Latest in Constraints and Designations

294 articles
Constraints and Designations7 min read

Nominating a building to a local heritage list

A locally listed building is a non-designated heritage asset, so applications affecting it attract a balanced judgement. What a nomination needs and what the listing does not do.

Read article →
Constraints and Designations7 min read

Veteran tree identification and who can confirm it

Ancient and veteran trees are irreplaceable habitats in national policy whether or not they are mapped or covered by a Tree Preservation Order. How status is established and challenged.

Read article →
Constraints and Designations7 min read

Policies map notations that are not designations

Regulation 9 of the 2012 Local Planning Regulations makes the policies map an illustration of policy, not a free-standing instrument. How to tell a designation from an indicative annotation.

Read article →
Constraints and Designations7 min read

When a conservation area appraisal is out of date

Conservation area appraisals carry no statutory review interval, so many predate the current local plan. What weight an old appraisal holds, and how to test a description that no longer matches the street.

Read article →
Constraints and Designations7 min read

Plantation on an ancient woodland site and its protection

A plantation on an ancient woodland site is still ancient woodland, because the designation attaches to soil continuity rather than to the trees standing on it.

Read article →
Constraints and Designations7 min read

A designations checklist before exchanging contracts

Standard searches cover local land charges, not environmental designations. The constraints that stop a self-build plot being developable usually have to be looked up directly.

Read article →
Constraints and Designations7 min read

Safeguarding directions for major infrastructure schemes

A safeguarding direction tells councils to consult the scheme promoter and to refuse development that would prejudice a major project. It will not show up in the local plan or a standard search.

Read article →
Constraints and Designations7 min read

Marine licensing where a site reaches the tideline

A site that reaches the foreshore sits in two consent regimes at once. Planning permission runs to the low water mark, while marine licensing starts at mean high water springs.

Read article →
Constraints and Designations6 min read

Safeguarded land between Green Belt and settlement

Safeguarded land escapes Green Belt policy without gaining an allocation. The real work is in the plan review, not in an early application.

Read article →
Constraints and Designations7 min read

Which designations trigger an EIA screening opinion

A sensitive area does not require EIA. It removes the size thresholds, so any project of a Schedule 2 description must be screened however small it is.

Read article →
Constraints and Designations7 min read

Protected open space and the policy exceptions

Policy offers three ways through an open space designation: surplus against an up-to-date assessment, equivalent or better replacement, or alternative recreational provision. Nothing else counts.

Read article →
Constraints and Designations7 min read

Green and wildlife corridors: what the policy restricts

A mapped wildlife corridor protects the ability of species to move, not the intrinsic value of the land it crosses. That changes how severance, lighting and permeability are assessed.

Read article →
Constraints and Designations7 min read

Interim protection while a designation is being made

An immediate Article 4 direction, a provisional tree preservation order and a building preservation notice all take effect before any confirmation. Other designations carry nothing until they are made. Knowing which is which changes your programme.

Read article →
Constraints and Designations6 min read

A site adjoining a designation in the next authority

Where a designation sits in the neighbouring authority's area, your application is still decided under your own council's development plan. The effects on the designation are material all the same, and the evidence has to satisfy two readers.

Read article →
Constraints and Designations7 min read

Multiple designations on one site: sequencing assessments

On a constrained site the order you commission work in decides the programme. Season-bound surveys and scheme-stopping designations come first.

Read article →
Constraints and Designations7 min read

Neighbourhood plans and the weight a made plan carries

Once a neighbourhood plan is made it is part of the statutory development plan. That changes how an application is decided, not just how it is debated.

Read article →
Constraints and Designations6 min read

Defence safeguarding and the Ministry of Defence response

Safeguarded defence land sits over large areas of England without appearing on most constraint checks. Here is how the consultation works and what triggers it.

Read article →
Constraints and Designations7 min read

Scheduled monuments at risk and what the register does

Register entry changes nothing about scheduled monument consent under the 1979 Act. It records condition and vulnerability, which helps an owner managing the asset and hurts one who neglects it.

Read article →
Constraints and Designations7 min read

Agricultural land grade 3a or 3b and why it matters

Grades 1, 2 and 3a are best and most versatile land. Grade 3b is not. Provisional Agricultural Land Classification maps show grade 3 undivided, so only a field survey to the 1988 guidelines can settle it.

Read article →
Constraints and Designations7 min read

When priority habitat inventory entries are wrong

The priority habitat inventory is assembled from surveys of varying age and method, so polygons often do not match the ground. Only a properly seasoned survey by a competent ecologist will displace one.

Read article →
Constraints and Designations7 min read

Local nature recovery strategies in applications

A local nature recovery strategy is not a development plan document, but it sets the strategic significance category in the statutory biodiversity metric and authorities must have regard to it under section 40 NERC.

Read article →
Constraints and Designations7 min read

Article 2(3) land: where householder rights shrink

Conservation areas, National Landscapes, National Parks, the Broads and World Heritage Sites are Article 2(3) land. That designation strips several Part 1 householder rights automatically, before any Article 4 direction is considered.

Read article →
Constraints and Designations8 min read

Spot listing requests and how they stall an application

A listing request needs no standing and no fee, and it can stop a programme in a fortnight. This covers deferral, building preservation notices, compensation when a notice lapses, and certificates of immunity.

Read article →
Constraints and Designations7 min read

Correcting an error in a published constraints layer

A case officer cannot move a flood zone or redraw a listing. This sets out which body holds each primary record, what a correction request needs, and how to submit an application while one is pending.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope