Viability, Obligations and Commercial

Affordable housing commuted sums: how councils calculate them

7 min readBy PlanScope Editorial Team

Commuted sums for off-site affordable housing are calculated by transfer value or residual appraisal. The method, the base date and the index matter more than the headline figure.

A commuted sum is what a council accepts instead of affordable homes on your site, and the amount is set by a calculation method that varies from authority to authority. Some use a published formula in a supplementary planning document. Some derive the figure from the difference between open market value and what a registered provider would pay. Some run a residual appraisal and take the difference between two scheme values. The methods produce very different answers on the same site, which is why the first question to ask an officer is not how much, but how.

When off-site provision is acceptable at all

National policy expects affordable housing to be delivered on the site that generates the need, unless off-site provision or a financial contribution of broadly equivalent value can be justified with strong evidence, and the agreed approach contributes to mixed and balanced communities.

That framing puts the burden on the applicant. The arguments that succeed are practical ones: a scheme too small for a registered provider to take on and manage, a building type unsuited to affordable tenure such as a single-stair conversion with high service charges, a site where the affordable units could not be given the separate access a provider requires, or a location where the authority's own housing strategy prefers a contribution towards delivery elsewhere.

Arguments that fail are the ones about preference. A developer who simply does not want affordable homes in the scheme is not making a planning case. Nor is a viability argument that concludes no affordable housing is deliverable, since that is a different question from whether the contribution should be on site or off it.

Thresholds matter too. Contributions are generally not sought on schemes of ten dwellings or fewer, or below the equivalent floorspace figure, with a lower threshold applying in some designated rural areas. Check the adopted policy, because local thresholds sometimes sit below the national position.

The transfer value approach

This is the method most commonly published in supplementary guidance, and it is the easiest to interrogate.

The council takes the number of affordable units the policy would have required, then multiplies it by the difference between the open market value of an equivalent unit and the price a registered provider would pay for it as an affordable unit. That difference is the subsidy the developer would have provided in kind, converted into cash.

An illustrative example, using assumed figures that are not evidence of values anywhere: a 20-unit scheme in an authority with a 35 per cent policy generates a requirement for seven affordable homes. Assume a market value of £300,000 per unit and a registered provider transfer value of £150,000. The difference is £150,000 per unit, and the commuted sum is seven times that, or £1,050,000. Change the transfer value assumption by 10 per cent and the sum moves by £105,000.

That sensitivity is the point. Transfer values depend on tenure mix, on grant assumptions, on unit size and on the provider's own appraisal, and a formula that fixes them at a single percentage of market value will be wrong on some sites in both directions.

The residual approach

The alternative method compares two appraisals of the same scheme: one with policy-compliant on-site affordable housing and one entirely for open market sale. The commuted sum is the difference in residual land value between them.

This is more defensible in principle and much harder to agree in practice, because it imports every contested input in development appraisal. Benchmark land value, build cost, finance rate, sales values, developer return and programme all move the answer.

Where an authority proposes a residual calculation, ask for the appraisal file rather than the conclusion. The inputs are where the negotiation is, and a Viability Assessment prepared on the same basis lets you compare like with like. Councils usually expect this work from a suitably qualified author, and independent review is strongly advised.

Indexation and payment triggers

A sum agreed today and paid in three years is not the same sum, and the agreement has to say how the gap is bridged.

Term Typical drafting What to watch
Index A published building cost or house price index Which index, and the base date
Base date Date of the agreement or of committee resolution An early base date increases the payment
Trigger On start, on occupation of a proportion of units, or in phases Cash flow, and whether the trigger is measurable
Late payment Interest at a stated rate above base Whether interest compounds
Spend period Council must apply the sum within a period or repay Ask for it, because not every draft includes it

The spend clause is the one applicants forget to ask for. A contribution that sits unspent in a council account for a decade has not delivered any affordable housing, and a repayment obligation after a defined period is a reasonable term to seek.

Why the figures differ so much between authorities

Four variables account for most of the variation.

The policy percentage differs, and so does the tenure split behind it. The assumed transfer value differs, sometimes expressed as a percentage of open market value and sometimes derived from local registered provider evidence. Market values differ, which is legitimate and expected. And the treatment of grant differs: an authority that assumes grant funding will be available produces a lower subsidy figure than one that assumes none.

Comparing your sum against a neighbouring borough's is therefore not an argument. Comparing it against the authority's own published methodology, applied correctly to your site, usually is.

Challenging a formula with site evidence

A published formula is guidance, and guidance yields to site-specific evidence where the evidence is good enough.

  1. Establish which document the formula comes from and whether it was subject to consultation and examination.
  2. Check that the policy requirement has been calculated on the right unit count and the right floorspace.
  3. Obtain a written valuation opinion on open market values for the actual unit mix, not for a generic average.
  4. Obtain evidence of the transfer value a registered provider would actually offer, ideally in writing from a provider active in the area.
  5. Where the site carries abnormal costs, evidence them with quantified figures rather than describing them.
  6. Present the alternative calculation using the authority's own method, so the officer is comparing one number with another rather than one approach with another.

The last step is the one that works. Officers can accept a different input far more easily than a different methodology, because a different input is a matter of evidence and a different methodology is a matter of policy.

Securing the sum in the agreement

The obligation has to satisfy the tests in regulation 122 of the Community Infrastructure Levy Regulations 2010: necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind.

Set out the case for the contribution in the Affordable Housing Statement, covering the policy requirement, why off-site provision is the appropriate response, the calculation and the payment terms. That document is what the officer copies into the committee report, so writing it well is worth the time.

Then read the deed. Check the definition of the trigger, the index and its base date, whether the obligation binds successors in title, whether a mortgagee exclusion is included, and whether the sum is repayable if it is not spent. Get the Planning Statement and the deed to describe the same scheme, because inconsistencies between the two surface at the worst possible moment.

This is general guidance, not legal advice. Affordable housing policy and commuted sum formulas vary by authority, so check the adopted local plan and any supplementary guidance with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Enter your postcode on PlanScope to see which documents a residential scheme is likely to need.

Frequently asked questions

When will a council accept a commuted sum instead of on-site homes?

Where off-site provision or a payment of broadly equivalent value can be justified with strong evidence and still supports mixed and balanced communities. Practical arguments succeed: a scheme too small for a registered provider to manage, a building type with service charges no provider will accept, or an authority housing strategy that prefers delivery elsewhere.

How is the transfer value method calculated?

The number of affordable units the policy would have required, multiplied by the difference between the open market value of an equivalent unit and the price a registered provider would pay for it as affordable housing. The transfer value assumption drives the answer, and a ten per cent movement in it changes the sum substantially.

Why do commuted sums differ so much between councils?

Four variables account for most of it: the policy percentage and tenure split, the assumed registered provider transfer value, local market values, and whether the method assumes grant funding is available. Comparing your figure with a neighbouring authority proves nothing. Comparing it with the same authority's published method applied correctly does.

Can I challenge the council's formula?

Yes, with site evidence rather than argument. Obtain a valuation opinion on the actual unit mix, written evidence of what a registered provider would pay locally, and quantified abnormal costs. Then present your alternative using the authority's own methodology, because officers accept a different input far more readily than a different method.

What terms should I negotiate in the section 106 deed?

The index and its base date, the payment trigger and whether it is measurable, the late payment interest rate and whether it compounds, whether the obligation binds successors, any mortgagee exclusion, and a spend period requiring repayment if the sum is not applied within a set number of years.

Sources and further reading

affordable housingcommuted sumsection 106viabilityplanning obligations

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial8 min read

Marriage value and site assembly in a viability appraisal

Assembly costs are real, but most of them do not reduce what a scheme can contribute. Where acquisition costs, ransom premiums and created marriage value each belong in the appraisal.

Read article →
Viability, Obligations and Commercial7 min read

Varying a planning obligation after five years

After the five year relevant period, a statutory application under section 106A replaces negotiation, and a refusal can be appealed under section 106B. What the authority can decide and what it cannot.

Read article →
Viability, Obligations and Commercial7 min read

Social infrastructure contributions and how they are justified

Contribution requests are built from a yield factor, a capacity claim and a published cost. The arithmetic is usually right, so the argument belongs on the capacity evidence and the statutory tests.

Read article →
Viability, Obligations and Commercial7 min read

Pooling restrictions and clawback in planning obligations

Regulation 123 and the five obligation pooling cap went in September 2019. What remains is the statutory test in regulation 122, the infrastructure funding statement, and careful drafting against duplication.

Read article →
Viability, Obligations and Commercial8 min read

Indexation of section 106 contributions and which index applies

The index family and the base date decide how far an indexed contribution moves. Name the series exactly, set the base date to the prices the figure is expressed in, and recalculate every demand.

Read article →
Viability, Obligations and Commercial8 min read

Phasing a scheme to manage section 106 triggers

Phasing moves when obligations fall due rather than how much they total. Define phases by land parcel, build in a revised phasing plan mechanism, and tie affordable delivery to occupation within each phase.

Read article →