Fire, Structural and Basements
Planning Gateway One, fire statements, structural surveys and basement impact assessments.
Latest in Fire, Structural and Basements
335 articlesHabitable basements in a flood zone and the sequential approach
Basement dwellings sit in the highly vulnerable class in flood risk policy. That decides which zones they are possible in, which tests apply and what the flood risk assessment has to prove.
Battery storage fire risk at the planning stage
Separation, firewater and containment set the layout of a battery storage site. The fire and rescue response is the consultation that decides these applications.
EV charging in enclosed car parks and the fire case
Charging provision is required by building regulations and local policy. Enclosed parking makes a battery fire harder to fight. The layout has to solve both at planning stage.
Gateway Two and Three and what they mean for a programme
Gateway Two stops construction starting and Gateway Three stops occupation. Both sit outside planning, and both reshape the programme of a consented higher-risk scheme.
Basement light wells, vaults and the public highway
Planning permission covers what shows. Sections 179 and 180 of the Highways Act 1980 cover the structure under the pavement, and neither answers who owns the ground.
Fire statement content: the matters Article 9A lists
The fire statement is a prescribed form, not a report you structure yourself. Here is what each matter needs at planning stage, and what belongs in the later strategy.
Fire safety strategy and fire statement: which one when
A fire statement shows fire safety has shaped the proposal while the layout can still change. A BS 9991 strategy shows how the building complies with Part B. They are not interchangeable.
Piling near a railway, tunnel or sewer: asset protection
The asset owner's consent sits outside the planning permission. What triggers a separate process, what the agreement covers, and why it is usually the critical path.
Retaining an existing frame: the retrofit appraisal
Where a plan expects reuse before demolition, the appraisal has to quantify capacity, condition and adaptability, and use the same assumptions as the carbon assessment.
Basement under a protected tree: roots and consent
Cellular confinement spreads load above undisturbed roots and does nothing for an excavation. What actually decides whether a basement under a protected tree is possible.
Basement waterproofing grades and what to show
The grade of internal environment drives the whole waterproofing design, and pump resilience is the part a planning officer will press hardest on.
Basement impact assessment: the three strands councils want
A basement impact assessment is a framework, not a document. Three strands, three stages, an independent audit, and the strand applicants usually underestimate.
Measuring height for the 18 metre fire statement threshold
Height for a fire statement is measured from the lowest adjacent ground level to the floor surface of the top storey, excluding roof-top plant. The storey count is a separate test and either one triggers the requirement.
Plant screens, enclosures and separation distances for substations
There is no single separation standard for a substation. Operator access rules, BS 4142 noise assessment and street frontage design all pull on the same position, and all three belong on the first layout.
Shoring and temporary works during demolition
Planning does not approve temporary works, but propping footprint, highway occupation and party wall stability all constrain the permanent scheme. Resolve them at design stage, not after permission.
Excavating a swimming pool in a garden
Class E of the GPDO covers a swimming pool in a domestic garden, but the enclosure, the plant room, twenty lorries of spoil and the backwash discharge are where schemes come unstuck.
Rooftop plant and the capacity of an existing roof
An existing roof usually has very little spare capacity, and the reserve it appears to have is often in the slab rather than in the beams carrying it.
Building beside railway infrastructure: asset protection
The council decides the application. The infrastructure manager decides whether your piling rig, your crane and your drainage are acceptable next to a live railway.
Transfer structures over a commercial ground floor
The transfer zone sits between the commercial ceiling and the first residential floor, and it is additive. Developers usually discover that after the massing is fixed.
Modular construction: what the planning submission must fix
A modular system stacks a ceiling cassette on a floor cassette at every junction. Over six storeys that extra floor zone can take a scheme over a height limit expressed in metres.
Flood resilient construction and its structural effects
Standing water is heavy, it pushes sideways and it lifts. A wall detailed to exclude a metre of water carries loads an ordinary cavity wall was never designed for.
Made ground and fill: the structural consequences
The question to ask a geotechnical engineer is not whether the fill will take the load. It is how much the depth varies, and over what distance.
Smoke control shafts and plant space on planning drawings
The shaft takes area out of every storey and the plant takes a room at roof level with a louvre on an elevation. Neither appears in a concept design unless someone puts it there.
What changes after planning at Gateway Two and Three
Planning permission on a higher-risk building settles the shape and little else. Gateway Two precedes construction and Gateway Three precedes occupation, and both are run by the regulator.