Commercial Occupiers

A tattoo studio, piercing or aesthetics clinic

6 min readBy PlanScope Editorial Team

Beauty and aesthetics premises usually sit in Class E, but tattooing and piercing are treated as sui generis by some councils. Registration, sharps waste, shopfront privacy and hours are where these applications turn.

A tattoo studio, a piercing shop and an aesthetics clinic all raise the same first question, and it does not have a single answer: which use class applies. Beauty and aesthetics premises generally sit in Class E, medical practitioners providing treatment sit in Class E(e), and tattooing and body piercing are treated by some councils as a Class E service and by others as sui generis, outside the class system altogether. That disagreement is why so many operators sign a lease and then discover they need planning permission after all.

Which use class the activity falls into

Since September 2020, Class E has absorbed shops, financial and professional services, restaurants and cafes, indoor sport and fitness, creches, medical and health services, and offices and light industry. Moving between any of those is not development and needs no permission.

An aesthetics clinic offering injectables under a registered medical practitioner reads as Class E(e), medical or health services. A beauty salon offering facials, waxing and laser treatment reads as a Class E service. Both usually sit comfortably within a unit that was previously a shop or an office.

Tattooing and body piercing are the contested ones. The activity is a service provided to visiting members of the public, which suggests Class E, but it does not fit neatly into any of the lettered sub-classes and several authorities treat studios as sui generis, partly because of the amenity and character concerns that attach to them in shopping frontages. There is no national answer. Ask the council before you commit, and where the answer matters commercially, apply for a certificate of lawfulness for a proposed use under section 192 of the Town and Country Planning Act 1990. That certificate is conclusive and a landlord's solicitor will accept it.

Two other traps. A restrictive condition on an earlier permission overrides the flexibility of the Order, so a unit conditioned to retail sales only needs a section 73 application. And an Article 4 direction in a protected shopping frontage can withdraw the relevant rights entirely.

Registration and licensing, separate from planning

Planning permission is only one of the consents involved, and the other one is often the more onerous.

Outside London, registration for tattooing, cosmetic piercing, semi-permanent skin colouring, acupuncture and electrolysis is dealt with by the local authority under Part 8 of the Local Government (Miscellaneous Provisions) Act 1982. Both the practitioner and the premises have to be registered, and the authority imposes byelaws covering hygiene, sterilisation, cleanliness of premises and record keeping. Operating without registration is an offence.

In London the position is different: the London local authority legislation provides for special treatment licences covering a wider range of treatments, administered borough by borough with their own standards and inspection regimes.

Aesthetics practice adds a further layer again, since treatments carried out by regulated healthcare professionals engage professional regulation and, for some services, registration with the health regulator. None of that is a planning matter, and a planning condition attempting to control clinical standards would duplicate other legislation. Say so in the Planning Statement so the case officer does not try.

Apply for registration early. Environmental health officers inspect the fitted premises, and a fit-out designed without reference to their requirements gets redone.

Clinical and sharps waste arrangements

Needles, cartridges, contaminated wipes and used single-use equipment are clinical waste, and the duty of care under section 34 of the Environmental Protection Act 1990 applies from the moment they are produced until a licensed carrier takes them away.

Planning controls the storage, not the waste stream. Show a lockable, screened external store on the site plan, sited where a collection vehicle can reach it and away from windows of flats above or next door. The most common refusal reason for small clinical units on high streets is a bin arrangement in a shared rear yard that the residential occupiers use as well.

For an internal arrangement in a small unit with no rear access, explain how sharps containers are held securely within the premises and collected from the front at agreed times. Officers accept that where it is set out honestly and refuse it where the drawing simply omits the bins.

Shopfront privacy and window treatments

Clients want privacy. Local plans want active frontages. That tension produces more refusals in this sector than anything else.

A fully blanked-out window, obscured film to head height across the whole shopfront, or internal boarding will usually be resisted in a primary shopping frontage, and in a conservation area the objection is stronger. Solutions that work include a glazed frontage with a reception and display area at the front and treatment rooms set back, a partially obscured upper panel with clear glazing below sill level, decorative manifestation that admits light and reads as display, and internal screens rather than applied film.

Set the reasoning out in a Design and Access Statement with an elevation showing the proposed treatment. Where the shopfront is historic, expect the conservation officer to have views on fascia depth, stall riser and the survival of original joinery, and any external alteration will need permission in its own right.

Hours of operation in mixed use buildings

Studios often want to open in the evening because clients come after work. Where there are flats above, the council will condition hours, and the negotiation is easier before permission than afterwards.

