Latest in AI and Planning

85 articles
AI and Planning7 min read

Measuring whether a drafting tool saved time

Measure the whole cycle from instruction to a document you will sign, including verification and rework. Without a baseline from your own time records, there is nothing to compare.

Read article →
AI and Planning7 min read

Why a devolved application needs a different policy base

An English policy base does not transfer to Wales, Scotland or Northern Ireland. The plan hierarchy, the statutory duties, the flood framework and the terminology all change.

Read article →
AI and Planning7 min read

Supplying planning history rather than a postcode

Article 3(4) of the GPDO means a condition on a forty-year-old permission can remove permitted development rights. That record exists only on the authority's register, so it has to be supplied.

Read article →
AI and Planning7 min read

Using an AI draft for pre-application submissions

Pre-application advice is bought officer time, so spend it on specific questions rather than on a policy appraisal. An AI draft can build the document, but the site facts and the questions are yours.

Read article →
AI and Planning7 min read

Keeping an audit trail for a machine-drafted document

The record of which source each fact was checked against, by whom and when, is what answers a cross-examination in a sentence instead of a week of reconstruction.

Read article →
AI and Planning7 min read

Why a site visit cannot be skipped

Datasets give you flood zones and listing entries. Levels, boundary positions, neighbouring window heights and visibility splays come from standing on the plot with a tape measure.

Read article →
AI and Planning7 min read

Splitting the drafting from the judgement calls

Two thirds of a planning statement records facts that already exist. The rest is argument that carries liability. Knowing which is which decides where consultant time is worth paying for.

Read article →
AI and Planning7 min read

Spotting invented case law in a planning document

A fabricated citation looks right. The two failures are a reference that does not exist and a real case cited for something it does not say. The second slips through more often.

Read article →
AI and Planning7 min read

The limits of a desk-based heritage statement

Significance sits in the fabric, so it has to be inspected. Desk work can carry the duties, the asset inventory and the methodology, but never the assessment itself.

Read article →
AI and Planning7 min read

What AI cannot do in a biodiversity net gain assessment

Habitat type and condition are observed on site by a competent person. That is why a drafted document can carry the narrative of a BNG assessment but never the baseline.

Read article →
AI and Planning7 min read

Checking an AI draft against the validation checklist

The local list published under Article 11 is the document an application is actually validated against. Map every item to a file, and remember that no drafting tool produces drawings.

Read article →
AI and Planning7 min read

Why an adopted local plan still has to be read in full

Section 38(6) makes the development plan the starting point, which means the supporting text, the policies map and the allocation requirements all count, not just the policy wording.

Read article →
AI and Planning8 min read

Professional indemnity and AI-assisted planning documents

The cover and the duty are unchanged: reasonable skill and care in providing professional services. What changes is what insurers ask at renewal and what your files must show.

Read article →
AI and Planning7 min read

Can an AI-drafted planning statement be submitted as is

The drafting method does not shift responsibility. Whoever signs the application form owns every fact in the pack, and the ownership certificate carries criminal liability.

Read article →
AI and Planning6 min read

Why an AI draft flags a missing site fact

A plausible invented floor level is worse than a blank, because nobody checks it. How to read the flags in a draft as a scope document for the application.

Read article →
AI and Planning6 min read

What a validation officer checks that AI cannot know

Validation turns on administrative facts about a specific site, owner and council. The six checks to run on a drafted report before it is submitted.

Read article →
AI and Planning7 min read

Where site judgement cannot be drafted in a design statement

A draft can carry the structure, the policy references and the checklist. Context, character and the access arrangements that depend on levels come from looking.

Read article →
AI and Planning6 min read

Explaining an AI-assisted draft to a client or a committee

Sooner or later a client, an officer or an objector asks how a document was produced. A planner who has thought about the answer in advance gives a better one.

Read article →
AI and Planning7 min read

Why planning applications are returned as invalid

Validation is a completeness check against the national requirements and the council's own local list. Here are the defects that cause a return and how to deal with an invalidity notice.

Read article →
AI and Planning7 min read

Drafting to an appeal deadline without cutting corners

Appeal timetables do not move, and a statement of case submitted late is normally returned unread. Here is where drafting buys time and where only evidence will do.

Read article →
AI and Planning7 min read

Version control when report sections are regenerated

A report assembled from independently produced sections is only consistent if somebody checks it after the last edit. The dependencies that break, and the controls that catch them.

Read article →
AI and Planning7 min read

What AI drafts get right, and wrong, in planning reports

A drafting tool knows what a Transport Statement contains. It does not know what the traffic count said. Where the real review time goes on an AI-assisted planning document.

Read article →
AI and Planning7 min read

Using drafted documents to discharge planning conditions

Conditions asking for details, samples and schemes need different submissions. Where AI-assisted drafting helps, where a licensed professional is legally required, and what causes refusals.

Read article →
AI and Planning7 min read

Editing a drafted heritage statement to match the asset

A drafted heritage statement describes a type of building well and yours poorly. The edit that matters replaces generic description with what is actually there and assesses effect element by element.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope