Commercial Occupiers

An adult gaming centre: planning and the gambling licence

7 min readBy PlanScope Editorial Team

An adult gaming centre needs planning permission and a premises licence, decided separately by the same council. Here is how each test works and how to sequence them.

Opening an adult gaming centre needs two separate consents from the same council acting in two different capacities, and neither one decides the other. Adult gaming centre planning permission is required because the use sits outside every use class, so moving into a former shop is a material change of use. A premises licence under the Gambling Act 2005 is required because the activity is gambling. You can hold one and be refused the other.

Getting the sequence right saves months. Getting it wrong usually means a fitted-out unit with a licence and no permission, or permission on a lease that has run out while the licence application was contested.

Why gaming premises sit outside every use class

The Use Classes Order 1987, as amended in 2020, puts amusement arcades and centres into the sui generis category, meaning they belong to no class at all. Betting offices are also sui generis, having been taken out of the old Class A2 in 2015.

The practical effect is that no permitted development right carries you into the use. A unit in Class E can change to several other uses without permission, and the Class MA route allows some commercial units to become dwellings, but there is no route from any class into an adult gaming centre. Equally, there is no route out: converting the premises back to a shop later will be a further change of use requiring permission.

Two consequences follow for the application. The lawful existing use has to be established and evidenced, because an officer needs a starting point to assess the change from. And the description of development should be precise: "change of use to adult gaming centre (sui generis)" rather than anything softer, since a vague description invites a validation query and gives an objector something to complain about later.

The two regimes compared

The separation is statutory, not conventional. Section 210 of the Gambling Act 2005 tells the licensing authority to disregard whether the proposed use is likely to be permitted under planning law when it decides a premises licence. The reverse is also true in substance: a planning officer should not refuse permission because they dislike gambling, and should assess land use effects.

Question Planning permission Premises licence
Legal basis Town and Country Planning Act 1990 Gambling Act 2005
Decided by Local planning authority Licensing authority (same council, different committee)
Test applied Development plan and material considerations The three licensing objectives, the Commission's guidance and the authority's statement of principles
Duty to permit None Authority must aim to permit so far as reasonably consistent with the objectives
Attaches to The land The premises and the licence holder
Expires Permission lapses if not implemented Continues subject to annual fee and review

That duty to aim to permit, in section 153, is the reason licensing hearings and planning committees can reach apparently opposite conclusions on the same unit. A licensing sub-committee that finds no evidence of harm to the licensing objectives is obliged to grant. A planning committee weighing town centre vitality policies has no equivalent duty.

Before either application, the operator also needs an operating licence from the Gambling Commission, and the individuals who manage the business need personal licences. Those are national, not local.

Town centre policies aimed at specific uses

Most adopted local plans carry policies on town centre composition, and a good many name betting shops, payday lenders and amusement or gaming premises as uses to be restricted. The policies take recognisable forms: a cap on the proportion of a defined frontage in non-retail use, a minimum distance between premises of the same type, protection for primary shopping frontages, or a requirement that the use does not harm vitality and viability.

Read the policy wording closely, because the drafting varies. A policy expressed as a percentage of ground floor units in a defined frontage can be answered with a survey; a policy expressed as a judgement about character cannot be answered arithmetically and will come down to the officer's assessment.

National policy supports town centre vitality and the sequential approach to main town centre uses, and a gaming centre in a primary frontage is within the category of uses councils are expected to manage. Where floorspace is substantial, the development plan may trigger a Retail Impact Assessment, though for a single unit conversion that is unusual.

Frontage, glazing and window displays

The condition that catches operators out is the one about windows. Councils regularly impose conditions requiring the shopfront to remain glazed and unobscured, with no more than a stated proportion covered by signage, film, vinyl or internal screening.

The reasoning is active frontage policy: a blanked-out window reads as a dead unit and undermines the street. The reasoning from the operator's side is that customers expect privacy and that machine screens suffer from glare. Both are legitimate, and the resolution is usually a designed solution rather than an argument: a glazed zone at eye level with a display or seating area behind it, and the machines set back from the glass.

Submit a shopfront drawing showing exactly what the glazing will look like in use, including any proposed manifestation and signage. A condition drafted against a drawing you have provided is easier to live with than one drafted against an officer's imagination.

Hours, security and evidence on behaviour

Gambling premises may be licensed for long hours, and adult gaming centres often seek extended or 24-hour operation. Planning hours conditions are a separate control and are routinely imposed where residential property is close by.

Prepare the evidence rather than the assertion. That means a staffing plan showing how many staff are on duty at the quietest hours, a closed circuit television specification, an age verification policy, a document recording how staff identify and respond to signs of harm, and a management plan for the external area including litter and smoking. The licensing objective on protecting children and vulnerable people is where most objections land, and it is answered with procedures and training records.

Where plant is proposed, an acoustic case may be needed. A Noise Impact Assessment dealing with air conditioning units and door openings is a proportionate submission where flats sit above or behind the unit. Comfort cooling and extract for a smoking shelter can also raise a ventilation question, which is handled in a Ventilation and Extraction Statement rather than in the noise report.

Concentration arguments and how to meet them

Objectors often argue cumulative effect: that the street already has enough gambling premises. Under the Gambling Act there is no statutory cumulative impact assessment of the kind the alcohol licensing regime uses, so the argument has to be tied to the licensing objectives with evidence, usually police data or local records of crime and disorder.

In planning the argument has more traction, because development plan policies on frontage composition and clustering are designed precisely for it. The answer is a frontage survey: walk the defined frontage, record every ground floor unit and its use, and present the result as a plan and a schedule. If the policy sets a threshold and the survey shows the proposal stays within it, you have answered the policy on its own terms.

The background to the use class position is set out further in the article on adult gaming centres and amusement arcades in planning, and the route taken by other hospitality conversions is covered in the piece on micro-pubs in former shop units.

Sequencing the two applications

Run them in parallel, with planning slightly ahead.

  1. Secure the Gambling Commission operating licence, since neither local consent is much use without it.
  2. Submit the planning application for the change of use, with the shopfront drawing and management plan.
  3. Apply for a provisional statement under the Gambling Act where the premises are not yet constructed or altered, which lets the licensing authority consider the proposal in principle before the fit-out.
  4. Convert the provisional statement into a premises licence once the works are substantially complete.
  5. Discharge any planning conditions on hours, glazing, plant or management before trading starts.

Negotiate the lease around that sequence. A conditional agreement for lease, with the condition tied to the planning permission rather than the licence, protects you against the regime that is harder to predict.

This is general guidance, not legal advice; check the position with your local planning authority and the licensing authority before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which use class is an adult gaming centre?

None. Amusement arcades and centres are sui generis under the Use Classes Order 1987 as amended in 2020, as are betting offices. That means no permitted development right takes you into the use from any class, and changing back to a shop later will also be a material change of use requiring permission.

Do I need planning permission before applying for a premises licence?

No. Section 210 of the Gambling Act 2005 requires the licensing authority to disregard whether the use is likely to be permitted under planning law. The two applications can run in parallel, and a provisional statement is the route where the premises have not yet been constructed or altered.

What is a provisional statement and when is it useful?

It is a Gambling Act procedure allowing the licensing authority to consider premises that are not yet built or fitted out. It lets you test the licensing case before committing to the works, and is then converted into a premises licence once the alterations are substantially complete and the premises are ready for use.

Can the council refuse a premises licence because there are already several gambling premises nearby?

Only on evidence tied to the licensing objectives. The Gambling Act has no statutory cumulative impact assessment of the kind the alcohol regime uses, and the authority must aim to permit so far as reasonably consistent with the objectives. Concentration arguments carry more weight in the planning decision than the licensing one.

Why do councils impose conditions on blanked-out windows?

Active frontage policy. A covered shopfront reads as a dead unit and weakens the street, so conditions often limit the proportion of glazing that may be obscured by signage or film. Submitting your own shopfront drawing showing a glazed zone with the machines set back usually produces a workable condition.

Sources and further reading

adult gaming centresui generischange of usegambling actpremises licencetown centre

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Hours of opening conditions and how to negotiate them

An hours condition is easier to shape before it is imposed than to vary afterwards. Here is the evidence that supports longer hours, how to split customer and delivery restrictions, and what varying an existing condition involves.

Read article →
Commercial Occupiers7 min read

Planning a pharmacy alongside a medical practice

Retail and health services both sit inside Class E, so a pharmacy opening in a shop unit or alongside a surgery usually needs no change of use permission. The consents that do bite are parking, hours, extraction and signage.

Read article →
Commercial Occupiers7 min read

Change of use to a light industrial unit near homes

Light industry sits inside Class E only where the process could be carried out in a residential area without detriment to amenity. That wording, not the machinery, decides whether your unit needs permission.

Read article →
Commercial Occupiers6 min read

Change of use to an amusement arcade or betting shop

Amusement arcades and betting offices sit outside every use class, so a change of use always needs planning permission. The decision usually turns on frontage policy, clustering and noise rather than on the gambling itself.

Read article →
Commercial Occupiers7 min read

Planning a barber, nail bar or beauty salon

Most personal care uses now sit inside Class E, so the use rarely needs permission. Extraction, waste and registration are where the work is.

Read article →
Commercial Occupiers7 min read

Mobile catering on private land and the 28-day rule

Part 4 Class B allows temporary use of land for 28 days a year. It does not apply inside the curtilage of a building, which rules out most car parks.

Read article →