Permitted Development

Article 3(5), limitations and conditions in the GPDO

7 min readBy PlanScope Editorial Team

Breaching a condition of a permitted development class does not leave you with a condition breach. It leaves you with unauthorised development. Here is why, and what article 3(5) adds.

Article 3 of the Town and Country Planning (General Permitted Development) (England) Order 2015 grants the permission, and it takes it away again in three ways. Article 3(2) makes every grant subject to the exceptions, limitations and conditions written into the relevant class in Schedule 2. Article 3(4) stops the Order overriding a condition on an existing planning permission. And article 3(5) withdraws the permission altogether where the building the rights attach to was built unlawfully, or where the existing use the rights depend on is unlawful.

Those three provisions decide more prior approval arguments than the class text itself. An architect reading a class needs to separate what defines it from what is attached to it, because the consequence of getting each one wrong is different.

The difference between limitations and conditions

A limitation describes the development the class permits. The 4 m depth for a single-storey rear extension on a detached house, the 3 m for other houses, the 4 m height limit, the restriction on the side of a house fronting a highway: all of these say what the class covers.

A condition is something you must do, or refrain from doing, to keep the benefit of the grant. Using materials of a similar appearance to the existing house. Obscure glazing and restricted opening on an upper-floor side window. Setting a roof extension back 20 cm from the eaves. Applying for a prior approval determination before work starts.

The practical difference shows up when things go wrong. Exceed a limitation and the development was never permitted development at all, because it falls outside the description of the class. Breach a condition and the result is the same in law, which surprises people: the permission granted by the Order is a conditional permission, so failing to comply means the development is not authorised by the Order and becomes development carried out without planning permission.

Nobody serves a breach of condition notice for a rear extension built in the wrong brick. The council enforces against the extension.

What article 3(5) requires

Article 3(5) is the lawfulness gateway, and it is the first question to ask on any conversion or reuse. Where the class grants permission in connection with an existing building, the rights do not apply if the building operations that created that building were unlawful. Where the class grants permission in connection with an existing use, the rights do not apply if that use is unlawful.

This is why a barn erected without the right agricultural notification, or an office created by an unauthorised change of use, cannot simply be converted under a Part 3 class. The rights never arose.

Lawfulness can be restored by time. Once the operational development or the change of use has become immune from enforcement, it is lawful, and article 3(5) no longer bites. Enforcement time limits for breaches occurring on or after 25 April 2024 in England are ten years for both operational development and changes of use, following the amendments made by the Levelling-up and Regeneration Act 2023, so check when the breach occurred before assuming the old four-year rule applies. The clean answer is a certificate of lawfulness for the existing use or development, which converts an argument into a document.

Our note on the Class Q structural works test shows how the lawfulness question and the building condition question get tangled together on barn schemes.

Consequences of breaching a condition

Treat a breach as producing unauthorised development, and plan accordingly. Three routes are then open.

  1. Put it right, so that the development complies with the condition as built.
  2. Apply for full planning permission for the development as it stands, which is a retrospective application under section 73A of the Town and Country Planning Act 1990.
  3. Do nothing and wait for immunity, which leaves the building unmortgageable and unsaleable in the meantime and offers no protection from an enforcement notice in the interim.

The second route is the usual one, and it is not a formality. A council assessing a retrospective application considers the development on its merits against the development plan, and the fact that it would have been permitted development had the condition been met carries some weight as a fall-back but does not decide the case.

Enforcement against a condition breach

Where the development is unauthorised, the council can serve an enforcement notice requiring the breach to be remedied, and the notice can require removal rather than alteration. Appeal rights follow under section 174, and the grounds include that planning permission ought to be granted.

Councils in practice ask for correction first. An obscure glazing condition breached on a side window is usually resolved by fitting the right glass, and a materials condition by rendering or reclaiming. Where the breach is structural, such as a roof extension built flush to the eaves rather than set back, the remedy is expensive and the conversation becomes adversarial quickly.

Conditions attached to prior approvals

Parts 3, 6, 16 and 20 work through prior approval, and the requirement to apply is itself a condition of the class. Starting work before the determination, or before the 56-day period expires without a decision, means the development is not permitted.

Prior approval classes also carry their own completion conditions. Several of the Part 3 residential conversion classes require development to be completed within three years of the date of prior approval, and Part 6 agricultural classes carry their own timing and use restrictions. Diarise the date on the decision notice, because a conversion half finished at the deadline has no fall-back.

The approval itself frequently attaches further conditions on top of the class ones, dealing with contamination, noise, flooding or transport depending on the class. Read those separately from the Schedule 2 text. The agricultural prior notification route under Part 6 shows how the class conditions and the approval conditions stack.

Evidencing compliance

The only formal way to confirm that works are lawful is a certificate of lawfulness, applied for under section 192 for proposed development or section 191 for something already built. A certificate is a decision on fact and law rather than a planning judgement, and it binds the council.

Short of that, keep the evidence a future purchaser's solicitor will ask for:

Condition Evidence to keep
Materials of similar appearance Supplier specification, delivery notes, dated photographs
Obscure glazing and restricted opening Glazing schedule showing obscuration level, window ironmongery detail
Roof extension set back from eaves Dimensioned as-built section
Prior approval applied for Decision notice or evidence the 56 days expired
Completion within the class period Dated completion photographs and building control certificate

Most disputes on sale are about materials and glazing, and both are solved by photographs taken at the time.

Common conditions people overlook

Side-facing windows above ground floor level are the single most missed condition on householder extensions, and the requirement runs to both obscure glazing and restricted opening below 1.7 m above floor level. The 20 cm eaves set-back on roof extensions comes second.

Solar installations carry siting and removal conditions that people forget once the panels are up, including the requirement to minimise effect on the external appearance of the building and on amenity, and to remove equipment when no longer needed. The projection limits are covered in domestic solar panels and the 200 mm projection limit.

An Article 4 direction removes rights entirely rather than conditioning them, so check for one before working through Schedule 2 at all. And where any part of the analysis is finely balanced, say so in the planning statement rather than asserting compliance the council has not confirmed.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A lawful development certificate is the only formal way to confirm that works are lawful.

Frequently asked questions

What is the difference between a limitation and a condition in the GPDO?

A limitation describes the development the class permits, such as a 4 m depth or a 4 m height. A condition is a requirement attached to the grant, such as matching materials or obscure glazing. Exceeding a limitation puts the works outside the class. Breaching a condition removes the benefit of the grant, and both leave unauthorised development.

Can I use permitted development rights on an unlawful building?

Not while it remains unlawful. Article 3(5) of the GPDO 2015 withdraws the permission where the building operations that created the building were unlawful, or where the existing use the rights rely on is unlawful. Once the breach becomes immune from enforcement the position changes, and a certificate of lawfulness is the way to prove it.

What happens if I build in the wrong materials?

The development ceases to be permitted by the Order, so it becomes development carried out without planning permission. Councils normally ask for correction first, which on a materials condition usually means recladding or rendering. If correction is impractical, a retrospective application under section 73A of the 1990 Act is the route, assessed on its planning merits.

Do I have to wait for prior approval before starting work?

Yes. Applying for a determination is itself a condition of the classes in Parts 3, 6, 16 and 20, so starting before a decision, or before the 56-day period expires without one, means the works are not permitted development. Several Part 3 classes also require completion within three years of the prior approval date.

How long do I have before an unauthorised extension becomes immune?

For breaches occurring on or after 25 April 2024 in England, the enforcement time limit is ten years for both operational development and changes of use, following amendments made by the Levelling-up and Regeneration Act 2023. Earlier breaches may still be governed by the previous four-year rule, so establish the date the breach occurred first.

Is a lawful development certificate worth applying for?

It is the only formal way to confirm that works are lawful. A certificate under section 192 covers proposed development and section 191 covers something already built, and the decision turns on fact and law rather than planning judgement. Purchasers, lenders and insurers increasingly ask for one where permitted development has been relied on.

Sources and further reading

permitted developmentgpdoconditionslawful development certificateenforcement

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

The three year deadline on a prior approval

A planning permission must be begun within three years. A Part 3 prior approval must be completed within three years of the prior approval date, and the condition sits in the Order where nobody can vary it.

Read article →
Permitted Development7 min read

Class M: betting shops and takeaways to homes

Class M turns a small shop, betting office or hot food takeaway into a dwellinghouse through prior approval. The 150 m2 floorspace cap and the 20 March 2013 qualifying use date decide most cases before design begins.

Read article →
Permitted Development8 min read

Class L and moving between C3 and C4 use

Class L permits a dwellinghouse to become a small house in multiple occupation and back again, with no application. The limits are the household test, the six-resident ceiling and the Article 4 directions that withdraw the right.

Read article →
Permitted Development8 min read

Industrial and warehouse extensions under Part 7

Part 7 Class H lets an occupier extend an industrial building or warehouse without an application, within limits that are tighter than they look. This covers the allowance, the boundary condition and the new process restriction.

Read article →
Permitted Development7 min read

Bat roosts and roof works under permitted development

A re-roof or loft conversion needs no planning application, so nothing prompts an ecology check. This sets out when to commission a roost assessment, the survey seasons that control the programme, and who is liable.

Read article →
Permitted Development7 min read

Protected trees and permitted development on the same site

Permitted development grants planning permission for the building work, not consent to touch a protected tree. This covers the consent routes, the root protection trap in foundation design, and how to sequence the two.

Read article →