Latest in London

74 articles
London7 min read

Wind microclimate assessment for a London tower

A usable wind assessment names its test locations, states the criteria and season for each, and includes consented but unbuilt neighbours in a cumulative scenario.

Read article →
London7 min read

Energy strategy: Be Lean, Be Clean, Be Green, Be Seen

The London energy hierarchy is four steps, and the fourth commits you to reporting metered performance for years after occupation. Here is what each stage has to evidence.

Read article →
London7 min read

Play space on a London podium: making the deck work

Podium play space is judged on whether it functions, not on whether it measures 10 m2 per child. Here is how supervision, loading, drainage and wind shape the deck.

Read article →
London7 min read

Housing design standards: space, aspect and dual aspect

London residential schemes are tested against the national space standard, a tighter ceiling height, a dual aspect expectation and limits on units per core. Those four together decide whether a layout works.

Read article →
London7 min read

Fire safety and policy D12 in a London application

Policy D12 of the London Plan asks every development to meet the highest standards of fire safety and asks major schemes for a statement from a suitably qualified independent assessor. It overlaps with Planning Gateway One without replacing it.

Read article →
London6 min read

Water consumption targets and how to reach 105 litres

The 105 litre target in London is delivered through the optional requirement in Part G of the Building Regulations, imposed by planning condition. Here is how the calculator works and which fittings actually get you there.

Read article →
London7 min read

Industrial land: policy E7 and no net loss of capacity

London industrial land policy starts from retention, not release. Here is how the capacity test works, what intensification and co-location mean in practice, and the evidence a borough will expect before it accepts any loss.

Read article →
London7 min read

Small sites policy and what it supports in outer London

Policy H2 gives small residential schemes in London a presumption in their favour. Knowing which category your site falls into is most of the argument.

Read article →
London7 min read

Tall buildings and policy D9: location, design, impact

Policy D9 only supports tall buildings where the borough has identified suitable locations. The design and impact limbs decide the rest.

Read article →
London7 min read

Carbon offset payments and the borough offset fund

A carbon offset payment covers the gap between what a London scheme achieves on site and net zero carbon. Here is how the sum is worked out and secured.

Read article →
London6 min read

Urban Greening Factor: hitting the target score

The Urban Greening Factor is a weighted area calculation against the whole site area. On a dense site the score is decided by substrate depths and tree soil volumes settled at concept stage.

Read article →
London7 min read

Design review panels and the weight of their advice

A design review panel advises, it does not decide. What decides the outcome is whether the panel report was tied to policy and whether you answered it.

Read article →
London7 min read

Inclusive design statements for London schemes

An inclusive design statement follows the user through the scheme rather than listing standards. Policy D5 and D7, evacuation lifts, wayfinding and the management plan.

Read article →
London6 min read

Waste capacity and borough apportionment in London

Policy SI 8 of the London Plan 2021 safeguards existing waste sites and apportions tonnage to each borough. Losing capacity means replacing it, measured at maximum throughput.

Read article →
London7 min read

The Thames Policy Area and riverside development

The constraints on a Thames-side site are knowable before anyone draws a plan. River prospects, wharf safeguarding, the raised defence level and the river works licence.

Read article →
London7 min read

Protected London squares under the 1931 Act

Planning permission does not authorise what the 1931 Act prohibits. What the schedules protect, the use and structure restriction, and the four consent regimes that overlap.

Read article →
London6 min read

Loss of existing homes and London Plan Policy H8

Policy H8 catches demolition, change of use and amalgamation alike. Report units, floorspace and habitable rooms separately, and build the condition case on measured evidence.

Read article →
London8 min read

Large scale purpose built shared living in London

Shared living is not C3, not C4 and not an HMO, so the permission's own wording defines it. The H16 criteria, the contribution mechanism, and what boroughs actually test on room and communal space quality.

Read article →
London7 min read

Student accommodation and nomination agreements in London

Policy H15 makes the nomination agreement central to a purpose-built student scheme in London. What the obligation has to cover, how the affordable element is capped, and the evidence boroughs expect on need.

Read article →
London7 min read

What replaced the London Plan density matrix

The 2016 density matrix gave applicants a cell in a table to argue inside. Policy D3 replaced it with a design-led process, which means capacity now has to be evidenced through tested options and quality checks.

Read article →
London7 min read

Hot food takeaways and the 400 metre school distance

The London restriction on new hot food takeaways near schools is measured as a walking distance from school entrances and exits. What that catches, and the four arguments that get used.

Read article →
London8 min read

Metropolitan Open Land and its Green Belt equivalence

Metropolitan Open Land imports Green Belt protection through London Plan Policy G3. What that means for exceptions, openness assessment and why grey belt arguments do not transfer.

Read article →
London8 min read

Air quality neutral benchmarks in London

Air quality neutral is a two-part calculation against published building and transport benchmarks. What sits in each stream, where the inputs go wrong, and when offsetting is allowed.

Read article →
London7 min read

Water consumption targets for London residential schemes

The 105 litre figure in Policy SI 5 is the London Plan's way of invoking the tighter Part G optional requirement, which applies only where a planning condition imposes it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope