Rural and Agricultural articles – page 3

134 articles
Rural and Agricultural7 min read

Alpacas, llamas and unusual livestock: is it agriculture

Alpacas kept for fleece are livestock and the land stays in agricultural use. Alpacas kept as pets or for trekking are neither, and that changes what you can build.

Read article →
Rural and Agricultural7 min read

Grazing horses or keeping them: the use class line

The statutory definition of agriculture covers the use of land as grazing land but not the keeping of horses for recreation. That single distinction decides whether you need planning permission.

Read article →
Rural and Agricultural7 min read

Converting a redundant dairy under Class R

Class R lets a redundant farm building take a commercial use without a planning application, up to a cumulative floorspace cap. It permits the use, not the building work, which is where most schemes come unstuck.

Read article →
Rural and Agricultural8 min read

Manure and straw storage: siting away from neighbours

Manure and straw storage rarely needs its own planning application, yet siting decides whether the farm gets complaints, an abatement notice or a refusal. The distances that matter come from three separate regimes.

Read article →
Rural and Agricultural7 min read

Proving lawful agricultural use with a certificate

A certificate of lawfulness is the only formal confirmation that land or a building is lawfully agricultural, and on a barn conversion it is the document the deal rests on.

Read article →
Rural and Agricultural7 min read

Rural exception sites and the local connection test

A rural exception site is land that would not normally be released for housing. The local connection criteria and the evidence behind them are what make the exception defensible.

Read article →
Rural and Agricultural7 min read

Shepherd huts: caravans, licences and permission

If a shepherd hut meets the statutory definition of a caravan, the planning question is the use of the land rather than the structure. Fix it to a plinth and that changes.

Read article →
Rural and Agricultural7 min read

The 28 day camping allowance in practice

Class B of Part 4 permits temporary use of land for 28 days a year. The allowance belongs to the land, not to the operator, and the day count is yours to prove.

Read article →
Rural and Agricultural6 min read

Agricultural land grades and solar farm siting

The published maps do not separate grade 3a from 3b, and that single gap is why so many solar applications end up commissioning a field survey they had not budgeted for.

Read article →
Rural and Agricultural6 min read

Anaerobic digestion on a dairy farm

A digester fed on your own slurry and spread on your own land is one proposition. The same tanks fed by imported waste, with gas going to the grid, is a different planning application entirely.

Read article →
Rural and Agricultural6 min read

Siting a grain store on an exposed ridge

On a ridge, the prior approval question stops being a formality. Siting, cladding colour and cut levels decide whether a grain store reads as a farm building or as an object on the skyline.

Read article →
Rural and Agricultural7 min read

Where ancillary farm shop sales end

A farm selling its own produce at the gate is usually still farming. Add a coffee machine, a chiller of bought-in cheese and a car park, and at some point it becomes a shop. Here is where the line sits.

Read article →
Rural and Agricultural7 min read

A private menage: siting, surfacing and lighting

Levelling, drainage and surfacing are engineering operations, and recreational horse keeping is not agriculture. What a menage application has to cover, and what gets refused.

Read article →
Rural and Agricultural8 min read

Seasonal worker accommodation on a fruit farm

Seasonal accommodation is assessed as ancillary to the farm business, not as housing. The caravan licensing exemption is the first thing to test, then a temporary permission.

Read article →
Rural and Agricultural7 min read

Proving the five hectare test for agricultural rights

Part 6 agricultural permitted development turns on the size of the unit you occupy. Here is what counts towards five hectares, what Class B allows below it, and the evidence to keep.

Read article →
Rural and Agricultural6 min read

Mineral and waste safeguarding on farmland

Safeguarding areas exist so that housing and farm development do not quietly sterilise a sand and gravel resource. On farmland they catch schemes nobody expects them to catch.

Read article →
Rural and Agricultural6 min read

Hedgerow removal notices and the important hedgerow test

The Hedgerows Regulations 1997 run alongside planning permission, not inside it. Serve the notice, wait the 42 days, and know which criteria make a hedgerow important before you start.

Read article →
Rural and Agricultural6 min read

Livery yards and the point horses become a business

Grazing horses on farmland can be agriculture. Keeping them, stabling them and charging other people for the privilege is a different planning use. Here is where the line sits and what evidence settles it.

Read article →
Rural and Agricultural6 min read

Farm diversification into workshops and offices

Test the permitted development route first. Prior approval avoids biodiversity net gain and a full consultation, but the floorspace cap applies across the whole agricultural unit.

Read article →
Rural and Agricultural6 min read

Camping and caravan use under the 60 day right

The general temporary use right and the recreational campsite right are separate allowances with separate day counts. Records decide enforcement cases, so keep them as you go.

Read article →
Rural and Agricultural6 min read

Poultry units: scale, odour and the screening question

A poultry unit application turns on three thresholds: 500 m2 of new floorspace for EIA screening, 40,000 bird places for an environmental permit and 85,000 broiler places for mandatory assessment.

Read article →
Rural and Agricultural7 min read

Selling part of a holding: certificates and notices

Ownership certificates A to D turn on who owned the land twenty-one days before submission. Selling a field, a verge or a splay changes the answer, and agricultural tenants need their own notice.

Read article →
Rural and Agricultural6 min read

Forestry permitted development and what it allows

Forestry permitted development covers buildings and tracks reasonably necessary for forestry, subject to height limits and prior notification. It never permits a dwelling and it says nothing about felling.

Read article →
Rural and Agricultural7 min read

Proving ten years of breach of an occupancy condition

Ten years of continuous breach of an agricultural occupancy condition can be confirmed by a lawful development certificate. The application is decided on facts, so the chronology is the whole case.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope