Daylight, Sunlight and Amenity

Balconies and self-shading in a daylight model

7 min readBy PlanScope Editorial Team

A deep inset balcony can take more daylight from a window than any neighbouring building. Here is how self-shading works, how to model and report it honestly, and which design changes actually recover the loss.

An inset balcony sitting above a window will take more daylight off that window than most neighbouring buildings ever could. A 2 metre deep recess above a living room window can halve the vertical sky component at that window before any external obstruction is considered, and on a single aspect north-facing flat it can take the room below any sensible target. This is self-shading, and it is caused by your own design rather than by anything on the other side of the boundary.

The reason it matters in a planning submission is that a case officer reading a daylight and sunlight assessment sees a list of rooms that fail. Unless the report separates the loss caused by the balcony from the loss caused by the surroundings, the scheme looks worse than it is and the mitigation discussion heads in the wrong direction.

How a balcony reduces sky visibility

The vertical sky component measures the proportion of sky visible at the centre of a window on its outside plane, against an unobstructed vertical surface. Anything that blocks the upper part of that hemisphere reduces it, and the balcony slab directly above the window blocks the part of the sky that contributes most.

Daylight distribution, the no sky line, behaves differently. It maps the area of the working plane inside the room that can see some patch of sky, so the deeper the overhang the further the no sky line retreats towards the window, leaving the back of the room in permanent gloom even on a bright day.

Sunlight is affected too. Annual probable sunlight hours at a window under a balcony drop sharply, and the winter proportion drops faster still, because low winter sun arrives at exactly the angle the slab intercepts.

Inset against projecting balconies

A projecting balcony cantilevers out from the facade, so the slab above it is also projecting and the window beneath sits broadly under open sky. Losses are real but modest.

An inset balcony is cut into the building envelope. The window serving the room behind now sits at the back of a recess with walls on two or three sides and a soffit above. That geometry is the problem, and the deeper and narrower the recess, the worse it gets.

Balcony type Typical effect on the room behind
Projecting, open balustrade Modest reduction, mainly to sunlight in winter
Inset to 1.5 m with two side walls Noticeable reduction in sky component and daylight distribution
Inset to 2 m or more, narrow opening Severe, often the dominant cause of a room failing
Wintergarden with glazed enclosure Depends entirely on the glass specification modelled

Architects reach for inset balconies because they keep the elevation flat, they are easier to detail for thermal bridging and water, and they do not project over a boundary. Those are good reasons. They are just expensive in daylight terms, and the cost should be known at concept stage rather than discovered at the planning submission.

Modelling the overhang correctly

Three errors recur.

The first is omitting the balcony from the model altogether, usually because it was drawn as a line on the elevation rather than as geometry. The results then look fine and fall apart when the authority's consultant rebuilds the model.

The second is treating a glazed balustrade as if it were not there. A clear glass balustrade transmits most of the light reaching it, but it is not invisible, and the honest approach is either to model its transmittance explicitly or to model it as opaque and say so. Picking whichever assumption gives the better number, without stating it, is the quickest way to lose an officer's confidence.

The third is inconsistent treatment between the existing and proposed cases when assessing effects on neighbours. If the neighbouring window has its own balcony above it, that balcony exists in both scenarios and belongs in both models.

BRE 209 anticipates the self-shading problem directly. Where a room's shortfall is caused by its own balcony, the recommended approach is to report the result twice, once as designed and once with the balcony removed, so that the contribution of the external obstruction can be seen on its own. That is not a trick to improve the numbers. It is the only way to attribute cause, and officers who read these reports regularly expect to see it.

Soffit and wall reflectance

Light reaching a recessed window has usually bounced off the balcony soffit, the side walls of the recess and the floor of the balcony. Surface reflectance therefore does real work, and a dark soffit in exposed concrete or a dark grey render loses light that a pale finish would return.

Standard internal reflectance assumptions used in daylight modelling are conservative, and external surfaces are often modelled at a low default value. If you intend to rely on a light balcony soffit, model it at the actual specified reflectance, state the value, and then secure the finish by condition. A reflectance assumption that is not in the materials schedule will be treated as optimistic.

