Daylight, Sunlight and Amenity

Average daylight factor targets for new flats

7 min readBy PlanScope Editorial Team

Kitchens 2 per cent, living rooms 1.5 per cent, bedrooms 1 per cent. How those average daylight factor targets work, how BS EN 17037 differs, and what actually causes failures.

For new flats the working daylight targets are still an average daylight factor of 2 per cent in a kitchen, 1.5 per cent in a living room and 1 per cent in a bedroom. Those figures came from BS 8206-2, they are carried through in BRE 209, and most English planning officers assess residential daylight against them even though the British Standard that set them has been withdrawn in favour of BS EN 17037.

That overlap is the source of most arguments on submitted assessments. Two methods, two sets of numbers, and a policy that often names neither. Getting the reporting basis agreed before modelling starts saves a round of revisions.

What average daylight factor measures

Average daylight factor is the ratio of internal illuminance to unobstructed external illuminance under a standard overcast sky, averaged across the working plane of a room and expressed as a percentage. It is a geometric calculation, not a climate one.

The inputs are few: net glazed area, visible light transmittance of the glazing, total internal surface area of the room, average surface reflectance, and the angle of visible sky from the centre of the window. Because it uses a standard overcast sky, it says nothing about orientation. A north-facing and a south-facing room with identical geometry return the same average daylight factor, which is both the method's convenience and its main weakness. The consequences for a north-facing room are set out in daylight to a north-facing habitable room.

Room-type targets and what they assume

The targets are not arbitrary. They reflect an assumption about how much of each room's use depends on daylight and how long people occupy it.

Room Average daylight factor target
Kitchen 2 per cent
Living room 1.5 per cent
Bedroom 1 per cent

Two practical points follow. In an open-plan kitchen, living and dining space the higher kitchen target applies to the whole room, which is why open-plan layouts fail more often than cellular ones in the same building. And a room labelled as a study or a snug on the drawings is assessed as a habitable room, so labelling will not rescue a poorly lit space.

Where a shortfall is unavoidable, the honest approach is to report it by room with the figure, rather than averaging across the flat until it disappears.

How BS EN 17037 criteria differ

BS EN 17037 works in illuminance rather than daylight factor. It asks whether a target illuminance is achieved across a proportion of the reference plane for a stated proportion of daylight hours, and the UK National Annex sets room-specific target values for dwellings that are lower than the general European targets.

Three differences matter in practice:

  1. It is climate-based, so orientation, local weather data and obstructions all affect the result. Two identical rooms facing different directions give different answers.
  2. It assesses a proportion of the area rather than an average, so a room can pass on the average daylight factor method and fail the area-based criterion, or the reverse.
  3. It brings in view out and sunlight exposure as separate criteria, which the average daylight factor method does not address at all.

Because it is climate-based, the method rewards good orientation and penalises a deep plan with a single north window more honestly than average daylight factor does. It is also more sensitive to modelling assumptions, which is why a reviewer will want the weather file and the schedule of daylight hours stated.

Ask the local planning authority which basis it wants at pre-application. Some boroughs now ask for both, which is a reasonable request and roughly doubles the modelling fee.

Glazing area, reflectance and room depth

The lever with the most effect is usually room depth, not glazing area. Beyond roughly two and a half times the window head height, additional depth adds floor area that receives very little daylight while increasing the total internal surface area in the denominator. So a deep room can get worse when you make it bigger.

Glazing specification matters more than people expect. Visible light transmittance for a double-glazed unit with a solar control coating can sit well below that of a clear unit, and a triple-glazed unit lower still. Where the overheating strategy is pushing towards a low g-value glass, the daylight calculation and the Part O assessment are pulling against each other, which is the trade-off covered in daylight, glazing area and Part O overheating.

Surface reflectance is a legitimate input and a common place to overclaim. A model assuming very high wall and ceiling reflectance across every room is assuming a decorating scheme nobody has committed to. Use reasonable values, state them, and do not rely on reflectance to close a large gap.

Balconies and overhangs in the calculation

Inset balconies are the single most common cause of daylight failure in new flats. A balcony recessed into the building over the window below removes most of the visible sky from the room behind it, and the loss is severe enough to take a compliant room to less than half the target.

The effect is geometric and predictable, so it can be designed out:

  1. Project the balcony beyond the facade rather than insetting it, where massing and overlooking allow.
  2. Keep the balcony to one side of the window rather than across its full width.
  3. Use an open balustrade and an open or partly open soffit rather than a solid slab.
  4. Where an inset balcony is unavoidable, put it outside the most daylight-sensitive room, which usually means a bedroom rather than a kitchen.

Projecting canopies, brise soleil and deep window reveals all work the same way at a smaller scale. Model them as built rather than as a flat facade, because an assessment that ignores a 1.2m overhang will be rejected on review.

Reporting by unit and by room

Report every habitable room in every unit, not a sample. Where a scheme has hundreds of flats, the schedule can be an appendix, but the summary needs to state how many rooms meet the target, how many fall short, and by how much.

A useful summary distinguishes three groups: rooms meeting the target, rooms marginally below it, and rooms substantially below. Officers and committee members can work with that. A single sentence saying most rooms comply invites a request for the full schedule and another three weeks on the determination clock.

Include the assumptions on the face of the report: glazing transmittance, reflectances, whether balconies and reveals are modelled, the working plane height, and which rooms are treated as kitchens. The Daylight and Sunlight Assessment has to be reproducible by a peer reviewer, and most of the disputes that reach appeal are about assumptions rather than arithmetic.

Arguing an urban context shortfall

BRE 209 describes itself as guidance and says its numerical criteria are advisory rather than mandatory, which leaves room for a context argument. Room for it, not a free pass.

An argument that works has three parts. Evidence of what daylight levels existing flats in the same street pattern actually achieve. A design that demonstrably does everything reasonable within the constraint, meaning balconies resolved, room depths controlled and glazing maximised. And a clear statement of the residual shortfall by room, with the worst cases named.

An argument that fails leads with density policy and treats the numbers as a formality. The detail of what a dense site can realistically reach is covered in daylight in a dense urban block.

Enter your postcode on PlanScope to see which daylight and amenity reports your scheme is likely to need.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified daylight consultant before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What average daylight factor does a new flat need?

The working targets are 2 per cent in a kitchen, 1.5 per cent in a living room and 1 per cent in a bedroom. They originate in BS 8206-2 and are carried through in BRE 209. In an open-plan kitchen, living and dining room the kitchen target applies to the whole space, which is why open plans fail more often.

Has BS EN 17037 replaced average daylight factor?

It has replaced the British Standard the targets came from, but average daylight factor is still what most English planning authorities assess against. BS EN 17037 works in illuminance over a proportion of the room area for a proportion of daylight hours, and is climate-based. Ask the authority which basis it wants before modelling.

Why do inset balconies cause daylight failures?

A balcony recessed into the facade above a window removes most of the visible sky from the room behind, and the loss can take a compliant room to less than half its target. Projecting the balcony, narrowing it to one side of the window, or using an open soffit and balustrade all recover part of the loss.

Can high surface reflectance be used to meet the target?

Reflectance is a legitimate input, but assuming very high values across every room assumes a decorating scheme nobody has committed to. Use reasonable values, state them in the report, and do not rely on reflectance to close a large shortfall. Reviewers check this input first when a result looks marginal.

Does orientation affect average daylight factor?

No. The calculation uses a standard overcast sky, so a north-facing and a south-facing room with the same geometry return the same figure. That is the method's main weakness. BS EN 17037 is climate-based and does account for orientation, which is one reason some authorities now ask for both assessments.

Sources and further reading

daylightaverage daylight factorbre 209bs en 17037flatsresidential amenity

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Daylight, Sunlight and Amenity

View all →
Daylight, Sunlight and Amenity6 min read

Daylight to rooms behind deep balconies and access decks

The obstruction is your own building. How projection, soffit height and balustrade choice change the daylight result, and what the assessment has to show.

Read article →
Daylight, Sunlight and Amenity8 min read

Adequate natural light as a Class MA prior approval matter

Adequate natural light carries a duty to refuse, not a discretion to weigh, and it is assessed on your drawings. Here is what to submit and how deep floorplates are made to work.

Read article →
Daylight, Sunlight and Amenity7 min read

Overshadowing of a public park by a tall building

The sun on ground test gives one number for an amenity space. A park is many spaces. Here is how to zone it, baseline it and report it so the result survives committee.

Read article →
Daylight, Sunlight and Amenity7 min read

Obscure glazing conditions and their daylight effect

Obscuring glass leaves the geometric daylight metrics untouched and alters everything calculated from transmittance. What changes, what does not, and the alternatives.

Read article →
Daylight, Sunlight and Amenity8 min read

Amenity harm and the presumption in favour of development

A failed Vertical Sky Component test is an input, not a reason for refusal. How to turn daylight findings into weight an inspector can use in the planning balance.

Read article →
Daylight, Sunlight and Amenity7 min read

Measuring existing windows for a daylight survey

External geometry can be measured from the street. Room depth and room use cannot, and that is where most daylight assessments are challenged at committee and on appeal.

Read article →