into, and the published map was incapable of answering.

Objectors had already written to the council quoting the map as evidence that the land was Grade 3. The parish council's letter described the fields as prime agricultural land. Neither statement was wrong on the published data, and neither was useful.

Post-1988 detailed classification exists for some areas and can be viewed through the national mapping services alongside other constraint layers. For this site there was none.

The site-specific soil survey

The only way to resolve it is a survey on the ground by a soil scientist.

The Agricultural Land Classification work followed the standard approach: auger borings on a grid across both fields, soil pits at representative points, and recording of texture, stoniness, depth, structure and signs of seasonal waterlogging. Those observations combine with climate data for the location, principally rainfall and accumulated temperature, and with gradient, to produce a grade for each part of the site.

Two factors usually decide whether Grade 3 land is 3a or 3b in lowland England. Wetness, expressed as a soil wetness class combined with the climate data, limits the range of crops and the number of workable days. And droughtiness, calculated from the available water the profile can hold against crop requirements, limits yield in dry years.

Councils usually expect a suitably qualified author for this work, and professional review is strongly advised. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Survey timing matters. Augering waterlogged ground gives unreliable readings, and a survey carried out in a saturated February can misrepresent the profile.

What the survey found and how it changed the case

The results split the site. The larger field, on deeper soils over a freely draining substrate, graded as subgrade 3a. The smaller field, shallower and stonier with a slowly permeable layer at depth, graded as subgrade 3b, with a band of Grade 4 along the steeper northern margin.

That changed the application in three ways.

The layout was revised to concentrate the array on the poorer land and to reduce the extent on the 3a field, accepting a smaller installed capacity. The planning statement could then describe a scheme that had actively minimised its use of best and most versatile land rather than one that asserted it.

The case on reversibility became central. Ground-mounted arrays on driven piles, with cable routes recorded and no concrete foundations, do not sterilise soil in the way a building does, and continued grazing keeps the land in agricultural use throughout.

And the objectors' strongest point lost its evidential base, because the survey was site-specific and their map was not.

Considering alternative sites

Alternatives are not generally a requirement in planning, but where higher quality land is proposed, policy expects an explanation of why poorer land was not used.

The submission covered four things. The grid connection constraint, which limits the search area far more than most objectors appreciate. Land availability and ownership within that area. Designations and constraints that ruled out otherwise suitable parcels. And the classification of the parcels that survived those filters.

Keep it short and factual. A long alternative sites study invites the objection that a better site exists, and the credible version of this section describes the filters rather than claiming an exhaustive search.

Landscape and glint assessment

The Landscape and Visual Impact Assessment followed the standard methodology, with viewpoints agreed with the case officer and the array modelled at panel height rather than at ground level.

Mitigation was conventional and effective: retaining and gapping up the hedgerows, additional native planting on the two open boundaries, and a set-back from the lane. Panels were specified with a low-reflectance finish.

Glint and glare was assessed because of a small airfield within the wider area. Aviation safeguarding has its own guidance and its own consultees, and the assessment has to address flight paths and control tower positions as well as road users. On this site the conclusion was that no unacceptable effect arose, though the assessment was the item the applicant had not budgeted for.

Biodiversity net gain was straightforward, because arable land carries a low baseline value and the grassland created beneath an array scores well. The Biodiversity Net Gain Assessment was completed by a competent person as the Environment Act 2021 regime requires.

The decision and the restoration condition

Permission was granted for a defined period, with the array to be removed and the land restored at the end of it.

The conditions that carried the agricultural case were these. A soil management plan governing stripping, storage and reinstatement during construction, following the national guidance on sustainable use of soils on construction sites. A requirement that the land beneath and between the arrays be kept in agricultural use. A decommissioning and restoration scheme, to be submitted before the array is removed, covering removal of piles and cabling and the reinstatement of soil structure. And a trigger requiring removal where the array ceases to generate for a continuous period.

The restoration condition is the one that persuades agricultural objectors, and it is worth drafting carefully rather than accepting the council's standard wording. A scheme that ends with compacted tracks and no subsoiling requirement does not restore anything.

A comparable rural case, turning on Green Belt rather than soil quality, is set out in the walkthrough of stables and a menage in the Green Belt.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which reports a ground-mounted renewable scheme on farmland is likely to need.

Frequently asked questions

Why is the published ALC map not enough?

The provisional maps were produced at a coarse scale before the 1988 criteria and do not subdivide Grade 3 into 3a and 3b. Since 3a is best and most versatile land and 3b is not, the published map cannot answer the question that decides the application. Detailed post-1988 classification exists for some areas only.

What counts as best and most versatile land?

Grades 1, 2 and 3a. National policy expects poorer quality land to be preferred for development of this kind, and expects an applicant proposing to use higher quality land to explain why. Grade 3b, 4 and 5 land is outside the definition, which is why the 3a and 3b boundary matters so much.

What does an ALC survey involve?

Auger borings on a grid with soil pits at representative points, recording texture, stoniness, depth, structure and signs of seasonal waterlogging. Those observations combine with rainfall and accumulated temperature data for the location and with gradient. Wetness and droughtiness are usually what separate subgrade 3a from 3b in lowland England.

When should the survey be carried out?

Avoid saturated ground, because augering waterlogged soil gives unreliable readings and can misrepresent the profile. Otherwise the survey can be done at most times of year. Commission it early, since the result may change the layout and the installed capacity rather than simply supporting a scheme already designed.

Does a solar array permanently lose agricultural land?

Not in the way a building does. Arrays on driven piles with recorded cable routes and no concrete foundations are reversible, and grazing between the rows keeps the land in agricultural use. That reversibility is central to the planning case, and it has to be secured by soil management and restoration conditions.

What should the restoration condition say?

It should require a decommissioning and restoration scheme covering removal of piles and cabling and the reinstatement of soil structure, including relief of compaction on access tracks. Add a trigger for removal where generation ceases for a continuous period. Standard council wording often omits the soil reinstatement detail.

Sources and further reading

solaragricultural land classificationbest and most versatilesoil surveyruralwalkthrough

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Scenario Walkthroughs

View all →
Scenario Walkthroughs7 min read

A scheme that failed on biodiversity net gain

A net gain failure rarely happens at application stage. It happens when the biodiversity gain plan goes in for approval, the authority says no, and the site cannot lawfully start.

Read article →
Scenario Walkthroughs7 min read

A veterinary practice with overnight care: a walkthrough

The building use was already acceptable. The 24 hour operation, with barking at 3am and a condenser running against a party boundary, is what the application had to justify.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a beer garden extension and noise conditions

Pub garden extensions are rarely refused on the garden. They are conditioned on the noise of people talking in it after dark, and the layout does more than the fence.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: removing a protected tree for an access

A protected tree can usually be removed for an access, but rarely by applying to remove the tree. The route that works runs through a full planning permission.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a roof terrace refused on overlooking

A flat roof over a rear extension is not free outdoor space. This illustrative walkthrough follows a roof terrace from refusal on overlooking through sight line sections to an approved revision.

Read article →
Scenario Walkthroughs6 min read

A forestry cabin and the functional need test

The forestry permitted development right stops at dwellings. How an essential rural worker case is evidenced, and why a temporary permission is often the outcome.

Read article →