Latest articles

8370 articles
Comparisons7 min read

Unilateral undertaking against a bilateral section 106 deed

Both instruments are made under section 106 and both bind the land. The difference is that a unilateral undertaking cannot contain any obligation on the authority.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting for the local validation checklist

Local validation requirements drive the cost of an application pack, not the national list. Price each triggered item as a named line before quoting, and challenge the items that cannot be material.

Read article →
Project Type Guides8 min read

Consenting a live music venue and the agent of change test

Live music venues are sui generis and the agent of change principle decides who bears the mitigation cost. Low frequency sound insulation and patron dispersal are what the case turns on.

Read article →
Which Reports Do I Need7 min read

Reports for a vertical farm in a warehouse

A controlled environment vertical farm in an existing warehouse needs permission, and the use class is unsettled. Grid capacity, light spill, plant noise and trade effluent drive the evidence.

Read article →
Council Guides7 min read

A council's statement of community involvement explained

Section 18 of the Planning and Compulsory Purchase Act 2004 requires every authority to publish a statement of community involvement. The statutory publicity minimum is a separate duty.

Read article →
Planning Law Updates7 min read

Grey belt and the golden rules for Green Belt release

The grey belt route gives a development management answer where a plan has not kept up, conditional on golden rules covering affordable housing, infrastructure and public green space.

Read article →
Neighbours, Objections and Community7 min read

Objecting on tree grounds and asking for a protection order

Asking for a Tree Preservation Order takes a letter and the right evidence. In a conservation area the six week notice under section 211 is the mechanism that actually saves trees.

Read article →
AI and Planning7 min read

Measuring whether a drafting tool saved time

Measure the whole cycle from instruction to a document you will sign, including verification and rework. Without a baseline from your own time records, there is nothing to compare.

Read article →
Daylight, Sunlight and Amenity7 min read

Temporary loss of light from scaffolding and hoardings

Temporary obstruction of light by scaffolding or a hoarding is not a planning matter. The controls sit in highway licences, construction management plans and private nuisance.

Read article →
Comparisons7 min read

Householder application against a full application

The householder category is defined by what you are proposing, not chosen. It carries a different fee, lighter validation and the 12 week expedited appeal route.

Read article →
Costs, Fees and Budgeting7 min read

Heritage budgeting: desk assessment against intrusive recording

Heritage spend splits between desk-based analysis and intrusive recording or evaluation. The recording level and the post-excavation assumption decide what the client actually pays.

Read article →
Project Type Guides8 min read

Consenting an anaerobic digestion plant on a farm

An on-farm anaerobic digestion plant needs planning permission and an environmental permit. Where the feedstock comes from and where the energy goes decides how the use is characterised.

Read article →
Which Reports Do I Need7 min read

Reports for a dental practice in a converted house

A house to dental surgery conversion needs full permission for a change of use from Class C3 to Class E(e). Parking demand and plant noise are what actually decide the application.

Read article →
Planning Law Updates7 min read

Section 73B and the limits on amending a permission

Section 73B was inserted to fill the gap left between non-material amendments and condition variations. It does not solve the Hillside problem, and its commencement needs checking.

Read article →
Neighbours, Objections and Community7 min read

Party wall rights alongside planning permission

Planning permission is public law and the Party Wall etc. Act 1996 is private law. Holding one does not give you the other, and section 6 excavation notices catch most rear extensions.

Read article →
AI and Planning7 min read

Why a devolved application needs a different policy base

An English policy base does not transfer to Wales, Scotland or Northern Ireland. The plan hierarchy, the statutory duties, the flood framework and the terminology all change.

Read article →
Viability, Obligations and Commercial8 min read

Deferred contributions and the security an authority accepts

Where an authority agrees to defer a section 106 financial contribution it will want security. The choice between a bond, a guarantee, a legal charge and an occupation restriction decides the real cost.

Read article →
Daylight, Sunlight and Amenity7 min read

When a daylight assessment is required on the validation list

No national rule requires a daylight assessment. The requirement comes from the authority's own local validation list, and the trigger is usually set by storeys, separation distance or whether new flats are proposed.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a transport evidence base by scheme size

The transport evidence base scales in steps. Work out which document the authority requires before commissioning surveys, and order the low cost work so it de-risks the expensive work.

Read article →
Scenario Walkthroughs7 min read

Bat roost found during a bungalow loft conversion

An illustrative walkthrough of a bungalow loft conversion where a bat roost was confirmed, showing how the May to September survey season and the licensing route reshaped the programme.

Read article →
Comparisons7 min read

Prior approval against permitted development without it

Schedule 2 to the GPDO 2015 splits permitted development into rights you can simply exercise and rights suspended until prior approval. The difference governs certainty, fees and conditions.

Read article →
Project Type Guides8 min read

Planning permission for a riding school and indoor arena

Keeping horses commercially falls outside the agricultural exemption, so a riding school and its covered arena need express permission. Access visibility, arena scale and manure storage usually decide the case.

Read article →
Which Reports Do I Need8 min read

Reports for a parcel locker and courier hub

A last mile courier hub needs transport, noise, drainage and utilities evidence shaped around pre-dawn van departures and fleet charging load, not warehouse trip rates.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting an ecology package across the survey seasons

Ecology cost is driven by which month you start, not by day rates. Commission the appraisal in autumn, book spring survey slots, and price a second season as a named line.

Read article →