Noise, Air, Odour and Light

Acoustic design statements and what they add

7 min readBy PlanScope Editorial Team

Numbers show whether internal levels are met. A design statement shows whether they were met by designing properly or by sealing the windows, which is what an officer wants to know.

An acoustic design statement explains how the layout, orientation and construction of a scheme deal with noise, rather than reporting what the noise levels are. The numerical assessment answers whether the internal levels meet the guideline values. The design statement answers the question that comes next, which is whether those levels were achieved by designing the scheme properly or by sealing the windows and hoping nobody opens them.

For residential development in a noisy location, the professional planning guidance on noise expects both, and an officer who receives only the numbers will usually ask for the rest.

What a design statement covers beyond measurement

The numerical work establishes the baseline sound environment, predicts levels at the facade, and compares internal levels against the guideline values in the British Standard on sound insulation for buildings: broadly 35 decibels for living rooms in the daytime and 30 decibels for bedrooms at night, expressed as equivalent continuous levels over the relevant period, with attention also given to individual noise events at night.

The design statement covers what the design did about it. It sets out the noise sources and their character, the site constraints, the options considered, the mitigation adopted and the reasoning. Its value to a case officer is that it shows the sequence of decisions rather than the outcome alone.

It also covers the things a level cannot express. Character matters as much as level for some sources, and a rhythmic mechanical hum at 40 decibels can be more intrusive than road traffic at 45. So can predictability, time of day and whether the source is continuous or intermittent.

The mitigation hierarchy applied to layout

Good acoustic design works through a sequence, and the sequence is what the statement should follow.

  1. Reduce the noise at source where you control it, which on a mixed use scheme means plant selection, location and enclosure.
  2. Increase the separation between source and receptor, through site layout and the position of the blocks.
  3. Screen the receptor using the built form, landscape bunds or, as a last resort, barriers.
  4. Orient the building so that habitable rooms face away from the source.
  5. Plan the internal layout so that the least sensitive rooms take the exposed elevation.
  6. Only then rely on the building envelope and on ventilation that allows windows to stay closed.

The order matters because the later measures are the fragile ones. A glazing specification depends on the window being shut, which depends on a ventilation strategy that works, which depends on the occupant using it as intended. A block turned ninety degrees does not depend on anybody.

Barriers sit lower in the hierarchy than their popularity suggests, and their real-world performance is usually well below the figure quoted in the product literature, as what an acoustic barrier actually achieves sets out.

Orientation, massing and screening by built form

Using buildings to screen other buildings is the most durable mitigation available and the cheapest to maintain.

A perimeter block with a quiet courtyard is the standard response to a busy road, and it works because the block itself provides the attenuation to the inner elevations. Deck access on the noisy side, with the access deck acting as a buffer, achieves something similar at lower cost. A commercial or ancillary use at ground floor on the exposed elevation removes the most sensitive receptors from the worst position entirely.

Three things to get right when relying on this. The gaps between blocks are where noise gets into the courtyard, so corner treatment and the position of entrances matter. The reflective facades of a courtyard can raise levels inside it above the free-field prediction, which surprises people. And a single aspect unit facing the noisy elevation gets no benefit from the courtyard at all, which is why the layout and the acoustic strategy have to be developed together.

Internal planning of habitable rooms

Room by room planning is where a design statement earns its place, and it costs nothing at the right stage.

Put bedrooms on the quiet elevation. Put kitchens, bathrooms, circulation and storage on the exposed one. Where a dual aspect unit has one quiet face, put the bedroom there even if the living room view is better from the other side, because the night-time criterion is the harder one to meet.

Balconies on the noisy elevation need thought. An open balcony is an external amenity space and the guidance suggests a desirable upper limit of around 50 to 55 decibels for external amenity areas, which a roadside balcony will not meet. A winter garden with openable screening can meet it, and it also gives the flat a usable outdoor space that a noise-exposed open balcony does not.

Where night-time servicing or deliveries are part of the scheme, the internal planning has to respond to that specific pattern rather than to an average, and the issues are covered in night deliveries and servicing noise at commercial sites.

Balancing acoustics against daylight and ventilation

This is the part most statements avoid, and it is the part officers most want to see.

Heavier glazing usually means lower visible light transmittance. A ventilation strategy that requires windows to stay closed means mechanical ventilation, which means plant, which is itself a noise source and an energy load. Deeper reveals for acoustic reasons cut daylight. Acoustic screening of a courtyard reduces air movement and can worsen overheating.

Say what the trade-offs were and how they were resolved. A statement that reports a glazing specification, the resulting visible light transmittance, the effect on the internal daylight assessment and the overheating consequence is far more convincing than one that reports an acoustic result alone.

The overheating point is the sharpest of them. Part O of the Building Regulations limits reliance on openable windows in noise-exposed locations, so a scheme that closes windows for acoustic reasons has to manage summer temperatures another way, and the overheating risk assessment needs to use the same assumptions as the acoustic work.

Demonstrating good acoustic design

The evidence that persuades is specific and drawn rather than described.

Include a site plan marking the noise sources, the measurement positions and the predicted facade levels by elevation. A typical floor plan with room uses and the exposed elevation identified. A schedule of the mitigation adopted at each step of the hierarchy, with the options rejected and why. The glazing and ventilation specification with the performance values assumed. And a statement of the residual effect after mitigation, stated honestly.

Include the survey details too. The dates, the duration, the weather, the equipment and its calibration, and the reason the survey period is representative. A survey run during a road closure or over a school holiday will be challenged, and rightly.

A noise impact assessment and the design statement can sit in one document provided the two parts are separately identifiable.

How it is used at determination

The environmental health officer reads it first. Their advice to the case officer turns on whether the internal criteria are met and whether the means of meeting them are durable.

Expect conditions. The usual set covers the glazing and ventilation specification to be installed as approved, plant noise limits at defined positions, a scheme for any acoustic screening, and hours of operation for commercial elements. Where a condition requires post-completion verification, agree what will be measured and where before the wording is fixed.

The design statement also does something less obvious. When an objection arrives claiming the scheme ignores noise, a document that shows the sequence of design decisions answers it in a way that a table of decibel values does not. That is worth more at committee than the numbers are.

One caveat worth stating plainly. Good acoustic design does not make an unsuitable site suitable, and a statement that reads as an elaborate justification for putting bedrooms beside a railway will be read that way.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

What internal noise levels are used for new dwellings?

The British Standard on sound insulation and noise reduction for buildings gives guideline values of broadly 35 decibels for living rooms during the day and 30 decibels for bedrooms at night, as equivalent continuous levels over the relevant period. Individual noise events at night are also considered, since they affect sleep independently of the average.

Why does the mitigation hierarchy matter?

Because later measures are more fragile. Source control, separation, screening by built form and orientation all work whatever the occupant does. Glazing and ventilation specifications depend on windows being kept shut and on the ventilation system being used as intended, so relying on them first is weaker evidence.

What noise level applies to balconies and gardens?

The guidance suggests a desirable upper limit of around 50 to 55 decibels for external amenity areas. A balcony on a busy road elevation will not meet it as an open space. A winter garden with openable screening usually can, and it gives the flat outdoor space that is actually usable.

How does acoustic design interact with overheating?

Directly. Part O of the Building Regulations limits reliance on openable windows in noise-exposed locations, so a scheme that closes windows for acoustic reasons has to manage summer temperatures another way. The acoustic work and the overheating assessment should use the same assumptions and, ideally, the same model.

Can the design statement sit inside the noise assessment?

Yes, provided the two parts are separately identifiable. The environmental health officer will read the numerical assessment for compliance and the design section for durability of the mitigation. Merging them into a single narrative makes both harder to check and tends to generate further questions.

Sources and further reading

acousticsnoisedesign statementresidentialmitigation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Noise, Air, Odour and Light

View all →
Noise, Air, Odour and Light7 min read

Delivery and servicing hours conditions on noise grounds

Delivery noise is short, loud events that a BS 4142 rating level dilutes, which is why authorities restrict hours instead. How to assess the events, mitigate them and negotiate the hours.

Read article →
Noise, Air, Odour and Light7 min read

Part O overheating against closed-window noise mitigation

Approved Document O rules out open windows above 40 dB LAeq at night, while acoustic conditions usually cite BS 8233's 30 dB. That 10 dB gap is where most urban infill sits, and it has to be resolved before submission.

Read article →
Noise, Air, Odour and Light7 min read

Lighting design where bats are present

All UK bat species are European protected species, so a lighting layout on a site with bats is an ecological document first. What the plan must show and how the condition should be worded.

Read article →
Noise, Air, Odour and Light7 min read

Vertical illuminance at a window and the curfew

Vertical illuminance at a neighbouring window decides most light trespass objections, and the limit drops after the curfew hour. How the calculation plane is set, which zone applies and what mitigation moves the figure.

Read article →
Noise, Air, Odour and Light7 min read

Separation distances for intensive livestock odour

Separation distance is a screening tool for intensive livestock odour, not a standard. Clearing it decides how much evidence you need, and ammonia screening against designated habitats often decides the application.

Read article →
Noise, Air, Odour and Light7 min read

Odour units and dynamic olfactometry explained

An odour unit is a dilution factor, not a mass. Dynamic olfactometry produces the number, and reviewing what sits behind it separates a defensible odour assessment from an impressive-looking one.

Read article →