Professionals and Qualifications

Appointing a party wall surveyor: what the Act requires

7 min readBy PlanScope Editorial Team

An appointment under section 10 must be in writing and cannot be rescinded, and the surveyor's duty is to the Act rather than to the owner paying the fee.

There is no statutory qualification for a party wall surveyor. The Party Wall etc. Act 1996 defines a surveyor as any person who is not a party to the matter, appointed or selected under section 10 to determine the dispute. That is the whole of the competence test in the legislation. A neighbour could appoint their cousin, provided the cousin is not a party.

What the Act does control, tightly, is the mechanics. The appointment must be in writing. Once made it cannot be rescinded. And the surveyor's duty is to the Act rather than to the person paying, which is the part most owners misunderstand.

Why there is no statutory qualification for the role

The Act is a dispute resolution statute, not a licensing one. Parliament set up a tribunal of surveyors to settle the questions the Act raises and left the market to supply the competence. In practice the competent pool is drawn from chartered building surveyors and chartered structural engineers who hold a party wall specialism, and the professional institutes maintain registers and faculties covering it.

The absence of a statutory qualification matters because the surveyor's decisions bind both owners. An award can determine the right to execute the work, the time and manner of doing it, and liability for costs. Appointing someone without party wall experience produces awards that are vague where they should be precise, and it is the adjoining owner who usually suffers.

Check the person's register entry, their experience of the specific work type, and their professional indemnity cover before appointing. Checking a professional institute register and reading a consultant CV for real competence both apply here.

Agreed surveyor against two appointed surveyors

Once an adjoining owner dissents from a notice, or fails to reply within 14 days and is deemed to dissent, a dispute exists and section 10 applies. Two routes open.

The parties can concur in the appointment of one surveyor, the agreed surveyor, who acts for neither owner and determines the matters in dispute alone. It costs less and moves faster, and it works when both owners accept that the surveyor is impartial.

Or each owner appoints their own surveyor. The two appointed surveyors then act together, and must forthwith select a third surveyor. This route costs more and suits cases where the works are substantial, the relationship is poor, or the adjoining owner wants someone who will scrutinise the design.

Feature Agreed surveyor Two appointed surveyors
Number of appointments One, by both owners jointly One each
Third surveyor Not selected Selected forthwith by the two
Typical cost Lower Higher, usually borne by the building owner
Speed Faster Slower, with correspondence between surveyors
Suited to Straightforward works, cooperative neighbours Excavation, underpinning, contested schemes

An adjoining owner who does nothing at all can find a surveyor appointed on their behalf under the ex parte provisions, because the Act does not allow one party to stall the process by refusing to engage.

Selection of the third surveyor and its purpose

The third surveyor is not a chair. They sit unused in most cases, selected at the outset and never called upon. Either owner or either of the appointed surveyors may refer a matter to them, and the third surveyor can then determine it alone.

That design is deliberate. It means a single appointed surveyor cannot block an award indefinitely, and it gives an owner who thinks their own surveyor is being unreasonable somewhere to go. The third surveyor's fees fall to be determined like any other costs under the award.

Pick the third surveyor properly rather than reaching for the first name in the address book. A referral is expensive and the person who takes it decides the point.

What the appointment must contain to be valid

An appointment under section 10 must be in writing. Beyond that the Act is silent on form, and the useful appointment letter names the appointing owner, identifies the property, identifies the adjoining property, states the statutory provision under which the appointment is made, and is dated and signed.

Three traps recur. An appointment made before a notice has been served and dissented from is premature, because no dispute yet exists. An appointment by someone who is not an owner within the meaning of the Act, such as a short-term tenant or a party acting without authority, is ineffective. And an appointment that purports to let the owner withdraw it conflicts with the Act, which provides that an appointment cannot be rescinded.

Where a surveyor dies, becomes incapable of acting or declares themselves incapable, a fresh appointment can be made. Where an appointed surveyor refuses to act or neglects to act for ten days after a written request, the Act allows the other surveyor to proceed alone on the matter.

Fees, who pays and how they are challenged

The surveyor or surveyors determine the costs of making the award and who pays them. The usual outcome is that the building owner pays, on the basis that the works are for their benefit and the adjoining owner did not ask for any of it. That is a convention rather than a rule, and costs can be apportioned differently where an adjoining owner has behaved unreasonably or asked for work beyond what the Act requires.

Challenging fees goes through the Act, not through a complaint. Refer the question of costs to the third surveyor, or appeal the award. An owner who simply refuses to pay an award that includes costs is in breach of the award.

Illustrative example. An owner digging a basement under a Victorian terrace serves notice under sections 2 and 6. The neighbour dissents and appoints their own surveyor. The two surveyors select a third, agree a schedule of condition with photographs of the neighbour's plaster and party wall, and make an award covering sequencing, monitoring, access and reinstatement. Later cracking is checked against the schedule, which settles in an afternoon what would otherwise be a year of argument. The details here are illustrative only.

The award, the schedule of condition and compensation

The award records what has been determined. A competent award identifies the works, attaches the drawings, sets out the method and sequence for the notifiable elements, deals with access and working hours, and incorporates a schedule of condition of the adjoining property.

The schedule of condition is not required by the Act. It is the single most valuable document in the process, because it fixes the state of the neighbour's property before work starts and converts later damage arguments into a comparison exercise.

The Act gives the adjoining owner a right to compensation for loss or damage resulting from work carried out under it, and requires the building owner not to cause unnecessary inconvenience. Either owner may appeal an award to the county court within 14 days of service of the award. That deadline is short and is not extended by negotiation.

Where planning permission is irrelevant to the process

The two regimes do not touch. A basement extension with full planning permission still needs party wall notices. A rear extension built under permitted development, with no application at all, still needs them. And a party wall award gives no authority whatever to carry out development that needs planning permission or building regulations approval.

Nor does an adjoining owner's dissent under the Act affect the planning application. Dissent is not an objection, it is the trigger for the statutory process, and a case officer determining an application has no role in party wall matters.

Party wall work is one of several things PlanScope does not produce. Its report types cover the planning submission itself, and you can see the full set on the report index, while reviewers who can sign off technical drafts are listed in the professional directory. Reports should be reviewed before submission and PlanScope does not guarantee planning approval.

This is general guidance, not legal advice. Appointments, awards and appeal deadlines under the Act have real consequences, so take advice from a qualified professional before acting.

Frequently asked questions

Does a party wall surveyor need a qualification?

Not under the Party Wall etc. Act 1996, which defines a surveyor only as a person who is not a party to the matter, appointed or selected under section 10. In practice the competent pool is chartered building surveyors and structural engineers with a party wall specialism. Check the register entry, the relevant experience and the professional indemnity cover.

What is the difference between an agreed surveyor and two surveyors?

An agreed surveyor is one person appointed jointly by both owners who determines the dispute alone, which costs less and moves faster. Alternatively each owner appoints their own surveyor and those two select a third surveyor. Two appointments suit substantial works such as excavation or underpinning, or a poor relationship between owners.

What does the third surveyor actually do?

Usually nothing. They are selected at the outset by the two appointed surveyors and sit unused unless either owner or either surveyor refers a matter to them, at which point they can determine it alone. The arrangement stops one appointed surveyor blocking an award and gives an owner a route if their own surveyor is being unreasonable.

Can I withdraw my appointment of a party wall surveyor?

No. The Act provides that an appointment under section 10 cannot be rescinded. A fresh appointment can be made where the surveyor dies, becomes incapable of acting or declares themselves incapable, and where an appointed surveyor neglects to act for ten days after a written request the other surveyor may proceed alone.

Do I need party wall notices if I have planning permission?

Yes, and the reverse applies too. The two regimes are independent. Works carried out under permitted development with no planning application still need notices, and a party wall award gives no authority to carry out development that requires planning permission or building regulations approval.

Sources and further reading

party wallsurveyorprofessional competenceappointmentaward

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Who signs a Design and Access Statement

There is no signature block and no prescribed author for a Design and Access Statement. Article 9 of the DMPO 2015 says when one is needed and what it must explain.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →