Planning Process

Advertisement consent: procedure and the five year term

6 min readBy PlanScope Editorial Team

Signage applications turn on amenity and public safety, not planning policy. Here is how deemed consent classes work, what an express consent application needs, and what happens after five years.

An advertisement consent application is decided on two things and nothing else: amenity and public safety. The Town and Country Planning (Control of Advertisements) (England) Regulations 2007 confine the council to those tests, so objections about competition, the business being run, or whether the town needs another shop sign are irrelevant. Express consent, once granted, normally runs for five years.

That narrow scope cuts both ways. It means a well designed sign in the right place is hard to refuse on policy grounds. It also means an illuminated box sign on a listed shopfront in a conservation area can be refused on amenity alone, without any reference to a development plan policy at all.

Start from the position that displaying an advertisement is controlled, then look for a deemed consent class that covers it.

Schedule 3 to the 2007 Regulations sets out classes of advertisement that benefit from deemed consent, each with its own size, height, illumination and location limits. The ones that come up most often are name plates and small signs on the premises they relate to, temporary signs such as sale boards and contractors' boards, signs on business premises within specified size limits, signs on forecourts, flags, and hoardings around development sites.

Express consent is needed where the sign falls outside every class, or exceeds a class limit, or where the deemed consent has been withdrawn.

Two traps recur. Illumination frequently takes a sign out of a deemed consent class that would otherwise cover it. And a sign that advertises something other than the business on the premises, such as a brand not sold there or an off-site directional sign, rarely fits the on-premises classes.

Deemed consent is not a free pass. Every class is subject to the standard conditions in the Regulations: the advertisement must be kept clean and tidy and in safe condition, it must not obscure or hinder the interpretation of an official traffic sign or railway signal, it must be removed when the council requires it, and the owner's permission must be obtained before it is displayed.

Location changes the picture. In areas of special control, which councils designate mainly in rural areas, several classes are restricted or excluded, and illuminated signs are heavily limited. Conservation areas and National Landscapes attract tighter limits within some classes as well.

Note also the class covering sites that have been used continuously for the display of advertisements for a long period. It is useful for existing hoardings, and it is regularly claimed without the evidence to support it. If you are relying on it, assemble dated photographs and lease records before the council asks.

Amenity and public safety in practice

Amenity means the effect on the appearance of the building, the street and the wider area, including the cumulative effect of several signs. On a traditional shopfront, officers look at whether the sign sits within the fascia, respects the pilasters and cornice, and uses materials and lettering appropriate to the building. Internally illuminated box fascias on Victorian shopfronts are the most commonly refused type of sign in conservation areas.

Public safety is about road and rail safety, and about pedestrians. Signs that distract drivers at junctions, that resemble traffic signals, that obstruct sight lines, or that are illuminated brightly enough to dazzle will be refused or conditioned.

Where the sign is on or affects a listed building, listed building consent may also be required, and the heritage case has to be made separately. A short Heritage Statement explaining the significance of the shopfront and how the sign responds to it does more than a long design justification.

Making the application

The application goes to the local planning authority, with a fee payable for each advertisement, and the fee is indexed, so use the current published schedule rather than a figure from an old file.

Submit, at minimum:

  1. A site location plan with the building identified.
  2. An elevation drawing at a stated scale showing the sign in position, with dimensions.
  3. A detail drawing showing construction, projection from the wall, fixings and materials.
  4. Illumination details: the type of illumination, whether internal or external, the luminance in candelas per square metre, and the proposed hours of illumination.
  5. Photographs of the building and the street in both directions.

Applications are determined within eight weeks. There is a right of appeal to the Planning Inspectorate against refusal or against conditions.

The five year term and what happens after it

Express consent is normally granted for five years from the date of the decision, unless the council specifies a different period.

At the end of the term, the sign does not become unlawful automatically. A deemed consent class covers advertisements displayed under an express consent that has expired, provided the sign is unchanged and the council has not taken action. In practice that means most consented signs continue in place, but the council retains the ability to require changes.

If you alter the sign, change the illumination, or rebrand, you are displaying a different advertisement and the original consent no longer covers it. That is the moment to reapply rather than to hope. The same logic applies to consents that carry a fixed end date, which the guide to temporary permissions and what happens when they expire sets out for planning permissions generally.

Illumination levels and conditions

Illumination is where most conditions land. Councils commonly control the maximum luminance, the hours of operation, whether the illumination is static or changing, and whether digital displays may animate or carry moving images.

The Institution of Lighting Professionals publishes guidance on obtrusive light that sets out environmental zones and recommended limits, and many authorities apply it directly to signage. A proposal that states its luminance against the relevant zone, and offers a dimming regime after a stated hour, is far easier to approve than one that leaves the officer to guess.

Digital displays attract more scrutiny again, particularly near junctions and signalised crossings, because of the distraction argument. Expect conditions fixing minimum dwell times between images and prohibiting video, flashing and scrolling content. Where the site is sensitive to light spill onto residential windows, a Lighting Assessment is the document that resolves it.

Enforcement against unauthorised signs

Displaying an advertisement without consent is an offence under the Town and Country Planning Act 1990, prosecutable in the magistrates' court, with a continuing daily penalty for as long as the display continues. That is a different and faster route from ordinary planning enforcement.

Councils also have a discontinuance power, which allows them to require the removal or alteration of an advertisement displayed with deemed consent where it causes substantial injury to amenity or a danger to public safety. A discontinuance notice carries a right of appeal.

For fly-posting and signs on land in the vicinity, removal notices and remedial powers are available as well. The practical point for a business is that signage enforcement costs a council little to run and visible to the public, so it tends to be pursued.

Photograph the existing signage, check each sign against the deemed consent classes, and apply for the ones that fall outside. It is a short piece of work and it removes a risk that surfaces at the worst moment, usually during a lease assignment. You can also check which supporting documents a shopfront scheme needs if alterations are proposed alongside the signage.

This is general guidance, not legal advice. Advertisement control is technical and the deemed consent classes carry detailed limits, so check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What can a council consider on an advertisement application?

Only amenity and public safety. The Control of Advertisements Regulations 2007 confine the assessment to those two tests, so objections about competition, the nature of the business or local trading conditions carry no weight. Amenity covers the effect on the building and street scene, including cumulative effects. Public safety covers road, rail and pedestrian safety.

Which signs have deemed consent?

Schedule 3 to the 2007 Regulations sets out classes with deemed consent, including name plates, temporary sale and contractors' boards, signs on business premises within size limits, forecourt signs, flags and hoardings around development sites. Each class carries size, height, illumination and location limits, and illumination often takes a sign outside the class.

How long does advertisement consent last?

Express consent is normally granted for five years from the date of the decision unless the council specifies otherwise. After expiry the sign does not automatically become unlawful, because a deemed consent class covers unchanged signs displayed under an expired express consent. Altering the sign or its illumination means a fresh application is needed.

Do I need consent for an illuminated shop sign in a conservation area?

Usually yes. Illumination frequently takes a sign outside the deemed consent class that would otherwise cover it, and several classes are restricted in conservation areas and areas of special control. Internally illuminated box fascias on traditional shopfronts are among the most commonly refused sign types on amenity grounds.

What happens if I put up a sign without consent?

Displaying an advertisement without consent is an offence under the Town and Country Planning Act 1990, prosecutable in the magistrates' court with a continuing daily penalty. Councils can also serve a discontinuance notice requiring removal or alteration of a sign displayed under deemed consent where it harms amenity or public safety.

Sources and further reading

advertisement consentsignageshopfrontilluminationenforcementcommercial premises

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Transferring a permission and a change of applicant

Section 75 makes a permission a benefit of the land, so a buyer acquires it on completion with no form or fee. The levy paperwork and undischarged conditions are where the risk sits.

Read article →
Planning Process8 min read

Decision notices: conditions, informatives and reasons

The permission is the description, the conditions and the drawings those conditions list. The officer report is not part of it, and a superseded drawing revision in the list is a real problem.

Read article →
Planning Process7 min read

Prior approval: the clock, deemed consent and the risks

Prior approval runs on a hard statutory deadline, and silence from the council can let development begin. The paper trail that silence leaves is rarely good enough for a lender.

Read article →
Planning Process7 min read

Permission time limits and what happens when one lapses

A permission that expires cannot be renewed. Keeping one alive means a material operation within the time limit, with every pre-commencement condition already discharged.

Read article →
Planning Process7 min read

Outline permission: what to fix and what to reserve

Access, appearance, landscaping, layout and scale can each be reserved, but reserving everything is rarely the least costly route. This sets out which to fix at outline and what the decision costs you later.

Read article →
Planning Process7 min read

Extensions of time and the eight week deadline

The eight week period is a deadline for the council, not a promise to you. Agreeing an extension helps the authority's performance figures and sometimes helps your application. Knowing when it does which is the useful part.

Read article →