Three things shape the outcome: the existing hours of the unit and its neighbours, whether access to the flats is shared, and whether amplified music is proposed. A studio playing music at volume until ten at night under a bedroom is a complaint waiting to happen. Where plant such as air conditioning is installed, a Noise Impact Assessment against the background sound level may be requested.

Offer a reasonable hours condition rather than seeking an unrestricted permission. It reads well, and an operator who later needs a later closing can apply to vary it with a trading record to support the case.

Ventilation and internal layout

There is no cooking, so extraction is rarely a planning issue. Mechanical ventilation to treatment rooms is a Building Regulations matter, and any external grille, louvre or condenser unit on a front or side elevation may need permission and will need care in a conservation area.

Internally, plan for the hygiene requirements the registration regime imposes: separate hand-washing provision in treatment areas, washable surfaces, a clean sterilisation area away from the treatment station, and storage that keeps sterile stock off the floor. Getting the layout past environmental health before submitting the planning drawings avoids applying twice.

Conditions councils attach to these uses

Expect some combination of restricted opening hours, a limit on external amplified sound, an obligation to provide and retain the waste store shown on the approved drawings, a restriction on window obscuration, and control of signage through advertisement consent.

The condition to watch is one restricting the use to the specific activity approved, which removes the flexibility Class E would otherwise give. Authorities do impose these, and they have to be justified against the national tests for conditions. If one is proposed, ask what harm it is guarding against, because a condition that locks a unit to tattooing alone hurts the operator's exit and does the street no favours either.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a tattoo studio a Class E use?

There is no national answer. The activity is a service provided to visiting members of the public, which points towards Class E, but it does not fit neatly into any lettered sub-class and several authorities treat studios as sui generis. Ask the council, and where value depends on it, apply for a certificate of lawfulness under section 192.

What registration do I need outside planning?

Outside London, both the practitioner and the premises must be registered with the local authority under Part 8 of the Local Government (Miscellaneous Provisions) Act 1982 for tattooing, cosmetic piercing, semi-permanent skin colouring, acupuncture and electrolysis, subject to byelaws on hygiene and record keeping. In London, special treatment licensing applies instead, borough by borough.

Can I obscure the shopfront for client privacy?

Not usually across the whole frontage in a primary shopping area, and the objection is stronger in a conservation area. Workable solutions keep clear glazing at eye level with reception or display at the front and treatment rooms set back, or use decorative manifestation and internal screens rather than applied film to the whole window.

Where do sharps and clinical waste go?

Under a licensed carrier contract, with the duty of care under section 34 of the Environmental Protection Act 1990 applying throughout. Planning controls the storage rather than the waste stream, so show a lockable, screened store on the site plan, reachable by a collection vehicle and away from residential windows above or next door.

Will the council restrict my opening hours?

Where there are flats above or nearby, almost certainly. The existing hours of the unit, whether access to the flats is shared and whether amplified music is proposed all shape the outcome. Offering a reasonable hours condition at application stage usually produces a better result than seeking unrestricted permission.

Can a condition stop me changing use later?

Yes. A condition restricting the premises to the specific activity approved removes the flexibility Class E would otherwise give. Such conditions have to be justified against the national tests, so ask the officer what harm it guards against. A unit locked to one activity is harder to sublet or sell on.

Sources and further reading

tattoo studioclass echange of uselicensingshopfrontcommercial planning

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Temporary use of a vacant unit for a pop up

The 28 day right in Part 4 Class B applies to land, not to buildings or land within a building's curtilage. That single limitation defeats most high street pop ups.

Read article →
Commercial Occupiers8 min read

Shared yards, servicing and refuse in a small parade

The officer's question is not whether your unit can be serviced. It is whether the yard can service your unit plus the others at the same time.

Read article →
Commercial Occupiers8 min read

A self storage facility in a former retail warehouse

The building is already the right shape. What the application has to overcome is the loss of a retail unit, and the evidence that does it is a trip generation comparison.

Read article →
Commercial Occupiers8 min read

Converting a bank branch to a restaurant

The use change from a former bank to a restaurant often needs no application. The flue route, the shopfront, the basement escape and the vaults are what decide whether the scheme works.

Read article →
Commercial Occupiers6 min read

Launderette planning: ventilation, noise and effluent

The change of use is often the easy part. Where humid air can discharge, how continuous dryer noise is assessed, and why trade effluent consent comes early.

Read article →
Commercial Occupiers6 min read

Storage and distribution in a small urban unit

For a small storage and distribution unit the application turns on vehicle movements, not floorspace. What to record, what to draw and which conditions to negotiate.

Read article →