Trees and Arboriculture

Applying for tree consent when you do not own the tree

7 min readBy PlanScope Editorial Team

A TPO consent or an expired section 211 notice lifts the statutory prohibition. It confers no civil right over your neighbour's tree, which is where most of these cases come unstuck.

You can apply for consent to work on a tree you do not own. The council will deal with the application on its arboricultural merits and, if it grants consent, that consent removes the statutory prohibition and nothing else. It gives you no right to go onto your neighbour's land, and no right to cut their tree. Tree consent neighbour owned tree cases fail at that second step far more often than at the first.

So the practical sequence runs the other way round from the one most people assume. Sort out the civil position first, then apply.

Whether ownership is needed to apply

For a tree protected by a Tree Preservation Order, an application for consent is made under the Town and Country Planning (Tree Preservation) (England) Regulations 2012. The form asks who you are, what interest you have in the land and who owns the tree. It does not require you to be the owner.

For a tree in a conservation area that is not covered by a TPO, the route is a notice under section 211 of the Town and Country Planning Act 1990, giving the authority six weeks in which to decide whether to make an Order. Any person proposing to carry out the works may give that notice.

In both cases the authority will want the owner to know. Expect the council to contact them, and expect the owner's view to be taken into account as a representation even though it is not determinative. An application made without telling the owner first will reach them anyway, at the point where it looks like something done behind their back.

Notifying the owner and what to send

There is no benefit in being coy about this. Write to the owner before you apply, and keep the letter.

  1. Identify the tree clearly, by position rather than by species alone, with a sketch or a photograph.
  2. Describe the works you want done and why, in plain terms.
  3. Say that you will be applying to the council for consent and that the council will contact them.
  4. Ask whether they agree to the works and whether they would prefer to instruct the contractor themselves.
  5. Offer to pay, if you are the one who wants the work done.

Point five resolves a surprising proportion of these disputes. Where the neighbour's objection is really about cost, an offer to fund the work changes the conversation. Where it is about the tree, you will find that out early and at little cost.

Keep the description of works precise. A request to "cut it back" invites refusal from everyone involved. A request for a 2 metre crown reduction to the eastern side, with the cuts specified, is something an arboriculturist can price and a council can assess, and our note on specifying crown work so contractors price it correctly sets out how to write it.

Boundary trees and shared ownership

Ownership of a tree follows the position of the trunk at ground level, not the canopy and not the roots. A tree wholly within your neighbour's garden is theirs even if two thirds of the crown is over yours.

A tree whose trunk straddles the boundary is owned by both parties together. Neither can fell it without the other's agreement, and felling it unilaterally is an act against the other's property. That is an awkward position and it is more common than people expect on Victorian boundaries where the line runs through a hedge that has grown into a row of trees.

Where the boundary itself is uncertain, the title plan is a general boundary only. Resolving a disputed boundary is a separate exercise from resolving the tree, and it is worth knowing which problem you are trying to solve before spending money.

This is the distinction that matters most, so it is worth setting out plainly.

Question Answer
Can I apply without owning the tree? Yes
Does consent let me enter the owner's land? No
Does consent let me cut the owner's tree? No
Do I still commit an offence if I work without consent? Yes, under section 210 of the 1990 Act
Can I cut branches overhanging my land? At common law, back to the boundary only
Do the cut branches belong to me? No, they remain the owner's property

The common law right to abate a nuisance by cutting back overhanging branches to the boundary line is long established, and it comes with two conditions that are routinely ignored. You may not enter the neighbour's land to do it without permission. And the arisings, branches and fruit alike, remain the owner's property, so the polite and lawful course is to offer them back rather than putting them in your green bin.

Where the tree is protected, that common law right does not override the statutory protection. Cutting back overhanging branches from a tree under a TPO without consent is an offence under section 210 whether or not the branches are over your land.

Carrying out works without the owner's agreement

If you proceed anyway, two separate liabilities arise.

Going onto the land is trespass. Damaging the tree gives the owner a claim for the diminution in value, which for a mature specimen tree assessed on a replacement basis can be a large figure. Courts have awarded substantial sums for the loss of amenity trees, and the fact that you held a council consent is no defence to a civil claim at all.

And if the works exceed what the consent permitted, or were carried out where no consent existed, the statutory offence bites too. Penalties for unauthorised works to a protected tree are set by the 1990 Act and the council can prosecute regardless of who owns the tree.

Where the volume of timber is large enough, a felling licence under the Forestry Act 1967 is a further requirement, and the licence applicant has to have the legal right to fell. That is a point at which the ownership question becomes unavoidable, and our note on woodland orders and felling licences explains how the two regimes interact.

Where the dispute is civil rather than planning

Councils will not adjudicate a neighbour dispute about a tree, and asking them to do so wastes everyone's time. Their interest is the tree's contribution to amenity and whether the proposed works harm it.

The civil routes, in rough order of cost, are a written agreement between the parties, mediation, a surveyor's report on the alleged damage, and litigation. Where the complaint is about a dense evergreen hedge rather than a tree, the high hedges provisions in Part 8 of the Anti-social Behaviour Act 2003 give a statutory complaints route to the council for hedges over two metres, which is a different process from tree consent and often the right one.

Where the complaint is about subsidence or drain damage, the evidence burden is higher than people expect. You need to show the tree caused the damage, which normally means soil analysis, root identification and a level monitoring record, and insurers usually run that process.

Practical steps before applying

Illustrative example: a homeowner wants a neighbour's protected lime reduced because it shades a kitchen window. They obtain a short report from an arboriculturist specifying a 2 metre reduction on the western aspect, write to the neighbour with the report and an offer to pay, get written agreement, then apply to the council with the neighbour named as owner. The council grants consent with a condition on timing. Details here are illustrative.

That sequence works because each step removes an objection. In order:

Get a competent arboricultural opinion on what work the tree can take, because a council will refuse works that damage a protected tree regardless of who asks. A tree survey or a short arboricultural report is the document that carries the argument, and PlanScope's draft is a starting point for a qualified arboriculturist rather than a substitute for one.

Then write to the owner. Then apply, naming them. Then, if consent is granted, get written agreement on access, contractor and dates before anyone climbs anything.

And if the owner refuses throughout, accept that the tree stays. The only remaining lawful option is cutting overhanging growth back to the boundary, with consent where the tree is protected, from your own side of the fence.

Enter your postcode on PlanScope to see which reports works affecting trees at your address are likely to need. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I apply for TPO consent on a neighbour's tree?

Yes. The application form under the Tree Preservation Regulations 2012 asks who you are, what interest you hold and who owns the tree, and it does not require you to be the owner. The council will contact the owner and treat their view as a representation, so write to them before you apply rather than after.

Does consent let me cut the tree?

No. Consent removes the statutory prohibition and nothing more. It gives no right to enter your neighbour's land and no right to cut their tree. Doing either without agreement is trespass and, where the tree is damaged, exposes you to a civil claim for its value that the consent is no defence against.

Who owns a tree on the boundary?

Ownership follows the position of the trunk at ground level, not the canopy or the roots. A tree wholly in your neighbour's garden is theirs even if most of the crown overhangs yours. Where the trunk straddles the line the tree is owned by both parties, and neither may fell it alone.

Can I cut branches that overhang my garden?

At common law you may cut back to the boundary line, without entering your neighbour's land. The arisings remain the owner's property, so offer them back. Where the tree is protected by a TPO or stands in a conservation area, you still need consent or must give notice first, and cutting without it is an offence.

What if the tree is a tall evergreen hedge?

Part 8 of the Anti-social Behaviour Act 2003 provides a high hedges complaints route to the council for evergreen hedges over two metres that affect reasonable enjoyment of a domestic property. It is a different process from tree consent, it carries a fee, and for a dense conifer boundary it is usually the right one.

Will the council resolve the dispute for me?

No. The council's interest is the tree's contribution to amenity and whether the proposed works harm it, not who is right between neighbours. The civil routes are agreement, mediation, a surveyor's report and, last, litigation. Where subsidence is alleged, the evidence burden is high and insurers usually run the process.

Sources and further reading

tree preservation orderboundary treessection 211neighbour disputesarboriculture

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture7 min read

Tree planting conditions: species, size and maintenance

Tree planting conditions ask for a plan, a species schedule, a specification and a maintenance period. A complete discharge package is usually determined without correspondence.

Read article →
Trees and Arboriculture7 min read

Pruning specifications councils will condition

Reduce by 30 per cent means nothing to a tree officer. BS 3998 specifies pruning by the dimensions of the crown that remains, and a specification written that way can be approved in one pass.

Read article →
Trees and Arboriculture7 min read

Soil volumes and pit design for new street trees

Soil volume decides whether a street tree reaches the size on the drawing or dies at fifteen years. Sizing it from mature canopy area, and specifying the pit, matters more than species choice.

Read article →
Trees and Arboriculture7 min read

Answering a tree officer's loss of amenity objection

A tree officer's objection is a professional opinion, not a refusal. Answer it on arboricultural terms by isolating what is disputed and evidencing that point alone.

Read article →
Trees and Arboriculture7 min read

Trees, subsidence and the planning answer

Blaming a protected tree for cracks is not enough. Consent turns on a full season of monitoring, trial pits, soil desiccation data and root identification, plus the heave risk of removal.

Read article →
Trees and Arboriculture6 min read

Woodland creation on a development site and its upkeep

New woodland is easy to draw and hard to keep alive. The planting design, the establishment regime and the legal mechanism all have to agree with each other.

Read article →