Latest in Rural and Agricultural

134 articles
Rural and Agricultural7 min read

Succession, tenancies and who applies for permission

Planning permission runs with the land, so a tenant, a landlord or a promoter can all apply over the same field. The safeguard is the ownership certificate and the 21 day notice to agricultural tenants.

Read article →
Rural and Agricultural8 min read

Redundant farm buildings and the demolition question

Most standalone agricultural buildings can be demolished without a planning application, yet demolition removes any later conversion right and brings asbestos, ecology and restoration duties with it.

Read article →
Rural and Agricultural7 min read

Diversifying into events in a working farmyard

Part 4 of the General Permitted Development Order allows 28 days of temporary use a year on land, but excludes buildings and anything inside a curtilage. Where that leaves farm events, and the evidence a permanent consent needs.

Read article →
Rural and Agricultural8 min read

Visibility splays onto a rural lane

A speed survey comes before the drawing. How visibility splays are derived on an unclassified lane, how to measure them, and the land control problem nobody plans for.

Read article →
Rural and Agricultural7 min read

Re-using a rural building in the Green Belt

Two limbs decide a Green Belt conversion: permanent and substantial construction, and preserving openness. Most applications satisfy the first and lose on the curtilage.

Read article →
Rural and Agricultural7 min read

Livestock buildings and the distance to housing

The only fixed figure is the 400 metre permitted development limit. Beyond that, odour modelling, ventilation design and manure management decide what separation is acceptable.

Read article →
Rural and Agricultural7 min read

Best and most versatile land and the survey that proves it

Grades 1, 2 and 3a are the best and most versatile land that policy protects. Only a field survey separates 3a from 3b, and that single line decides how much weight the loss carries.

Read article →
Rural and Agricultural6 min read

Temporary dwellings for rural workers and what follows

A temporary consent bridges the gap between functional need and a viable business. The permanent application rests on records you have to start keeping immediately.

Read article →
Rural and Agricultural7 min read

When horse grazing becomes a change of use

The test is what the land is for, not how many horses are on it. Imported feed, fencing, a muck heap and a worn track together describe an equestrian use.

Read article →
Rural and Agricultural6 min read

Holdings under five hectares and what Part 6 allows

On a holding between 0.4 and five hectares you can extend an existing agricultural building but cannot erect a new one. That single point reshapes most smallholding plans.

Read article →
Rural and Agricultural6 min read

Structural capability under Class Q prior approval

Class Q allows conversion, not reconstruction. The structural appraisal has to show the existing frame can carry the finished dwelling without being replaced in the process.

Read article →
Rural and Agricultural7 min read

Proving the agricultural use date for a Class Q conversion

Class Q turns on a date and the word solely. The documents that prove agricultural use, and the mixed uses that quietly defeat a barn conversion claim.

Read article →
Rural and Agricultural7 min read

Countryside stewardship agreements and planning conditions

Planning permission does not release you from a stewardship agreement. How to evidence an existing agri-environment agreement, amend it before you build, and avoid counting the same habitat twice.

Read article →
Rural and Agricultural7 min read

Rural exception sites: the evidence that unlocks them

Exception sites fail on stale need surveys and unbankable section 106 drafting far more often than on policy. The survey, the cascade, the cross-subsidy test and the land value conversation.

Read article →
Rural and Agricultural7 min read

Agricultural prior notification refused: the options left

Class A prior approval covers siting, design and external appearance only. What a refusal actually means, and why most are fixed by moving the building rather than arguing.

Read article →
Rural and Agricultural7 min read

Farm succession: planning evidence when the holding splits

Splitting a holding divides the labour requirement, can drop a unit below the Part 6 threshold and leaves occupancy conditions attached to the wrong dwellings. The sequence that avoids it.

Read article →
Rural and Agricultural8 min read

Livestock odour and separation from neighbouring homes

England has no statutory separation distance for livestock odour. This is how councils actually assess it, what the 400 metre rule in Part 6 does, and which conditions to expect.

Read article →
Rural and Agricultural8 min read

Woodland and forestry buildings: permitted development

Class E of Part 6 covers buildings and private ways reasonably necessary for forestry on land actually used for forestry. The exclusion of dwellings is what catches most owners out.

Read article →
Rural and Agricultural9 min read

Nutrient neutrality on a farm diversification scheme

Two holiday cottages need a nutrient budget and secured mitigation. A farm shop on the same yard does not. The existing agricultural baseline is usually what makes the budget close.

Read article →
Rural and Agricultural8 min read

Farm holiday lets: which consent route actually fits

A full application gets self-catering units with an occupancy condition. Class R gets serviced guest house use within a 500 square metre cap. Class Q gets an unrestricted dwelling and no holiday let.

Read article →
Rural and Agricultural8 min read

Battery storage on farmland: noise, fire and grid limits

Electricity storage sits outside the national infrastructure regime in England, so these schemes are local applications. Noise at night, the fire service response, land grade and landscape effects decide them.

Read article →
Rural and Agricultural8 min read

Solar farms and agricultural land grade: the sequential case

National policy prefers poorer quality land where agricultural land must be developed. How to survey the grade properly and document the search that justifies the site.

Read article →
Rural and Agricultural7 min read

Free range poultry units and ammonia assessment

Ammonia deposition on designated habitats decides most poultry applications. Screening distances, critical loads, dispersion modelling and mitigation that stands up.

Read article →
Rural and Agricultural7 min read

Manege applications: drainage, lighting and landscape

A manege is not agricultural development, so it needs full permission. Applications turn on surface water, floodlighting and how the arena sits in the landform.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope