Active Travel England as a statutory consultee

7 min readBy PlanScope Editorial Team

Active Travel England must be consulted on the largest applications in England. Its interest is whether people will actually walk, wheel and cycle, and a late objection is expensive to answer.

Active Travel England is a statutory consultee on large planning applications in England, which means the local planning authority must consult it and must take its response into account before determining the application. The agency looks at one thing: whether people will actually walk, wheel and cycle to and around the development. Its comments carry weight because they come from a government body with published standards behind them, and an objection at week six of a major application is expensive to answer.

The thresholds and the assessment method described here are those in force at the time of writing. Check the current Development Management Procedure Order and the agency's own published guidance before relying on them.

When the agency has to be consulted

Active Travel England was created as an executive agency of the Department for Transport and was added to the statutory consultee list for planning applications in 2023. The duty sits on the local planning authority, not on the applicant, and it applies to applications meeting defined size thresholds rather than to any application the council thinks relevant.

Being a statutory consultee has a specific legal meaning. The authority has to consult, has to allow the consultation period, and has to have regard to the response. It does not mean the agency can refuse the application, and it does not give the agency a veto.

What it does give is a written objection on the file, from a national body, which a planning committee will read and which an inspector will weigh at appeal.

The thresholds that trigger consultation

Consultation is required for major development at or above published size thresholds: residential schemes of 150 dwellings or more, developments providing 7,500 m² or more of floorspace, and sites of 5 hectares or more.

Those figures sit well above the ordinary major development thresholds, so most majors never reach the agency. A 60 unit scheme is a major development for the purposes of determination periods and affordable housing policy, and is nowhere near Active Travel England's threshold.

Trigger Threshold
Residential units 150 or more
Floorspace 7,500 m² or more
Site area 5 hectares or more

Outline applications count on the quantum applied for, which matters on phased schemes. A developer splitting a 200 unit site into two applications of 100 units each should expect the authority to consider whether the scheme is being divided artificially, and the agency can comment on any application where the council chooses to consult it voluntarily.

What the agency assesses

The assessment is about the quality of the walking, wheeling and cycling offer, judged from the perspective of someone using it rather than from a drawing.

In practice the questions are: can a person reach the front door on foot from the bus stop, the school and the shops without crossing a car park or a wide junction. Is there a continuous, direct cycle route to the places people are going, or does it stop at the red line. Are the internal streets designed so that walking feels safe and pleasant, or are they car dominated with narrow footways and long blocks. Is cycle parking secure, covered, at ground level and close to the entrance, or is it in a shared cage at the back of a bin store.

Permeability is the recurring theme. A layout with a single vehicular access and no pedestrian or cycle connections through to adjoining streets scores badly, because it forces every trip onto the distributor road regardless of how short the actual distance is.

The agency publishes an assessment tool that scores applications against defined criteria. Getting hold of it and running your own scheme through it before submission is the single most useful preparation available.

The standards it applies

The core document is Local Transport Note 1/20, Cycle Infrastructure Design, which sets out geometry, widths, junction treatments and the five core design principles of coherent, direct, safe, comfortable and attractive networks.

Manual for Streets and Manual for Streets 2 provide the residential street design framework, including the approach to street hierarchy, forward visibility and the design of junctions in places rather than on roads. Inclusive mobility guidance covers footway widths, crossing design, tactile paving and gradients, and matters particularly where the scheme includes a school, a health facility or older persons housing.

Two design points come up repeatedly and are worth designing out early. Shared use footways, where pedestrians and cyclists are mixed on a widened pavement, are discouraged in LTN 1/20 in urban situations where separate provision is achievable. And bolt-on cycle lanes that end abruptly at a junction attract criticism, because the junction is where the risk concentrates.

Where design codes are in play, the same thinking appears in the national framework for them, covered in design codes and the National Model Design Code.

How its comments affect the decision

Responses generally fall into three categories: no objection, no objection subject to conditions or amendments, and objection.

An objection does not automatically produce a refusal. The authority weighs it against everything else, and a scheme delivering housing in an area without a five year supply may still be approved over an active travel objection. But it changes the negotiation. Officers will usually take the agency's list of amendments to the applicant and ask for them, because approving against a statutory consultee's objection requires the report to explain why.

The realistic outcomes are a revised layout, additional off-site works secured by a section 106 obligation or a highways agreement, a stronger travel plan with monitoring and funded measures, or a condition requiring detailed cycle parking design before occupation.

Programme is the real cost. A layout change that alters the street pattern feeds back into drainage, tree planting, plot depths and unit mix, and on a large site that is weeks of work rather than days.

Designing a submission that anticipates it

Deal with active travel in the design, then describe it in the documents. A Transport Assessment that devotes forty pages to junction capacity and two paragraphs to walking will draw comment whatever the layout shows. Councils expect a suitably qualified transport planner to prepare this work, and professional review before submission is strongly advised.

A submission that answers the agency usually includes:

  1. A walking and cycling route audit to the nearest schools, shops, employment, health facilities and public transport stops, with photographs of the actual barriers.
  2. Plans showing pedestrian and cycle desire lines through the site and connections to every adjoining street or path.
  3. A cycle parking schedule by unit type, with the storage type, location and security specified rather than a numerical total.
  4. Crossing and junction details at the point where the site meets the existing network.
  5. A Travel Plan with named measures, funding and monitoring rather than aspirations.

The route audit is the item most often missing and the one that shifts the response most, because it is evidence about the real conditions outside the red line rather than an assertion about accessibility.

Where the role overlaps with the highway authority

The local highway authority remains the body responsible for the adopted highway, for the technical approval of works under sections 278 and 38 of the Highways Act 1980, and for adoption standards. On the strategic road network, National Highways holds that role.

Active Travel England does not adopt anything. Its interest is the quality of the active travel provision, which means the two consultees can and do reach different conclusions: a highway authority focused on visibility splays and refuse vehicle tracking may accept a layout the agency criticises for poor permeability.

When that happens, say so plainly in the response to consultation rather than pretending the positions align. Set out the conflict, explain which design constraint is driving it, and propose the compromise. Officers dealing with two national and local consultees on the same file appreciate an applicant who resolves the conflict for them. Reform news of this kind is tracked on the planning law updates timeline.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which applications go to Active Travel England?

Major development at or above published thresholds: residential schemes of 150 dwellings or more, developments providing 7,500 square metres or more of floorspace, and sites of 5 hectares or more. Those figures sit well above ordinary major development thresholds, so most major applications never reach the agency at all.

Can Active Travel England refuse my application?

No. Being a statutory consultee means the local planning authority must consult it, allow the consultation period and have regard to the response. The decision remains the authority's. An objection does carry weight, because approving against it requires the officer report to explain why.

Which standards does the agency apply?

Local Transport Note 1/20 on cycle infrastructure design is the core document, supported by Manual for Streets and Manual for Streets 2 for residential street design and by inclusive mobility guidance for footways, crossings and gradients. Shared use footways in urban situations and cycle lanes that end at junctions both attract criticism.

What single document improves the response most?

A walking and cycling route audit to the nearest schools, shops, employment, health facilities and public transport stops, with photographs of the real barriers. It is the item most often missing and the one that shifts the response furthest, because it is evidence about conditions outside the red line rather than an assertion.

How does this differ from the highway authority's role?

The local highway authority remains responsible for the adopted highway, for technical approval under sections 278 and 38 of the Highways Act 1980, and for adoption standards. Active Travel England adopts nothing. The two can reach different conclusions on the same layout, and the response to consultation should address that conflict openly.

Sources and further reading

active travelstatutory consulteestransportmajor developmentltn 1/20

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Local validation lists: what authorities may require

A local list item only bites if it was published within two years and is reasonable for your scheme. How to check, and what to do when validation disagrees.

Read article →
Planning Law Updates8 min read

Temporary stop notices and how long they last

A temporary stop notice halts an activity on display, with no right of appeal, and now lasts up to 56 days in England. Here is what it can and cannot prohibit.

Read article →
Planning Law Updates7 min read

Appeal procedures compared: written, hearing and inquiry

You state a preference and the Inspectorate decides. Here is how the three appeal procedures are allocated, what each demands, and how to argue for the one you want.

Read article →
Planning Law Updates8 min read

Prior approval procedure and the deemed grant trap

The 56 day deemed grant under paragraph W runs from receipt, permits only what was submitted, and waives none of the class conditions. How to use it safely.

Read article →
Planning Law Updates7 min read

Permitted development conditions and the effect of a breach

A breached condition in the General Permitted Development Order leaves the whole extension unauthorised, not just the non-compliant part. What follows and how to fix it.

Read article →