Noise, Air, Odour and Light

Background sound level determination and the typical period

7 min readBy PlanScope Editorial Team

Two assessors with the same dataset can report background levels 6 dB apart. The difference is which periods they treated as representative, and why.

The background sound level is the reference point the whole BS 4142 assessment hangs on, and it is the number most often chosen rather than measured. Two assessors with the same dataset can report background levels differing by 6 dB simply by taking different views on which periods are representative, and a 6 dB shift moves a rating excess from a marginal indication of adverse impact to a clear one.

The standard describes the background sound level as the LA90 over the reference time interval. What it does not do is tell you which of the many LA90 values in a multi-day dataset to adopt.

What the background level stands for

The LA90 is the level exceeded for 90 per cent of the measurement period. It describes the underlying sound that remains when intermittent events have passed, which is why it is used as the baseline rather than the LAeq.

Reference time intervals are fixed. One hour during the day, taken as 07:00 to 23:00, and 15 minutes at night, taken as 23:00 to 07:00. Every LA90 used in the assessment must be derived over the applicable interval, and a night-time background quoted over an hour is not a BS 4142 night-time background.

The purpose of the figure is comparative. It sets the level against which the rating level of the specific sound is compared, so the question to ask of any candidate value is whether it describes the conditions under which the specific source will be heard.

Choosing a representative period

Representative does not mean average and it does not mean lowest. It means the conditions that will prevail when the source operates.

Start from the operating pattern. A plant running continuously across the whole week needs a background characterising every part of that week, including quiet periods. A delivery operation running between 06:00 and 08:00 on weekdays needs the background during those two hours on weekdays, and the rest of the dataset is context rather than the answer.

Where the source operates at night, the night-time background usually governs, because it is lowest. Where the source operates only during the working day, adopting a night-time background inflates the assessment and will be criticised.

Two further judgements sit inside the choice. Whether weekends differ enough to need separate treatment, which they often do in areas dominated by road traffic or commercial activity. And whether the seasonal position matters, which it does where the background is driven by vegetation, agricultural activity or seasonal traffic.

Day and night reference intervals in practice

Period Interval Common pitfalls
Daytime, 07:00 to 23:00 One hour Using a 15 minute value, or averaging across the whole day
Night-time, 23:00 to 07:00 15 minutes Quoting an hourly value, or adopting the single lowest interval measured
Shoulder periods Applicable interval for the clock time Treating 06:00 to 07:00 as daytime because activity has started

The shoulder periods cause more disputes than the main ones. Early morning deliveries, shift changes and plant start-up frequently fall in the last hour of the night-time period, when the background is at its lowest and the assessment is at its most sensitive. Assessing that activity against a daytime background is the single most common methodological objection an environmental health officer raises, and assessing night deliveries and servicing needs the measurement periods matched to the activity rather than to convenience.

Excluding atypical data

Some exclusions are uncontroversial and some are contested. State every one and the reason, with the excluded intervals visible in the dataset rather than deleted from it.

Generally accepted exclusions:

  • Rainfall, which raises measured levels and affects the microphone
  • Wind speeds above the range stated in the methodology, commonly taken as 5 metres per second at microphone height
  • Periods when the specific source under assessment was operating, since it would otherwise be counted in its own baseline
  • Instrument faults, calibration drift beyond tolerance and obvious anomalies

Contested exclusions include the dawn chorus, individual events such as an aircraft overflight or a passing emergency vehicle, and periods of unusual activity such as roadworks or a local event. The defensible approach is to present the data both with and without the exclusion, so the effect of the judgement is visible. A dataset silently stripped of the periods that would have raised the background is the criticism that does most damage on cross-examination.

Where the specific source cannot be shut down for the survey, measure the background at a location with comparable acoustic character where the source is inaudible, and justify the equivalence explicitly.

How many days of data are enough

There is no fixed number, and the honest answer is that it depends on variability.

A suburban location with a steady road traffic background can be characterised in a few days including one weekend. A rural location with a background driven by wind in trees, agricultural activity and occasional traffic may need a week or more before the pattern stabilises. A location adjacent to an intermittent industrial neighbour may need longer still.

The test to apply is whether adding another day changes the answer. Plot the accumulating dataset, and if the distribution is still moving after five days, keep measuring. That is a defensible basis for stopping, and it is more persuasive than citing a convention.

Unattended monitoring should be supported by at least one attended period, so that somebody has actually listened to the acoustic environment and can describe the sources present. An assessment written entirely from logged data, with no observer notes, misses tonal and impulsive character that changes the rating.

Presenting the statistical spread

Reporting a single figure hides the judgement. Report the distribution and then state the value adopted and why.

