London articles – page 3

74 articles
London7 min read

Responding to a GLA stage one report on a London scheme

A stage one report gives you a dated list of London Plan objections and a window to answer them before the borough decides. Here is how to use that window, and what the Mayor can do at stage two.

Read article →
London8 min read

Mayoral levy bands and how they apply to a London scheme

Mayoral CIL is charged across every London borough on top of the borough's own levy, collected by the borough and indexed annually. How the bands work and which deadlines lose you an exemption.

Read article →
London6 min read

Article 4 directions in London and office to residential

An Article 4 direction does not make a conversion unacceptable. It removes the Class MA shortcut and puts the scheme in front of the borough on its merits, with a London Plan evidence base behind it.

Read article →
London7 min read

Applying BRE 209 daylight guidance in dense London

The BRE guide's numerical targets are advisory and invite contextual application. How to derive a defensible contextual target rather than asserting one.

Read article →
London7 min read

Protecting public houses in a London application

Losing a pub in London needs authoritative marketing evidence and a policy case. What boroughs scrutinise, and why retaining a workable pub is the safer route.

Read article →
London7 min read

Industrial land in London: no net loss and SIL policy

No net loss applies to industrial capacity, not to the floorspace that happens to be standing. What that means for intensification, co-location and release cases in London.

Read article →
London7 min read

Optimising site capacity under London Plan policy D3

Density is now an output of the design process in London, not an input. Here is how to build a design-led capacity study that an officer can follow and a borough will accept.

Read article →
London6 min read

Opportunity Areas: what a London allocation changes

An Opportunity Area signals growth, not a site allocation. Here is what the designation actually changes for your application and where it carries less weight than it looks.

Read article →
London6 min read

Inclusive design: M4(2) and M4(3) in London applications

At least 10 per cent of new London homes must meet M4(3) wheelchair user standards, with the rest at M4(2). Here is how each standard shapes the plan and what to submit.

Read article →
London6 min read

Housing design standards under London Plan policy D6

Policy D6 adds ceiling heights, dual aspect expectations, outdoor space minimums and core limits on top of the national space standard. Here is how boroughs test each one.

Read article →
London6 min read

Archaeological Priority Areas and when evaluation is needed

Archaeological Priority Areas tell London boroughs where buried archaeology is a material consideration. Here is what each tier implies for your application and programme.

Read article →
London7 min read

Protected vistas and the London View Management Framework

London protects designated views with mapped geometry rather than policy wording. If your site sits in an assessment area, the framework sets your upper floors before design begins.

Read article →
London7 min read

Which applications are referable to the Mayor of London

Referral is automatic on the facts set out in the Mayor of London Order 2008. The borough still decides, but it cannot issue a decision without going through the Mayor twice.

Read article →
London7 min read

Mayoral CIL: bands, rates and when it becomes payable

The Mayor charges a levy on new floorspace across all of Greater London, on top of the borough charge. The banding, the six-month lawful use deduction and the commencement notice decide what you actually pay.

Read article →
London6 min read

The sustainable drainage hierarchy in London

Each step above your chosen drainage solution has to be rejected on evidence. The London hierarchy in order, and the five things a borough officer checks.

Read article →
London6 min read

Air Quality Neutral and Air Quality Positive explained

One is a benchmark calculation, the other a design process for large schemes. What each requires, what evidence boroughs expect and where assessments fail.

Read article →
London6 min read

Circular Economy Statements: who needs one and what it covers

A London requirement rather than a national one. What a Circular Economy Statement covers, how it is evidenced, and how it must line up with the carbon assessment.

Read article →
London6 min read

Whole life carbon assessments for referable schemes

What a whole life carbon assessment has to cover for a scheme referable to the Mayor, from module structure and benchmarks to the post-construction submission.

Read article →
London6 min read

The energy hierarchy in a London energy statement

How to argue each stage of the London Plan energy hierarchy in an energy statement, including the monitoring duty that applicants most often underestimate.

Read article →
London6 min read

Cycle parking standards for a London application

London Plan cycle parking standards are minimums by land use. How the residential calculation works, what the store dimensions have to allow for, and what boroughs add on top.

Read article →
London7 min read

Car-free development and residential parking policy

Car-free means no general residential parking plus a section 106 clause barring occupiers from parking permits. How PTAL drives the standard and what can still be argued.

Read article →
London6 min read

Play space provision and the 10 square metre standard

The London Plan sets a minimum of 10 m² of playable space per child for schemes of ten or more homes. The child yield calculation, the age band distances and what boroughs count.

Read article →
London6 min read

Agent of change: protecting existing noise generators

Agent of change makes the newcomer responsible for mitigating the noise of an established use. The principle is strong on paper, and its limits show up once residents move in.

Read article →
London6 min read

Tall buildings under policy D9: where and how assessed

Policy D9 makes location the first question and the assessment criteria the second. Boroughs define what counts as tall, identify where it is acceptable, and then test visual, functional, environmental and cumulative effects.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope