Permitted Development

Amending what a prior approval granted

7 min readBy PlanScope Editorial Team

A prior approval is a determination on prescribed matters, not a permission the council granted, so the usual amendment routes do not reach it. The workable answer is a fresh application, if the revision still fits the class.

Changing a scheme that was approved through the prior approval procedure is harder than changing one that holds a planning permission, and the reason is structural. Your permission did not come from the council. It came from the General Permitted Development Order 2015, and what the council issued was a determination on a short list of prescribed matters. The tools that let you tweak a planning permission, sections 96A and 73 of the Town and Country Planning Act 1990, are aimed at permissions granted by the authority, so their application to a prior approval is doubtful and practice varies between councils.

In most cases the clean answer is a fresh prior approval application for the revised scheme, provided the revision still sits inside the class. Work out that second point first, because everything else follows from it.

Why prior approvals resist amendment

Under section 59 of the 1990 Act, a development order can itself grant planning permission. The GPDO does that for the classes in Schedule 2, subject to limitations and conditions. Where a class requires prior approval, the condition on the grant is that you apply to the authority and it determines whether its approval is required for specified matters, such as transport and highways impacts, contamination risk, flooding risk, noise or the design and external appearance.

So the decision notice you hold is a determination about those matters. It is not the source of the permission. That distinction sounds academic until you ask a council to make a non-material amendment to it and are told, correctly in most officers' view, that there is no permission of theirs to amend.

Two consequences follow. The first is that the scope of what the council ever considered is narrow, so a change to something outside that scope may not need their agreement at all. The second is that a change to something the class itself controls, such as a floorspace limit or an external alteration the class does not permit, is fatal to reliance on the right, whatever the council says.

Whether the revised scheme is still inside the class

This is the analysis that decides your route, and it has to be done against the wording of the class rather than against the decision notice.

Read the class in three passes. First the limitations, which are the tests the development must satisfy to be permitted at all. Then the conditions, which are the obligations attached to the right, including the requirement to apply for prior approval. Then article 3 and the general restrictions in article 2(3), Article 4 directions and any condition on an earlier permission that removed the right for that land.

Where the revision keeps the scheme within every limitation, you are looking at a fresh prior approval. Where it breaches one, the right disappears entirely and a full planning application is the only route. There is no middle ground, and there is no discretion in the authority to overlook a breach of a limitation. Our walkthrough of how the prior approval procedure actually works sets out the determination steps in order.

Submitting a fresh prior approval

A second application costs another fee and another determination period, but it produces a document that means something.

  1. Prepare the application against the current wording of the class, not the wording that applied when you first applied. Classes are amended often, and the version in force on the date of your new application is the one that governs it.
  2. Check for anything that has changed on the ground since the first approval: a new Article 4 direction, a new conservation area boundary, a new listing, a change in flood zone mapping, a nearby permission that alters the highway position.
  3. Submit the plans and information the class requires. Keep to that list. Extra material invites the authority to consider matters it has no power to refuse on, and to condition them.
  4. Diarise the determination period, which is 56 days for most Part 3 classes and shorter for some Part 1 rights. Where the class provides for deemed approval on expiry, the date the period ends is a legal fact worth recording carefully.
  5. Keep the earlier approval alive if you can. Where the earlier scheme was implemented or could still be implemented within its time limit, you retain the fallback while the new application runs.

That last point is the one people forget. Two approvals can sit side by side, and the earlier one is often the better negotiating position.

Where non-material amendment does and does not help

Section 96A allows an authority in England to make a non-material change to a planning permission relating to land in its area. The prevailing view among local planning authorities is that it does not reach a prior approval, because the permission came from the Order rather than from them. Some councils will nonetheless accept an application, or process an informal minor amendment request, and issue something in writing.

Treat any such document with care. It may be useful evidence that the council does not object, and that has practical value if enforcement is ever raised. It is not the same as a determination that your revised scheme benefits from the right, and a purchaser's solicitor will spot the difference.

Section 73 has the same problem, with an added one. A section 73 application varies a condition on a permission, and the conditions that matter to a permitted development scheme are usually conditions in the Order itself, which no local authority can vary. Where the council imposed its own conditions when granting prior approval, as Part 3 allows it to do, the position is less clear and it is worth asking the authority directly what route it will accept.

Ask in writing, and keep the reply. Officers move on, and so do policy positions.