A complete presentation includes a time history chart showing LA90 against time for the whole survey, a table of LA90 values by reference interval for each day and night period, a cumulative distribution or histogram of the night-time values, the modal and median values alongside the minimum, and a clear statement of the value adopted for the assessment with the reasoning.

The reasoning sentence is what a reviewer reads first. Something in the form of: the night-time background adopted is the modal 15 minute LA90 across five nights, excluding two intervals affected by rainfall, on the basis that the source operates continuously through the night. That is checkable. An unqualified statement that the background sound level is a given value is not.

Uncertainty deserves a paragraph of its own. BS 4142 expects an estimate covering instrument accuracy, the representativeness of the period and the measurement position, and a competent estimate strengthens rather than weakens the assessment. Councils normally expect a suitably qualified author for acoustic work, and professional review of any draft is strongly advised before it forms part of a Noise Impact Assessment.

Where a low background drives the outcome

In quiet rural locations the night-time background can fall low enough that almost any plant produces a rating level well above it, and the initial estimate of impact points to a significant adverse effect however modest the source.

That is where the context provisions of the standard matter. The assessment does not end with the arithmetic difference. The absolute level of the specific sound, the character of the residual sound, the sensitivity of the receptors and the degree to which the specific sound is masked all form part of the final judgement, and the standard expects them to be addressed.

Design responses follow the same logic. Selecting quieter plant at source, enclosing or attenuating it, relocating it away from the sensitive elevation and controlling its operating hours are all more productive than arguing about the baseline, and what a barrier actually achieves is worth checking before it is relied on in the design.

The last consideration outlives the application. A background that was understated at planning stage tends to resurface as a complaint after occupation, and nuisance allegations after permission is granted are decided under a different test from the one the assessment was written to.

Enter your postcode on PlanScope to see which environmental reports a site is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which reference time intervals apply to the background level?

One hour during the day, taken as 07:00 to 23:00, and 15 minutes at night, taken as 23:00 to 07:00. Every LA90 used must be derived over the applicable interval. A night-time background quoted over a full hour, or a daytime value taken over 15 minutes, is not a BS 4142 background level.

Should the lowest measured background be adopted?

Not automatically. Representative means the conditions that will prevail when the specific source operates, which is rarely the single quietest interval recorded. Adopting the lowest value overstates the rating excess, and adopting an average hides the quiet periods that matter. State the statistic used, such as the modal night-time value, and the reason.

How many days of monitoring are required?

The standard sets no fixed number. A suburban location with steady traffic background may stabilise in a few days including a weekend, while a rural location driven by wind, agriculture and occasional traffic may need a week or more. Plot the accumulating dataset and keep measuring while the distribution is still moving.

Which data can legitimately be excluded?

Rainfall, wind speeds above the range stated in the methodology, periods when the specific source was operating, and instrument faults or calibration drift. Contested exclusions such as the dawn chorus or an aircraft overflight should be presented both ways, so the effect of the judgement is visible to the reviewer.

What happens when the rural night-time background is very low?

Almost any plant produces a rating level well above it, and the initial estimate of impact points to an adverse effect. The context provisions of the standard then matter: absolute levels, the character of the residual sound, receptor sensitivity and masking all form part of the final judgement rather than the arithmetic alone.

Sources and further reading

noisebs 4142acousticsbackground soundmethodologymonitoring

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Noise, Air, Odour and Light

View all →
Noise, Air, Odour and Light7 min read

Statutory nuisance and why permission is no defence

Part III of the Environmental Protection Act 1990 contains no defence of holding planning permission. How abatement notices work, and what best practicable means requires of an operator.

Read article →
Noise, Air, Odour and Light6 min read

When vibration is assessed in a planning application

Human response and building damage thresholds differ by more than an order of magnitude, so the two assessments need separate sections and separate criteria.

Read article →
Noise, Air, Odour and Light7 min read

Predicting construction noise under BS 5228

Four inputs drive a BS 5228 construction noise prediction, and on-time percentages are the one most often got wrong. How the calculation and the criteria work.

Read article →
Noise, Air, Odour and Light7 min read

Delivery and servicing hours conditions on noise grounds

Delivery noise is short, loud events that a BS 4142 rating level dilutes, which is why authorities restrict hours instead. How to assess the events, mitigate them and negotiate the hours.

Read article →
Noise, Air, Odour and Light7 min read

Part O overheating against closed-window noise mitigation

Approved Document O rules out open windows above 40 dB LAeq at night, while acoustic conditions usually cite BS 8233's 30 dB. That 10 dB gap is where most urban infill sits, and it has to be resolved before submission.

Read article →
Noise, Air, Odour and Light7 min read

Lighting design where bats are present

All UK bat species are European protected species, so a lighting layout on a site with bats is an ecological document first. What the plan must show and how the condition should be worded.

Read article →