The access and visibility section of a Transport Statement

7 min readBy PlanScope Editorial Team

The access section of a Transport Statement lives or dies on the speed survey. Here is how to set X and Y distances, show gradients and turning, and deal with splays over land you do not own.

The access and visibility section of a Transport Statement has one job: to show the highway authority that a vehicle can enter and leave the site safely at the speeds traffic actually travels on the road outside. That means a visibility splay drawn to an X distance measured back from the give way line and a Y distance measured along the carriageway, both justified by measured approach speeds rather than by the posted limit. Get the speed survey wrong and everything downstream in the section fails with it.

For a small scheme, a handful of dwellings or a change of use, this is usually the only part of the Transport Statement a highway engineer reads closely.

What the section has to prove

Four things, in this order. That the access geometry suits the vehicles that will use it. That drivers emerging can see far enough in both directions. That drivers on the main road can see the access in time to react. And that construction and servicing vehicles can get in, turn and leave without reversing onto the highway.

Everything else in the section is supporting material for those four propositions. A statement that lists standards without demonstrating compliance on a drawing will come back with a holding objection, and a holding objection on a minor application usually costs the eight week determination period.

The threshold between a Transport Statement and a full Transport Assessment is set by the scale of trip generation, not by the complexity of the access. A single access serving five houses onto a 40 mph rural road can need more access work than a fifty unit scheme onto an estate road.

Measuring approach speeds rather than assuming them

Manual for Streets is explicit that visibility should be based on observed vehicle speeds, not on the speed limit. On a 30 mph road with a long straight approach the recorded 85th percentile wet weather speed is often 34 to 36 mph, which lengthens the splay you need. On a narrow lane signed at 60 mph it is frequently under 30, which shortens it.

A defensible speed survey has a few features. Automatic counters or radar rather than a person with a speed gun. A location that reflects the approach to the access, set back from junctions, crests and traffic calming. Seven consecutive days including a weekend. Separate figures for each direction. The 85th percentile reported, with the mean alongside it.

Surveys taken in school holidays or during roadworks on a parallel route are worth repeating. So are surveys where the counter sat inside a queue, because a queue records speeds that will not exist once the queue clears.

X and Y distances and where the figures come from

The X distance is measured from the give way line back along the centre line of the access. Manual for Streets normally uses 2.4 metres, which puts the driver's eye far enough forward to see past a boundary wall while keeping the bonnet clear of the carriageway. A reduced 2.0 metres is sometimes accepted on very lightly trafficked, low speed streets, and 4.5 metres appears in some authorities' standards for accesses onto classified roads.

The Y distance is the stopping sight distance for the measured approach speed, set out along the nearside edge of carriageway in each direction. The figures most often applied to minor accesses are these.

Measured 85th percentile speed Stopping sight distance applied
20 mph 25 metres
25 mph 33 metres
30 mph 43 metres
37 mph 59 metres

Check the current edition of Manual for Streets and the local highway authority's own design guide before fixing these, because authorities vary in how they interpolate between values and some still apply Design Manual for Roads and Bridges distances on higher speed roads. Accesses onto the strategic road network are a separate regime entirely and National Highways will be consulted.

Two details decide whether the splay drawing survives scrutiny. Eye height is taken at 1.05 metres above the access surface, and the object height at the far end is 0.6 metres, so a 900 millimetre brick wall inside the splay blocks it and a 400 millimetre kerbside verge does not. And the splay must be shown as a clear area on plan, hatched, with the 0.6 metre maximum height of anything within it noted on the drawing rather than left to a condition.

Gradients, widths and turning inside the site

Most authorities want the first stretch of the access at or close to level, commonly 1 in 20 over the first five metres, so that a stationary vehicle sits flat while the driver looks and so that surface water drains back into the site rather than across the footway. Beyond that, 1 in 10 is a usual maximum for a private drive.

Width depends on what it serves. A single dwelling access at 3.0 to 3.7 metres is normally accepted. A shared drive serving several dwellings needs either a width that lets two cars pass or formal passing places at intervals, and once refuse and fire access are in play the constraint becomes the vehicle, not the car.

Turning within the site matters where the access meets a classified road or where the splay is tight. The test the officer applies is simple: can a car leave the site in forward gear. Show the turning area on plan with the swept path drawn on it, not as an empty rectangle labelled "turning head".

Vehicle tracking and the drawings a highway engineer expects

Swept path analysis, produced from the actual design vehicle rather than a generic car, is what converts a layout from plausible to demonstrated. For housing that usually means three runs: a private car, a refuse freighter of about 11.2 metres, and a fire appliance.

Fire service access is governed by Approved Document B rather than by highway standards, and the two sets of numbers differ. Approved Document B works on a hose laying distance from the appliance parking position to all points inside the dwelling, which on a long private drive is often the binding constraint even where the highway authority is content.

The drawing set that clears a minor access is short.

  1. A site access plan at 1:200 with both splays hatched and dimensioned, including the X and Y values used.
  2. A long section through the access showing gradients over the first ten metres.
  3. Swept path drawings for each design vehicle, overlaid on the proposed layout.
  4. A speed survey appendix with the raw data, the survey location marked on a plan and the dates.
  5. Where construction access differs from the permanent access, a separate drawing, which is also the point at which a Construction Traffic Management Plan starts to be useful.

