Costs, Fees and Budgeting7 min read

Phasing fees across outline and reserved matters

A two-stage consent means a fee at outline and a further fee for each reserved matters submission. How the arithmetic works and when a full application costs less.

Read article →
Costs, Fees and Budgeting7 min read

What a planning budget covers and what belongs in build cost

The planning budget is cash spent before you own a consent. Allocating surveys, fees and condition compliance correctly keeps the self-build mortgage drawdown and the planning spend apart.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting for the local validation checklist

Local validation requirements drive the cost of an application pack, not the national list. Price each triggered item as a named line before quoting, and challenge the items that cannot be material.

Read article →
Costs, Fees and Budgeting7 min read

Heritage budgeting: desk assessment against intrusive recording

Heritage spend splits between desk-based analysis and intrusive recording or evaluation. The recording level and the post-excavation assumption decide what the client actually pays.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a transport evidence base by scheme size

The transport evidence base scales in steps. Work out which document the authority requires before commissioning surveys, and order the low cost work so it de-risks the expensive work.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting an ecology package across the survey seasons

Ecology cost is driven by which month you start, not by day rates. Commission the appraisal in autumn, book spring survey slots, and price a second season as a named line.

Read article →
Costs, Fees and Budgeting8 min read

What an appeal actually costs beyond the Inspectorate

No fee is payable to lodge an appeal in England, so the budget is professional time, expert evidence and months of delay. The step from written representations to an inquiry is not incremental.

Read article →
Costs, Fees and Budgeting8 min read

How a community infrastructure levy charging schedule works

Levy liability is arithmetic rather than negotiation. The money is won or lost on the floorspace measurement, the in-use building offset and the order in which the forms are submitted.

Read article →
Costs, Fees and Budgeting7 min read

Resubmission fee exemptions and whether one applies to you

The repeat application fee exemption in the 2012 Fees Regulations was removed for applications made on or after 6 December 2023. Other exemptions survive, including the Article 4 one, and they are routinely missed.

Read article →
Costs, Fees and Budgeting7 min read

How full application fees are calculated by units and area

Dwellings are charged per unit, other buildings on floorspace created, outline applications on site area. Mixed schemes add the categories together rather than merging them.

Read article →
Costs, Fees and Budgeting8 min read

Costing a stopping up order for a highway or footpath

Public rights do not lapse through disuse and planning permission does not override them. This covers the section 247 and 257 routes, what objectors actually argue about, and how to keep the order off the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Costing an affordable housing review mechanism

Early and late stage review mechanisms are decided by their definitions, not their headline percentages. This covers the inputs that move the answer, who pays for the review and the caps to secure before signing.

Read article →
Costs, Fees and Budgeting7 min read

Costing an employment land assessment for an allocated site

On an allocated employment site the fee sits in evidence gathering, not analysis. This covers the marketing records councils expect, the suitability tests that decide it, and how to sequence the work.

Read article →
Costs, Fees and Budgeting7 min read

Costing an odour assessment for a kitchen or waste use

The fee for an odour assessment depends on whether the council accepts a qualitative risk based appraisal or expects dispersion modelling. Here is what sits behind each, and how to scope the work before you commission it.

Read article →
Costs, Fees and Budgeting6 min read

Costing a telecommunications compliance declaration for a mast

An ICNIRP declaration is produced by the operator's own radio engineers and closes the health issue. Siting and appearance are the only matters the council can decide on.

Read article →
Costs, Fees and Budgeting6 min read

Costing an equalities impact assessment for a public applicant

The public sector equality duty is continuing, so an equalities impact assessment has to be revisited at every material change. Budgeting for one document is the common mistake.

Read article →
Costs, Fees and Budgeting6 min read

Costing a health impact assessment where policy requires one

A rapid health impact assessment and a full one differ by an order of magnitude in cost. Agreeing the scope with the public health team before anyone is appointed controls the budget.

Read article →
Costs, Fees and Budgeting6 min read

Costing a pre-redevelopment audit for reclaimed materials

A pre-redevelopment audit prices on access rather than floor area. Record drawings, an existing asbestos survey and an empty building cut the cost sharply.

Read article →
Costs, Fees and Budgeting6 min read

Costing an asbestos refurbishment and demolition survey

Access and making good drive the cost of a refurbishment and demolition survey, not the sample count. It also sits ahead of every other intrusive appointment on the programme.

Read article →
Costs, Fees and Budgeting6 min read

Costing an overheating risk assessment under TM59

The modelling is a day or two of work. Settling the inputs and re-running after each facade change is where a TM59 fee actually goes.

Read article →
Costs, Fees and Budgeting6 min read

Budgeting ground investigation across two phases

Drilling is rarely the biggest item. Gas monitoring visits spread over months and the laboratory schedule set both the cost and the programme of a phase 2 investigation.

Read article →
Costs, Fees and Budgeting6 min read

Costing a BREEAM pre-assessment and the certification route

Only the pre-assessment is needed at planning stage. Registration, design stage and post-construction certification are charged separately, and construction evidence gathering is the cost most projects miss.

Read article →
Costs, Fees and Budgeting7 min read

What verified views cost on a tall building scheme

Rendering a photomontage is quick. Surveying the camera position, registering the model to surveyed targets and documenting the chain is what makes a view verified, and what sets the fee.

Read article →
Costs, Fees and Budgeting7 min read

What a wind microclimate assessment really costs

The cost of wind microclimate work is set by how many configurations go through the tunnel. Scoping the measurement points, the mitigation variant and the cumulative schemes decides the fee before anyone is appointed.

Read article →