An off-road motorsport track on private land

7 min readBy PlanScope Editorial Team

Motor sport gets 14 of the 28 permitted temporary use days, and none of them cover track construction. What a full application needs and how the conditions are drafted.

Motocross track planning permission is needed for anything beyond 14 days of use in a calendar year, and the application will be decided on noise character rather than noise average. Schedule 2 Part 4 Class B of the GPDO 2015 allows temporary use of land for up to 28 days a year, but only 14 of those days may be used for motor car and motorcycle racing, including trials of speed and practising for them.

Fourteen days is the whole of the free allowance. Track construction, permanent bunding, buildings and hardstanding are separate development in their own right and are not covered by it at all.

The limited temporary use rights for motor sport

The temporary use right applies to land, not to buildings or to land within the curtilage of a building. It does not authorise any building operations, so a graded and shaped circuit with formed jumps is very likely to need permission even if the days of use stay inside the allowance.

The right is also withdrawn on a site of special scientific interest for motor sport and certain other activities, which rules out a great many upland and heath sites without further argument.

Counting matters. A day on which the land is used for practising counts as fully as a race day, and a day is a day whether the use lasts an hour or eight. Where the holding contains several fields in separate planning units, the allowance runs per planning unit rather than per owner, and councils look closely at whether an owner is trying to multiply the allowance by drawing new boundaries.

Beyond 14 days, a full application follows. Many operators apply for a temporary permission first, typically for a few years, so the council can see how the conditions work in practice before anything permanent is granted.

Where the track area is large, screening under the environmental impact assessment regime comes into play. Schedule 2 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 catches permanent racing and test tracks for motorised vehicles where the area of the development exceeds one hectare, so a screening opinion is worth requesting before submission. The threshold logic is the same one set out in our note on poultry unit planning permission and EIA screening.

Noise assessment and the character of intermittent events

There is no single British Standard for motor sport noise, and this is where most applications come apart. The methods built for industrial and commercial sound assume a broadly steady source. A two-stroke engine accelerating out of a corner is neither steady nor predictable, and the sound that annoys people is the rise and fall rather than the average level.

A defensible assessment therefore does several things at once. It measures source levels for the actual machine classes proposed, at the silencer standard that will be conditioned. It models propagation to each noise-sensitive receptor with the real topography and screening. It reports both an energy-averaged level over the event period and maximum pass-by levels. And it says how often events would occur, because frequency and duration carry as much weight as level.

National policy on noise works through the concepts of observed adverse effect, and the Noise Policy Statement for England sits behind the planning guidance. Expect the environmental health officer to focus on whether the noise would be intrusive at the nearest dwellings on a quiet Sunday rather than on whether a numerical limit is met.

Practical mitigation that councils accept: earth bunding on the exposed sides, relocating the start line and the highest-revving sections away from receptors, a silencer standard written into the conditions with a pre-event check, limits on the number of machines on track at once, and a hard finish time. Set all of it out in the Noise Impact Assessment rather than offering it at committee.

Dust, surfacing and water suppression

An unsurfaced track in a dry August produces visible dust that travels, and dust complaints are harder to defend than noise complaints because the evidence is photographic.

The controls are straightforward and should be volunteered. A water bowser on site with a stated application rate before and during events. Surfacing or binding the most-used sections. Speed limits on access tracks. A trigger for ceasing use in dry, windy conditions with the wind blowing towards receptors. Records kept of suppression carried out.

Set that out as an operational dust management document accompanying the application. Note that a dust management plan is not one of PlanScope's report types, so it needs drafting separately, though the construction and operational controls sit comfortably inside a construction management plan.

Access, spectator parking and highway safety

Rural lanes are the practical constraint on event size. The highway authority will want visibility splays at the access measured to the recorded traffic speeds, an access geometry that takes a transporter and a trailer without overrunning, and parking wholly within the site.

Spectator events change the analysis completely. Arrival and departure peaks over a short window, on a single-track lane with passing places, is the pattern that draws objections and refusals. Marshalling arrangements, a one-way circulation route where two accesses exist, and staggered start times all help, and all can be conditioned.

Where the proposal is practising only, with no spectators and a handful of vehicles, a short transport statement is usually proportionate. Anything ticketed needs an event traffic management plan.

Ecology and ground disturbance

Track construction strips vegetation and compacts soil, and repeated use keeps it bare. Reptiles, ground-nesting birds and badgers are the receptors that come up most often on the rough grassland and heath edges these tracks tend to occupy.

Commission a preliminary ecological appraisal early, because the follow-up surveys are seasonal. Reptile presence or absence work runs in spring and early autumn, and breeding bird survey work runs from March to August, so an appraisal in November gives you a full season to work with.

Where protected species are present, survey and any mitigation licence require a licensed ecologist under the Conservation of Habitats and Species Regulations 2017 and the Wildlife and Countryside Act 1981. An AI-assisted draft can structure the assessment and the policy framing, but the ecologist's own judgement and licence cannot be delegated to it.

Hydrology deserves a mention too. Bare compacted ground sheds water quickly, and a track on a slope above a watercourse needs interception and silt control.

Restoration and after-use of the land

Temporary permissions carry restoration conditions, and the council will want to know that the land can go back to agriculture. That means a soil handling method, stockpiling separate topsoil and subsoil, and a restoration scheme with a timescale.

Where the land is best and most versatile agricultural quality, expect the loss of it to be weighed against the proposal, and expect the restoration scheme to be scrutinised rather than accepted. A bond or a financial guarantee is sometimes sought through a section 106 obligation.

Conditions on event numbers, hours and machine types

A well-drafted permission for this kind of use is detailed, and reading the conditions carefully before accepting them is time well spent. Typical content:

  1. Maximum number of event days per calendar year, with a log to be kept and made available on request.
  2. Permitted hours, usually excluding early mornings, evenings and in some cases Sundays.
  3. Machine classes and a maximum silencer noise level, with pre-event testing.
  4. Maximum number of machines on the track at any one time.
  5. Dust suppression before and during use, with records.
  6. No public address system, or a limit on its use.
  7. No floodlighting.
  8. Restoration of the land within a stated period if use ceases.

Ask for the event log condition to be worded around days of use rather than events, because two sessions on one day should count once. That single drafting point avoids most later enforcement disputes.

For other temporary and occasional uses of private land, the same 28-day framework is explained in our note on mobile catering units on private land. To see which reports a site is likely to need before you commission anything, enter its postcode on PlanScope.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

How many days a year can I use land for motor sport without permission?

Fourteen. Schedule 2 Part 4 Class B of the GPDO 2015 allows temporary use of land for up to 28 days a year, but no more than 14 of those may be for motor car and motorcycle racing, trials of speed or practising. A practice day counts the same as a race day, and part of a day counts as a day.

Does the 14-day allowance cover building the track?

No. The right applies to the use of land and authorises no building operations, so grading, formed jumps, bunding, hardstanding, buildings and permanent fencing are separate development needing permission in their own right. A shaped circuit will usually require an application even where the days of use stay inside the allowance.

Which noise standard applies to a motocross track?

There is no single British Standard for it. The industrial and commercial methods assume a steady source, which a racing engine is not. A defensible assessment measures source levels for the machine classes proposed, models propagation to each receptor, reports both averaged and maximum pass-by levels, and states event frequency and duration.

Will the council need an environmental impact assessment?

It will need to screen the proposal. Schedule 2 of the EIA Regulations 2017 catches permanent racing and test tracks for motorised vehicles where the area of the development exceeds one hectare. Request a screening opinion before submitting, because a validation query on this point stops the determination clock for several weeks.

What ecology work is needed for a track on rough grassland?

A preliminary ecological appraisal first, then whichever seasonal surveys it recommends. Reptile presence or absence work runs in spring and early autumn, and breeding bird survey work from March to August. Where protected species are present, survey and any mitigation licence require a licensed ecologist under the Habitats Regulations 2017.

How should the event day condition be worded?

Around days of use rather than events, so that two sessions on the same day count once. Ask for an event log to be kept and made available on request. Getting this drafting right at decision stage avoids most later enforcement arguments about whether a weekend of practising counted as one day or two.

Sources and further reading

motor sportpermitted developmentrural planningnoisetemporary use

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides7 min read

Permission for additional storeys under Part 20

Part 20 adds homes on top of existing buildings, but the prior approval matters reach as far as external appearance and natural light. The limits, the information required and when a full application is better.

Read article →
Project Type Guides8 min read

A cricket or sports pavilion on a village green

Planning permission is the easier of the two consents. Section 38 of the Commons Act 2006 prohibits works on a registered green, and starting without it is an offence.

Read article →
Project Type Guides7 min read

A new vehicular access across a public right of way

A right of way across your plot survives the grant of planning permission. Either design a lawful crossing or obtain an order, and programme the groundworks around confirmation.

Read article →
Project Type Guides7 min read

Dog grooming from home: when planning permission applies

A grooming table in a utility room rarely needs permission. A converted garage with three dryers and fifteen bookings a day usually does. The line is the material change of use test.

Read article →
Project Type Guides7 min read

A rural estate biomass boiler house and fuel store

The plant is rarely the problem. The chimney height set by dispersion, and the heat main trench through parkland trees and buried archaeology, are what these applications turn on.

Read article →
Project Type Guides7 min read

Opening a fish and chip shop in a parade of shops

A takeaway is sui generis, so permission is always needed. The decision then turns on the flue termination, the odour control train, fan noise at night and the hours offered.

Read article →