Agricultural buildings on holdings of 5 hectares or more

7 min readBy PlanScope Editorial Team

Class A of Part 6 allows agricultural buildings without planning permission inside strict limits. Here is what qualifies, what the numbers are and how notification works.

Class A of Part 6 of the General Permitted Development Order lets you put up an agricultural building on a holding of 5 hectares or more without planning permission, provided the building is reasonably necessary for agriculture on that unit and stays inside a set of numerical limits. Below 5 hectares, and down to 0.4 hectares, a much narrower right in Class B applies and new buildings are not part of it.

Two things decide most Part 6 cases: whether the unit qualifies, and whether the building is actually for agriculture. The dimensions are usually the easy part.

The unit has to qualify before the building does

The right applies to agricultural land comprised in an agricultural unit of 5 hectares or more. That is the whole unit, not the field the building sits in, and the unit is the land occupied for agricultural purposes as a single holding.

Two traps follow. First, development is not permitted on a separate parcel of land less than 1 hectare in area, so an isolated outlying field cannot host the building even if the holding as a whole is large enough. Second, land that has been let out, sold off or taken out of agricultural use shrinks the unit, and a holding that was 6 hectares a decade ago may not be now.

Measure the unit as it stands and record the measurement. A plan showing the holding, its ownership or tenancy and its area is the first item in the file.

Reasonably necessary for the purposes of agriculture

The building must be reasonably necessary for agriculture within that unit. Agriculture has a statutory definition in section 336 of the Town and Country Planning Act 1990, covering horticulture, fruit growing, seed growing, dairy farming, livestock breeding and keeping, grazing land, market gardens and nursery grounds, among other things.

What fails the test is instructive. Buildings for storing machinery used for contracting work off the holding. Buildings for a farm shop selling bought-in goods. Buildings for equestrian use, because keeping horses for riding is not agriculture even though grazing them is. Buildings sized for a scale of production the holding does not support.

Councils test this by asking what the holding produces, what equipment it runs and why the existing buildings are inadequate. Answer those three questions in the submission and most enquiries stop there.

Ground area, height and the limits that bite

The ground area covered by the building must not exceed 1,000 square metres. That figure is calculated cumulatively: other buildings erected on the unit within 90 metres in the preceding two years count towards it, which prevents a large shed being built as three smaller ones in sequence.

Height is limited to 12 metres generally, and to 3 metres where any part of the building is within 3 kilometres of the perimeter of an aerodrome. The aerodrome limit catches people out on land near small airfields as well as near commercial airports, so check before designing a grain store.

The right does not permit the erection, extension or alteration of a dwelling, and it does not permit a building or structure that is not designed for agricultural purposes. A steel portal frame with roller shutters is agricultural. The same frame with domestic windows, a first floor and a bathroom is not.

Where an existing building is being extended or altered, the Order treats the works as significant, and so requiring notification, once they pass a threshold defined by reference to an increase in cubic content or in height over the original.

Distance from roads and from protected buildings

Two separation distances do most of the refusing.

No part of the development may be within 25 metres of a metalled part of a trunk road or a classified road. Measure from the metalled surface, not from the boundary or the verge.

Buildings for accommodating livestock, and structures for storing slurry or sewage sludge, must not be within 400 metres of the curtilage of a protected building. A protected building is broadly a permanent building normally occupied by people, excluding buildings on the same agricultural unit. On a holding with cottages sold off along the lane, that 400 metre radius can sterilise most of the farmyard.

Check both distances on a scaled plan before the steelwork is ordered. They are absolute, and there is no discretion to relax them.

The prior notification procedure and the 28 days

Where the development consists of the erection of a building, an extension or alteration above that threshold, or the formation or alteration of a private way, or certain excavations and deposits, the developer must first apply to the local planning authority for a determination as to whether prior approval is required.

For a building, the matters are the siting, design and external appearance. For a private way, the siting and means of construction. The authority cannot refuse because it dislikes the agricultural justification; it can only address those listed matters, and it may decide prior approval is not required at all.

Development must not begin before the expiry of 28 days from the application, unless the authority notifies sooner that prior approval is not required. If prior approval is required, wait for the decision. If the authority does nothing within the 28 days, the development may proceed in accordance with the details submitted.

Diarise the date the application was received and keep the receipt. Our explanation of how the prior approval procedure actually works covers the mechanics across the different classes.

The application itself is short: a written description, a plan of the site, the siting and design details and the fee. Submit a properly dimensioned elevation rather than a manufacturer's brochure, because a vague submission invites a request for further information that restarts the clock in practice if not in law.

What the right does not cover

Permitted development under Part 6 is not a general exemption. Other consents run in parallel.

If the site is in Flood Zone 2 or 3, the flood position still matters for the works themselves and for any later application, and a Flood Risk Assessment may be needed. If the building is within the curtilage of a listed building, listed building consent is a separate requirement and the right may not apply at all. Building regulations approval, environmental permitting for slurry storage, and highways consent for a new access onto a public road are all separate again.

Article 4 directions can withdraw Part 6 rights in sensitive areas, and additional conditions apply on National Park and other designated land. Check the council's published list before designing.

Buildings put up under Part 6 also carry a condition about what happens if the land ceases to be used for agriculture within ten years, which is worth reading if the long-term plan involves a change of use. A conversion later on is a different question with its own rules, and our note on Class Q sets out what that route requires.

Evidencing a genuine agricultural unit

Keep a file from the start. Useful evidence includes the holding number and Rural Payments Agency registration, tenancy agreements or title plans showing the extent of the unit, cropping and livestock records, purchase invoices for feed, fertiliser or seed, accounts showing agricultural turnover, and photographs of the existing buildings showing why they are inadequate.

Where an authority challenges the agricultural purpose after construction, that file is the defence. Where it challenges beforehand, a short Planning Statement setting out the holding, the enterprise and the need for the building usually resolves it without a formal dispute.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A lawful development certificate is the only formal way to confirm that works are lawful.

Enter your postcode on PlanScope to see which supporting documents a farm building or later conversion is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What size does the holding need to be?

Class A applies to agricultural land in an agricultural unit of 5 hectares or more. Between 0.4 and 5 hectares, the narrower Class B applies and does not permit new buildings. Development is also not permitted on a separate parcel of land less than 1 hectare, so an isolated outlying field cannot host the building.

How big can the building be?

The ground area covered must not exceed 1,000 square metres, calculated cumulatively with other buildings erected on the unit within 90 metres in the preceding two years. Height is limited to 12 metres, reduced to 3 metres where any part is within 3 kilometres of the perimeter of an aerodrome.

Does an equestrian building qualify?

Generally not. Grazing horses is agriculture, but keeping or exercising horses for riding, training or livery is not within the statutory definition of agriculture in section 336 of the 1990 Act. A stable block, menage or horse walker therefore falls outside Part 6 and needs planning permission in the normal way.

What is the 400 metre rule?

Buildings for accommodating livestock, and structures for storing slurry or sewage sludge, must not be within 400 metres of the curtilage of a protected building, broadly a permanent building normally occupied by people other than those on the same agricultural unit. Cottages sold off along a lane can sterilise much of a farmyard for these uses.

What happens after 28 days?

If the authority has not notified you within 28 days of a valid application whether prior approval is required, the development may proceed in accordance with the details submitted. Do not begin before the 28 days expire unless the authority confirms sooner that prior approval is not required. Keep the dated submission receipt.

Sources and further reading

part 6agricultural buildingspermitted developmentprior notificationrural planning

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

The three year deadline on a prior approval

A planning permission must be begun within three years. A Part 3 prior approval must be completed within three years of the prior approval date, and the condition sits in the Order where nobody can vary it.

Read article →
Permitted Development7 min read

Class M: betting shops and takeaways to homes

Class M turns a small shop, betting office or hot food takeaway into a dwellinghouse through prior approval. The 150 m2 floorspace cap and the 20 March 2013 qualifying use date decide most cases before design begins.

Read article →
Permitted Development8 min read

Class L and moving between C3 and C4 use

Class L permits a dwellinghouse to become a small house in multiple occupation and back again, with no application. The limits are the household test, the six-resident ceiling and the Article 4 directions that withdraw the right.

Read article →
Permitted Development8 min read

Industrial and warehouse extensions under Part 7

Part 7 Class H lets an occupier extend an industrial building or warehouse without an application, within limits that are tighter than they look. This covers the allowance, the boundary condition and the new process restriction.

Read article →
Permitted Development7 min read

Bat roosts and roof works under permitted development

A re-roof or loft conversion needs no planning application, so nothing prompts an ecology check. This sets out when to commission a roost assessment, the survey seasons that control the programme, and who is liable.

Read article →
Permitted Development7 min read

Protected trees and permitted development on the same site

Permitted development grants planning permission for the building work, not consent to touch a protected tree. This covers the consent routes, the root protection trap in foundation design, and how to sequence the two.

Read article →