Background sound level and why it governs

6 min readBy PlanScope Editorial Team

In a BS 4142 assessment everything is measured against the background sound level. Three decibels of error moves the conclusion by a whole category.

Background sound level is the A-weighted sound pressure level exceeded for 90 per cent of a given time interval, written as LA90,T. In a BS 4142 assessment it is the number everything else is measured against, because the standard works from the arithmetic difference between the rating level of the source and the background level at the same place.

Get the background wrong by 3 decibels and the conclusion moves by a whole category. That is why acousticians argue about it more than about the source.

What the measure describes

LA90 is a statistical descriptor. Over a measurement period, the sound level rises and falls as cars pass, doors close and birds sing. LA90 is the level that was exceeded for 90 per cent of that period, so it sits near the bottom of the distribution and approximates the underlying sound that is there when nothing in particular is happening.

That underlying sound is what BS 4142:2014+A1:2019 calls the residual sound, and the background level is the measure of it. The standard is explicit that background is not an average. LAeq, the energy-average level, is pulled upwards by short loud events and describes something different.

Use LA90 when you are asking how audible a new source will be. Use LAeq when you are asking about total exposure.

Why a statistical level rather than a mean

A new extract fan will be heard against the quiet moments, not against the average. A resident lying awake at two in the morning is comparing the fan to the sound of the street between vehicles.

The 90 per cent exceedance figure captures that quiet floor while still excluding the very quietest instants, which are unstable and easily contaminated by the measurement itself. It is a compromise, chosen because it behaves consistently across different environments, and it is one reason BS 4142 results are reproducible between consultants when the survey is done properly.

Choosing a representative period

The standard requires the background to be representative of the period during which the source will operate. That is a judgement, and it has to be justified in the report rather than asserted.

Reference time intervals are 1 hour during the day, taken as 07:00 to 23:00, and 15 minutes at night, taken as 23:00 to 07:00. A plant item running 24 hours needs both. A restaurant extract running until midnight needs a night-time background for the last hour.

  • Survey long enough to see the pattern. A single evening tells you nothing about a Sunday.
  • Avoid atypical conditions: heavy rain, wet road surfaces, wind above about 5 metres per second, school holidays, and any week when the neighbouring road is closed.
  • Check what was happening. A works compressor running during the survey raises the background and flatters the assessment.
  • Where levels vary through the week, report the range and explain which value has been taken forward and why.

Choosing the lowest single 15 minute LA90 of the week is over-cautious. Choosing the highest is indefensible. The usual practice is to identify the typical lowest levels that recur, and to test the assessment against a lower value as a sensitivity check.

Measurement position and height

Measure at the assessment location, which means at the nearest or most affected noise-sensitive receptor rather than at the site boundary.

Free field measurement is preferred: at least 3.5 metres from any reflecting surface other than the ground, with the microphone 1.2 to 1.5 metres above ground for a ground floor receptor. Where free field is impossible on a tight urban site, measure close to the facade and apply the correction the standard sets out, then say in the report that you have done so.

For an upper floor window, the position should represent that window, which often means a measurement at height from a neighbouring balcony or a modelled correction. Do not measure at ground level and quietly apply it to a third floor bedroom.

Record the position on a plan and photograph it. A reviewer who cannot see where the meter stood cannot check anything.

What the number does to the outcome

BS 4142 compares the rating level of the specific sound, which is the specific sound level plus corrections for tone, impulsivity, intermittency and other characteristics, with the background sound level.

Difference between rating level and background Initial indication in the standard
Around +10 dB or more An indication of a significant adverse impact, depending on context
Around +5 dB An indication of an adverse impact, depending on context
Around 0 dB or lower An indication of low impact, depending on context

The phrase "depending on context" is doing real work. The standard requires the initial estimate to be modified by context: the absolute level of the sound, the character of the area, the sensitivity of the receptor and the presence of other sources. A rating level 10 decibels above a background of 25 decibels in open countryside is a different problem from the same arithmetic in a city centre.

Character corrections are where the arithmetic gets contested. Tonality can add up to 6 decibels, impulsivity up to 9, and intermittency 3, and Annex C of the standard gives an objective method for tonality that is more defensible than a subjective judgement.

Errors that inflate the background

  • Measuring with the existing plant running, so the source being replaced is inside the background.
  • Taking a daytime background and applying it to night-time operation.
  • Averaging LA90 values arithmetically across a night instead of selecting a representative interval.
  • Measuring against a facade without applying the free field correction.
  • Surveying in wet weather, when road noise is several decibels higher.
  • Positioning the meter on the noisier side of the building from the receptor.

Each of these raises the background, narrows the difference and makes the proposal look better than it is. They are also the first things an environmental health officer looks for, which is why a proposal that fails on a re-survey is worse than one that never claimed compliance.

Illustrative example. A proposed air handling unit serves a new cafe in a suburban parade. The consultant measures a night-time background of 38 decibels at the rear of the parade, with the existing chiller running. Switched off, the background falls to 31. The rating level of the new unit is 40. On the first figure the difference is +2 and the impact reads as low. On the correct figure it is +9 and an acoustic enclosure is needed. The figures are illustrative.

Reporting it so someone else can check

State the instrument type and class, the calibration before and after with the drift recorded, the dates and times, the weather throughout, the positions with photographs and a plan, and the full time history of LA90, LAeq and LAmax.

Then set out a table of derived background levels per reference time interval with the value taken forward and the reasoning for it. Where the assessment is marginal, include the sensitivity test.

This level of detail belongs in a Noise Impact Assessment prepared by a suitably qualified acoustician, and professional review is strongly advised before submission because environmental health officers read these closely. Councils treat a well-evidenced background as the foundation of the whole case. A comparable example on the daylight side is the vertical sky component, where one derived figure carries the same weight in a decision.

Anyone scoping a scheme can check which technical reports apply before commissioning the survey, which usually saves a wasted visit in the wrong season.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which reports your site is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the difference between LA90 and LAeq?

LA90 is the A-weighted level exceeded for 90 per cent of the measurement period, so it describes the quiet floor beneath passing events. LAeq is the energy-average level over the same period and is pulled up by short loud events. BS 4142 uses LA90 for background and LAeq for the specific sound of the source.

How long should a background survey last?

Long enough to show the pattern for the periods the source will operate, which usually means several days covering weekdays and a weekend rather than a single evening. Reference time intervals are one hour during the day and fifteen minutes at night. Atypical conditions such as rain, wet roads, high wind and school holidays should be excluded and the exclusion explained.

Where should the microphone be placed?

At the nearest or most affected noise-sensitive receptor rather than at the site boundary, ideally in free field conditions at least 3.5 metres from any reflecting surface other than the ground, at 1.2 to 1.5 metres height. Where a facade measurement is unavoidable, apply the correction the standard gives and say so in the report.

What difference between rating level and background indicates harm?

The standard treats a difference of around 10 decibels or more as an indication of a significant adverse impact, around 5 decibels as an indication of an adverse impact, and around zero or below as an indication of low impact. Each of those is subject to context, including absolute levels, the character of the area and receptor sensitivity.

Can the existing plant be left running during the survey?

Not if that plant is being replaced or is part of the proposal, because leaving it on puts the source inside the background and narrows the difference artificially. Where it cannot be switched off, measure with and without, report both, and take the figure that represents the situation once the development is in place.

Sources and further reading

bs 4142noiseacousticsla90background soundglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Pre-commencement conditions and the agreement rule

Section 100ZA stops authorities imposing pre-commencement conditions without written agreement. The exception is served notice met with silence, which is why the ten working day window matters.

Read article →
Glossary7 min read

Validation: national and local list requirements compared

The national validation tier comes from statute and applies everywhere. The local tier is whatever your authority has published, and it can be challenged on reasonableness and relevance.

Read article →
Glossary7 min read

Permitted development rights: how they are removed

Permitted development rights can be withdrawn by an article 4 direction, a planning condition or the Order itself. Removal means you apply, not that you cannot build.

Read article →
Glossary6 min read

Zone of theoretical visibility: what a ZTV shows

A zone of theoretical visibility is a geometric screening tool, not evidence of visual harm. Here is what it shows, where it comes from and how inspectors treat it.

Read article →
Glossary7 min read

Betterment and worsement in flood risk terms

Betterment is a reduction in the rate or volume of surface water leaving a site after development. Here is where the requirement comes from and how a discharge rate is actually fixed.

Read article →
Glossary7 min read

Local land charges and a planning search

The local land charges register records section 106 obligations, enforcement notices and tree preservation orders. It records nothing about live investigations or unauthorised works, which is where the risk sits.

Read article →