Asking the council to serve a section 215 notice

6 min readBy PlanScope Editorial Team

Section 215 lets a council require steps to remedy land whose condition harms the amenity of the area. It is discretionary, so the request has to be built properly.

Section 215 of the Town and Country Planning Act 1990 lets a local planning authority serve a notice on the owner and occupier of land requiring steps to be taken to remedy its condition, where that condition adversely affects the amenity of part of the authority's area or an adjoining area. It is the power people reach for when a building has been left to rot behind plywood for six years, or a yard fills with rubble in full view of a residential street. It is also discretionary, which is the part most complaints run into.

Nobody can force a council to serve one. What you can do is make serving one the easiest decision on the officer's desk.

What the notice can and cannot require

The notice sets out the steps the recipient has to take. In practice that means things like clearing rubbish and vegetation, repairing or rebuilding a boundary wall, painting or rendering a frontage, replacing broken glazing, repairing a roof enough to keep weather out, removing hoardings and reinstating a forecourt, or securing an open site.

What it cannot do is force a use to change, force a building to be brought back into use, or require works that go beyond remedying the condition of the land. It is not a way to make a landlord let an empty shop, and it is not an alternative to enforcement action against an unauthorised use or unauthorised building work. Those are different powers with different tests.

For listed buildings and unlisted buildings in conservation areas there are separate repairs and urgent works powers under heritage legislation, which are usually better suited where the problem is the decay of a building of interest rather than the state of the land around it.

The amenity test, and how councils apply it

Amenity is not defined, and that gives an authority room to judge. The practical question an officer asks is whether the condition of the land is harming the character or appearance of the area to an extent that ordinary people would notice and object to.

Three things push a case towards yes. Visibility from public places, because harm to amenity is judged from where people actually are. Duration, because a skip outside a house being renovated is temporary and a collapsed outbuilding is not. And contrast with the surroundings, which is why the same condition attracts action in a conservation area high street and none on an industrial estate.

Things that usually fall outside it: a garden that is merely overgrown, a disagreement about a neighbour's taste, a building that is simply empty but sound, and anything visible only from inside another private property.

There is a middle group where councils differ. A shop with a shuttered, fly-posted frontage on an otherwise active parade. A garden filled with vehicles that may or may not be a business. A boundary fence collapsing slowly into a footpath. Whether these get a notice usually depends on how much other enforcement work the team is carrying, which is worth knowing before you judge the response.

Making the case to the council

Put the request in writing to the planning enforcement team and give them something they can reuse in the notice.

  1. The address and, where you can find it, the registered title number.
  2. Dated photographs from public vantage points, taken over a period rather than on one day.
  3. A short description of the condition, feature by feature, in plain terms.
  4. An explanation of the harm, referring to what the street looks like and who sees it.
  5. Any history you know of: how long it has been like this, previous complaints, previous applications.
  6. The steps you say would remedy it.

The last point does more work than people expect. An officer who has to invent the schedule of works from scratch is slower than one who is checking a list somebody else drafted. Keep the tone factual. A file of measured observations is more useful to the council than a petition, though a petition does tell a councillor that the street cares.

If nothing happens, escalate in order: the enforcement team leader, then the council's formal complaints procedure, then your ward councillor, and finally the Local Government and Social Care Ombudsman if the complaint is about how the council handled the matter rather than about the decision itself.

What the notice must specify

A valid notice identifies the land, states what the authority considers the condition to be and why it adversely affects amenity, specifies the steps required, and gives the period for compliance. It cannot take effect earlier than 28 days after service.

Precision matters. Repair the wall is not a specification. Rebuild the collapsed section of the front boundary wall in brick to match the existing, to a height of 1.2 metres, is. Notices that are vague tend to fall away on appeal, and an officer who knows that will take time over the drafting.

Appeals, and the grounds that work

An appeal goes to the magistrates court under section 217, and it must be made before the notice takes effect. The grounds include that the condition of the land does not adversely affect amenity, that the condition results from operations or a use that do not contravene planning control, that the requirements exceed what is necessary to prevent the harm, and that the compliance period is too short.

The court can quash or vary the notice. There is a further appeal to the Crown Court. Most contested notices are argued on the third ground, because owners rarely dispute that the site looks bad and instead dispute the scope of what they are being asked to do.

Works in default, and why councils hesitate

Section 219 lets the authority enter the land, carry out the required steps itself and recover the expenses from the person who is then the owner. The cost can be recovered as a debt and registered against the land, so it is eventually recoverable on sale.

Eventually is the operative word. The council has to fund the works first, and recovery from an owner who is untraceable, insolvent or overseas can take years. Authorities also have to procure the works, insure them and take on the safety duties of whoever enters the site, none of which is trivial for a fire-damaged building. That, more than any doubt about the amenity test, explains why the power is used sparingly. Authorities tend to spend a long time on correspondence, because a notice that produces voluntary compliance costs nothing and a notice that produces a default contract costs a budget line.

Where the nuisance is behaviour rather than the state of the land, a community protection notice under the Anti-social Behaviour, Crime and Policing Act 2014 is sometimes quicker, and environmental health has separate powers over accumulations that are prejudicial to health.

If your interest runs the other way and you are the one preparing an application, PlanScope drafts the supporting documents, including a Statement of Community Involvement, and you can browse all the report types or enter a postcode on the home page to see what a site needs. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice, so check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Can I make the council serve a section 215 notice?

No. The power in section 215 of the Town and Country Planning Act 1990 is discretionary, so a council decides whether to use it and cannot be compelled by a resident. What you can do is give the council the evidence and the reasoning that make it straightforward to act, and follow it up through the complaints procedure and your ward councillor if nothing happens.

Does the land have to be derelict?

No. The test is whether the condition of the land adversely affects the amenity of a part of the authority's area, or of an adjoining area. Untidiness alone is usually not enough. A collapsed boundary wall on a main street, a fire-damaged shell behind hoarding, or a yard of dumped material visible from the road are the sorts of conditions that meet it.

How long does an owner have to comply?

The notice specifies the steps and a period for taking them, and it cannot take effect earlier than 28 days after service. The compliance period is set by the council and should be reasonable for the work required. If the owner thinks the period is too short, that is one of the grounds of appeal to the magistrates court.

What happens if the owner ignores the notice?

Failing to comply is an offence and the council can prosecute in the magistrates court, with a further offence for continuing non-compliance after conviction. Separately, under section 219 the council can enter the land, carry out the works itself and recover its expenses from the owner, which can be registered against the land.

What if the owner cannot be traced?

The council can serve on the owner and occupier as best it can identify them, including by affixing the notice to the land, and land registry searches usually find a registered proprietor. Where no owner can be traced, works in default becomes the practical route, and the cost is recovered later against the land.

Sources and further reading

section 215untidy landamenityenforcementderelict siteneighbours

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Neighbours, Objections and Community

View all →
Neighbours, Objections and Community7 min read

Asking the council to make an Article 4 direction

Councils move slowly on Article 4 because of compensation liability. A request that acknowledges it, and asks for a twelve month deferred start, gets a better hearing.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a change of use that needs no permission

Moving between two uses in the same class is not development, so no application exists. The remedies people reach for apply to permitted development rights, which is a different thing.

Read article →
Neighbours, Objections and Community7 min read

Petitions and template objections: how officers treat them

Public opposition is not itself a material consideration. The matters the opposition is about, if they are planning matters, are. That distinction decides whether a campaign changes anything.

Read article →
Neighbours, Objections and Community9 min read

Reading a viability assessment as a community objector

A viability assessment is an argument, not an accounting exercise. National guidance puts the burden on the applicant, and every assumption in the document can be tested.

Read article →
Neighbours, Objections and Community8 min read

Objecting to a scheme on an allocated site

On an allocated site, objecting in principle gets logged and set aside. The objections that change schemes aim at everything the allocation left open.

Read article →
Neighbours, Objections and Community6 min read

When a scheme is built differently from the approved plans

The drawings you objected to may not be the approved ones. How to check the register, report a departure usefully, and what remedies the council actually has.

Read article →