Glossary

Agricultural units and the five hectare permitted line

7 min readBy PlanScope Editorial Team

Part 6 gives farmers permitted development rights, but only on an agricultural unit of the right size, and only for what is reasonably necessary for agriculture.

Agricultural unit permitted development turns on two numbers. Part 6 of Schedule 2 to the GPDO 2015 grants the fuller set of rights, under Class A, on agricultural units of 5 hectares or more. Units of at least 0.4 hectares but less than 5 hectares get a narrower set under Class B, which allows extensions and alterations to existing buildings rather than new ones. Below 0.4 hectares there are no Part 6 rights at all.

Both classes are qualified by the same phrase, and it does more work than the acreage. The development must be reasonably necessary for the purposes of agriculture within that unit.

How the GPDO defines an agricultural unit

The Order defines an agricultural unit as agricultural land occupied as a unit for the purposes of agriculture, and it brings in any dwellinghouse or other building on that land which is occupied for the purposes of farming it.

Three points follow that people get wrong.

The unit is defined by occupation, not by ownership. Land you farm under a tenancy or a grazing licence can form part of the unit, and land you own but have let out to somebody else generally does not. Where the acreage matters, the evidence is the occupation arrangement rather than the title.

The unit has to be occupied as a unit. Two parcels ten miles apart, farmed by the same person as one business, can be one unit, but the further apart and the more separately managed they are, the harder that becomes to sustain.

And agriculture has a statutory definition in section 336(1) of the Town and Country Planning Act 1990, covering horticulture, fruit growing, seed growing, dairy farming, livestock breeding and keeping, the use of land as grazing land, meadow land, osier land, market gardens and nursery grounds, and the use of land for woodlands where ancillary to farming.

That definition is where hobby operations fall out. Grazing land is agriculture. Keeping horses for riding, liveries and equestrian businesses generally is not, because the animals are not being kept for an agricultural purpose. A paddock with two ponies and a field shelter is usually outside Part 6 entirely.

What changes at five hectares

Class A, on units of 5 hectares or more, permits the carrying out of building or engineering operations reasonably necessary for agriculture, subject to limits. The main ones are a ground area not exceeding 1,000 m2 for the works, a height limit of 12 metres, reduced to 3 metres within 3 kilometres of the perimeter of an aerodrome, and a restriction on any part of the development being within 25 metres of a metalled part of a trunk or classified road.

Class A excludes dwellings, and it excludes buildings for accommodating livestock or storing slurry or sewage sludge within 400 metres of the curtilage of a protected building, which broadly means a building in permanent residential or institutional use other than one on the unit itself.

Class B, on units of at least 0.4 hectares and less than 5 hectares, is much narrower. It permits the extension or alteration of an existing agricultural building and certain works, within its own cumulative ground area limit, but it does not permit a new building. That distinction is the single most common misunderstanding on smallholdings.

Both classes are cumulative and both count earlier development. A unit that has already used its allowance on a previous building has no allowance left, and the council will check the planning history before it checks the drawings.

What reasonably necessary means

The test is whether the building or operation is reasonably necessary for the purposes of agriculture within the unit as it exists. It is not whether the building would be useful, nor whether the farmer wants it.

Councils look at the scale and nature of the enterprise: the stock numbers, the cropping, the storage requirement in tonnes or bales, the machinery to be housed, and whether existing buildings on the unit could accommodate the need. A 1,000 m2 shed on a 6 hectare unit running twenty sheep will not pass, and the council can say so.

Evidence that helps includes a stocking or cropping schedule, a calculation of the storage volume needed, a schedule of existing buildings with their current use and spare capacity, and a short statement of the enterprise and its trajectory. Put it in writing with the notification rather than waiting to be asked.

Two further points. The building must be used for agriculture, and using a Part 6 building for storage of non-agricultural goods, a contracting business or general commercial storage is a breach of the condition attached to the class. And the rights fall away where the land was brought into agricultural use only recently, since the Order requires the unit to have been in agricultural use for a period before certain rights apply. This is exactly the kind of detail that separates Part 6 from the general run of permitted development rights.

Prior notification and the 28 day route

Part 6 development is not a free-for-all. For most buildings, and for private ways, the farmer must first apply to the council for a determination as to whether its prior approval will be required.

The matters differ by development type. For a building, the council may require approval of the siting, design and external appearance. For a private way, the siting and means of construction. For an excavation or a deposit of waste, the siting.

The sequence runs like this.

  1. Submit the prior notification with a description of the development, a plan of the site, and the fee.
  2. The council has 28 days to notify you either that prior approval is not required, or that it is.
  3. Where prior approval is not required, or the council fails to respond within the period, you may proceed in accordance with the details submitted.
  4. Where prior approval is required, you submit the details and the council determines them.