Splays over land you do not control

A splay that crosses a neighbour's front garden is not a splay. It is an aspiration.

Where part of the visibility area falls outside the application site and outside the publicly maintainable highway, say so plainly, identify the ownership, and serve the correct notice with the ownership certificate. A Grampian style condition can sometimes bridge the gap, but only where there is a reasonable prospect of the works being carried out, and a neighbour who has refused in writing removes that prospect.

Where the splay sits within highway land, confirm the extent from the highway authority's records rather than from the kerb line, because verges and service strips are frequently highway even when they look private. Hedges and walls inside highway land can usually be cut back under the authority's powers, which is a different and easier conversation than one with a neighbour.

Physical works to form the crossing need consent in their own right: section 184 of the Highways Act 1980 for a vehicle crossing over a footway, and section 278 where the access alters the highway itself. Neither is granted by planning permission, and both have their own timescales and bonds.

The objections that come back most often

Speed surveys that use the speed limit instead of observed speeds. Splays drawn to the boundary rather than to the edge of carriageway. Retained boundary walls inside the splay with no note on the height. Turning areas that a refuse vehicle cannot use. Gradients measured from a levels survey that stops at the site boundary. And accesses onto a bus route or within the tapers of a junction, where the authority's starting position is refusal whatever the geometry shows.

Most of these are avoidable in a morning's work before the drawings are issued. The one that is not avoidable by drawing is the splay over third party land, and it is better to find that out at the feasibility stage than in an officer's report.

This is general guidance, not legal advice. Highway standards vary between authorities, so confirm the applicable design guide and splay requirements with the local highway authority before relying on any figure here.

PlanScope can draft the access and visibility narrative from your site data and survey figures, and you can browse all 66 report types to see what else a minor application needs. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What are X and Y distances in a visibility splay?

The X distance is measured from the give way line back along the centre line of the access, normally 2.4 metres under Manual for Streets. The Y distance is the stopping sight distance for the measured approach speed, set out along the nearside edge of carriageway in both directions. Together they define the triangular area that must be kept clear.

Can I use the speed limit instead of a speed survey?

Manual for Streets asks for visibility based on observed vehicle speeds, so most highway authorities expect a survey. Using the limit can cut both ways: a 30 mph road with a long straight approach often runs faster than the limit, while a narrow lane signed at 60 mph usually runs far slower. A survey settles it either way.

How high can a wall or hedge be inside a visibility splay?

The object height used in the assessment is 0.6 metres above the access surface, measured against a driver eye height of 1.05 metres. Anything taller inside the splay obstructs it, which rules out a typical 900 millimetre boundary wall. Mark the maximum height on the drawing rather than leaving it to a planning condition.

Does the highway authority need me to show turning within the site?

Where the access meets a classified road, or where visibility is restricted, the authority will normally want vehicles to leave in forward gear. Show the turning area with a swept path drawn over it using the real design vehicle. An empty rectangle labelled as a turning head is the single most common reason for a holding objection.

What happens if part of the splay is on my neighbour's land?

Identify the ownership, serve the right notice and say so in the statement. A Grampian style condition can sometimes cover works outside the site, but only where there is a reasonable prospect of them happening, and a written refusal from the landowner removes that prospect. Check first whether the land is actually highway verge.

Do I need a separate consent to build the access?

Yes. Planning permission does not authorise works in the highway. A vehicle crossing over a footway needs consent under section 184 of the Highways Act 1980, and alterations to the highway itself are dealt with under a section 278 agreement. Both run on their own timescales and a section 278 usually needs a bond.

Sources and further reading

transport statementvisibility splayhighwaysaccess designmanual for streets

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The sensitivity and magnitude matrix in an LVIA

GLVIA3 supplies a method, not a matrix. How value and susceptibility combine, what magnitude actually contains, and how to report year 1 and year 15 residual effects defensibly.

Read article →
Report Deep Dives7 min read

The ground gas assessment section of a Phase 2 report

Monitoring in settled weather, flow readings at the resolution limit and a characteristic situation with no source behind it are the three failures reviewers see most. What a defensible ground gas section contains.

Read article →
Report Deep Dives7 min read

The background sound survey in a Noise Impact Assessment

The LA90 background sets everything else in a BS 4142 rating. Measurement positions, representative periods, calibration records and the uncertainty a reviewer will look for.

Read article →
Report Deep Dives7 min read

The scope and modules of a Whole Life Carbon Assessment

Upfront, embodied and whole life carbon are three different figures from different module sets. The scope errors that get assessments rejected, and the assumptions that move the result.

Read article →
Report Deep Dives6 min read

The carbon offset and monitoring sections of an Energy Statement

Offsetting deals with what is left after fabric, plant and renewables. The residual calculation, the obligation drafting, the metering strategy and who reports once units are sold.

Read article →
Report Deep Dives6 min read

The sustainable transport section of a Transport Assessment

Trip generation is arithmetic, accessibility is judgement. Isochrones instead of circles, LTN 1/20 route quality, honest bus evidence and measures that can actually be secured.

Read article →