Changes that take a scheme outside the class altogether

Some revisions look modest and are not. The recurring ones:

  • exceeding a floorspace cap in the class, whether by adding units, enlarging the building or including floorspace that was previously discounted
  • external alterations where the class permits a change of use only, which includes new windows, altered fenestration, new doors, plant, flues and external staircases
  • increasing the number of dwellings beyond a limit in the class
  • works beyond those reasonably necessary for the conversion, which is the test that most often defeats an agricultural conversion, as our note on the structural works test in a Class Q barn conversion explains
  • height or projection changes that breach a dimensional limit, the frequent problem with upward extensions under Class AA
  • a change in the building's use or vacancy history that breaks a qualifying condition

Where a revision does any of this, the choice is between reverting to something that fits the class or applying for planning permission for the whole scheme. A full permission is slower and carries policy risk, but it then gives you access to sections 73 and 96A for future changes, which is worth something on a scheme that will evolve.

Evidence of the approved position

Build a pack and keep it with the title deeds. It should hold the application form and reference, every drawing and document submitted, the decision notice or the evidence that the determination period expired without a decision, the date the development began and photographic evidence of it, and any correspondence with the council about the scope of the approval.

Prior approval rights are usually subject to a time limit for commencement, commonly three years from the date of approval, and an unimplemented approval simply expires. Record the commencement date and what was done to achieve it, because a purchaser or a lender will ask.

Where you are also assembling planning policy material for a parallel full application, a planning statement is the document that ties the fallback position to the policy case.

Drafting the first application to keep room to move

Prevention beats cure here. When you make the original prior approval application, describe the development in the terms the class uses and no more tightly. Submit the drawings the class and the council's local list require, and resist volunteering internal layouts, specifications or details that the authority has no power to assess, because anything submitted can end up listed on the decision notice as an approved plan.

Where the authority proposes a condition, ask what power it is imposed under and whether it is necessary to the matters the class allows it to consider. Conditions on prior approvals are more constrained than conditions on a planning permission, and an unnecessary one narrows your room later.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a Lawful Development Certificate is the only formal way to confirm that works are lawful. To see what a site and its constraints are likely to require before you apply, enter your postcode on PlanScope.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I use section 96A to amend a prior approval?

Most local planning authorities take the view that you cannot, because section 96A applies to a planning permission granted by the authority and a permitted development right is granted by the General Permitted Development Order 2015 instead. Some councils will process an informal minor amendment request, but the document you get carries less weight than a determination.

What is the quickest reliable way to change an approved scheme?

Submit a fresh prior approval application for the revised scheme, provided it still satisfies every limitation in the class. Check the current wording of the class rather than the version in force when you first applied, and check for new Article 4 directions or designations affecting the site since then.

Does my original approval lapse when I apply again?

No. Two approvals can exist side by side, and the earlier one remains available until its own time limit for commencement expires, usually three years. Keeping the earlier approval alive gives you a fallback position, which is often the strongest argument you have if the second application runs into difficulty.

Which changes take a scheme outside the class?

Exceeding a floorspace cap, adding units beyond a numerical limit, external alterations where the class permits only a change of use, works going beyond those reasonably necessary for a conversion, and breaches of dimensional limits. Any of these removes the right entirely, and the authority has no discretion to overlook them.

Are conditions on a prior approval variable under section 73?

Conditions contained in the Order itself cannot be varied by any local authority. Where the council imposed its own conditions when granting prior approval, the position is less settled, so ask the authority in writing which route it will accept and keep the reply. Officers and policy positions both change over time.

Sources and further reading

prior approvalpermitted developmentgpdoamendmentslandlords

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

The three year deadline on a prior approval

A planning permission must be begun within three years. A Part 3 prior approval must be completed within three years of the prior approval date, and the condition sits in the Order where nobody can vary it.

Read article →
Permitted Development7 min read

Class M: betting shops and takeaways to homes

Class M turns a small shop, betting office or hot food takeaway into a dwellinghouse through prior approval. The 150 m2 floorspace cap and the 20 March 2013 qualifying use date decide most cases before design begins.

Read article →
Permitted Development8 min read

Class L and moving between C3 and C4 use

Class L permits a dwellinghouse to become a small house in multiple occupation and back again, with no application. The limits are the household test, the six-resident ceiling and the Article 4 directions that withdraw the right.

Read article →
Permitted Development8 min read

Industrial and warehouse extensions under Part 7

Part 7 Class H lets an occupier extend an industrial building or warehouse without an application, within limits that are tighter than they look. This covers the allowance, the boundary condition and the new process restriction.

Read article →
Permitted Development7 min read

Bat roosts and roof works under permitted development

A re-roof or loft conversion needs no planning application, so nothing prompts an ecology check. This sets out when to commission a roost assessment, the survey seasons that control the programme, and who is liable.

Read article →
Permitted Development7 min read

Protected trees and permitted development on the same site

Permitted development grants planning permission for the building work, not consent to touch a protected tree. This covers the consent routes, the root protection trap in foundation design, and how to sequence the two.

Read article →