Miss a step and the development is unlawful even if it would otherwise have been permitted. Starting before the 28 days have run, or building something materially different from what was notified, are the two ways this goes wrong.

The council can also require the building to be removed and the land restored where the unit ceases to be used for agriculture within a defined period after the building is completed. That condition survives a change of ownership.

Design, siting and external appearance

Where prior approval is required, the council's control is narrow but real. It cannot refuse the principle of an agricultural building on a qualifying unit. It can direct where the building sits and what it looks like.

Officers concentrate on a short list: whether the building can be grouped with the existing farmstead rather than placed in an open field, whether the ridge height and roof pitch match the existing buildings, whether the cladding colour is a recessive dark green, grey or brown rather than a bright profile sheet, whether the access track is visible from a public road or a footpath, and whether landscape planting can soften the edge.

Answering those points in the notification usually produces a determination that prior approval is not required, which saves several weeks. A one-page siting and design note with a photograph of the existing farmstead, a colour reference and a landscape proposal is enough.

Where the site is in a National Park, a National Landscape or a conservation area, expect a fuller assessment and check whether the rights are restricted at all on that land.

Where hobby farming falls outside Part 6

The most common disappointment is the smallholding under 0.4 hectares, or the paddock used for horses, where the owner assumes farm rights apply.

If the unit is below 0.4 hectares, there are no Part 6 rights and a full planning application is needed for any building. If the use is equestrian rather than agricultural, the same is true regardless of acreage. If the land was recently taken out of a larger holding, the unit may not qualify.

In those cases the route is a planning application, assessed against countryside policy in the adopted local plan. Field shelters, stables, hay barns and menages are all decided on landscape impact, access, drainage and the effect on neighbours, and a short Planning Statement setting out the need, the alternatives considered and the design response does more than the drawings alone.

It is also worth confirming whether what you propose is development at all. Some structures are not, and the question of what counts as development under section 55 is often the least expensive one to answer first.

Browse the report types a rural application is likely to need on PlanScope before you notify the council.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What counts as an agricultural unit?

Agricultural land occupied as a unit for the purposes of agriculture, together with any dwellinghouse or building on that land occupied for farming it. The test is occupation rather than ownership, so tenanted land you farm counts and owned land you have let out to someone else generally does not.

What can I build on a farm without planning permission?

On a unit of 5 hectares or more, Class A of Part 6 permits buildings and engineering operations reasonably necessary for agriculture, subject to limits on ground area, height and proximity to roads and protected buildings. Most of it requires a prior notification to the council first, with a 28 day period.

Why is 0.4 hectares important?

It is the lower boundary of Class B, which applies to units of at least 0.4 hectares and less than 5 hectares. Class B permits extensions and alterations to existing agricultural buildings rather than new ones. Below 0.4 hectares there are no Part 6 rights at all and a planning application is needed.

Do horses count as agriculture?

Grazing land is agriculture under the statutory definition, but keeping horses for riding, competition or livery is not, because the animals are not kept for an agricultural purpose. Equestrian uses therefore fall outside Part 6, and stables, field shelters and arenas normally need planning permission whatever the acreage.

What happens if I build before the 28 days are up?

The development is unlawful, even if the council would have confirmed that prior approval was not required. The same applies if you build something materially different from what was notified. In both cases the council can take enforcement action, so wait for the determination or for the period to expire.

Sources and further reading

part 6agriculturalpermitted developmentprior notificationruralgpdo

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

Prior approval: the application that is not quite one

The permission already exists. A prior approval application only determines the matters the class lists, which is both the attraction of the route and its main trap.

Read article →
Glossary6 min read

Planning obligation: when a contribution may be required

Regulation 122 sets three statutory tests for any planning obligation. The most useful question in a contributions negotiation is which limb a given ask satisfies.

Read article →
Glossary7 min read

Section 73 application: varying a condition in practice

Section 73 lets you vary conditions on a permission you already hold, but it cannot touch the description of development and it will not buy you more time.

Read article →
Glossary7 min read

Certificate of lawfulness for a proposed use or operation

Section 192 asks whether a proposed use or operation would be lawful, not whether it would be acceptable. The authority has no discretion to refuse on the merits, and the onus of proof is on the applicant.

Read article →
Glossary7 min read

Stop notice and the compensation risk it carries

Section 183 allows a stop notice only where an enforcement notice has been issued. Section 186 then pays compensation if that notice is quashed on any ground other than the planning merits.

Read article →
Glossary7 min read

Enforcement notice: what it must specify to be effective

Section 173 of the Town and Country Planning Act 1990 fixes what an enforcement notice must say. Where the drafting fails, the notice may be a nullity rather than merely invalid, and that changes what you do next.

Read article →