Design changes that recover daylight

The fixes are architectural rather than analytical. But they only work if they are tested before the elevations are signed off, and they fall in roughly this order of effectiveness.

  1. Make the balcony projecting instead of inset, accepting the detailing and boundary consequences.
  2. Reduce the depth of the recess, since the relationship between depth and loss is steeper than most designers expect.
  3. Move the balcony so it sits in front of a secondary window, a circulation space or a kitchen rather than the main living room window.
  4. Raise the window head towards the soffit, or push the head above the soffit line where the floor zone allows.
  5. Widen the balcony opening and remove one of the side walls, which helps daylight distribution more than it helps the sky component.
  6. Specify a pale soffit and pale recess walls, and secure them.
  7. Use a glazed balustrade with a stated transmittance rather than a solid parapet.

Illustrative example, not a real scheme: a 1.8 metre deep inset balcony with walls on both sides, serving a single aspect living room on the second floor of a six storey block, is remodelled at 1.2 metres deep with one side opened to the facade and the soffit specified pale. The daylight distribution in the room behind improves enough to bring it back within the target, with no change to the building footprint and a loss of about 1.4 square metres of private amenity space per flat. Whether that trade is worth making is a judgement about the scheme, not about the model.

Where the flats are single aspect to begin with, the balcony is often the final straw rather than the only problem, and the wider set of remedies in daylight to single aspect flats is worth reading alongside this.

Reporting self-shaded rooms

Say plainly which rooms are self-shaded, give both sets of figures, and explain the design reason for the balcony. Do not bury the balcony rooms in an appendix table of 400 windows.

A short section that lists the self-shaded rooms, states the depth and configuration of each balcony, gives the result with and without it, and sets out which of the mitigation options were tested and why they were or were not adopted will answer most of what an officer wants to know. Where a local plan amenity policy sets its own targets, address those directly as well, because policies vary in how they apply the BRE guidance and some set absolute floors rather than relative tests, a point covered in how local plan amenity policies use BRE 209.

The same discipline applies to the external spaces. Sun on the balcony itself, and on any communal amenity area below, belongs in the overshadowing study rather than being folded into the window results.

And if the answer is that the scheme accepts some self-shading because the balconies are worth more to residents than the marginal daylight, say that. An honest trade-off argued in the daylight and sunlight assessment carries further than a set of numbers that quietly omitted the geometry causing them.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. Daylight and sunlight modelling is specialist work and councils usually expect a suitably qualified author, so professional review is strongly advised.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is self-shading in a daylight assessment?

Self-shading is the reduction in daylight to a window caused by the building's own geometry rather than by an external obstruction. The commonest cause is an inset balcony whose slab and side walls block the upper sky from the window beneath. It affects the vertical sky component, daylight distribution and annual probable sunlight hours together.

Should balconies be removed from the model?

Not removed, but reported both ways. BRE 209 anticipates this situation and suggests presenting the result as designed and again with the balcony removed, so the contribution of the external obstruction can be separated from the self-shading. Reporting only the balcony-free figure, without saying so, misleads the authority and usually gets caught.

Do projecting balconies cause less daylight loss than inset ones?

Generally yes. A projecting balcony leaves the window beneath under broadly open sky, so losses are modest and concentrated in winter sunlight. An inset balcony puts the window at the back of a recess with a soffit above and walls at the sides, which cuts both the sky component and the depth of the daylit zone inside the room.

Does a glazed balustrade help?

It helps compared with a solid parapet, because clear glass transmits most of the light reaching it. The modelling has to be honest about it, either by applying the actual transmittance or by modelling the balustrade as opaque and stating that the result is conservative. Selecting whichever assumption flatters the scheme without disclosure undermines the whole report.

Can a light coloured soffit be relied on?

Only if it is modelled at the specified reflectance, the value is stated in the report, and the finish is secured by planning condition. Light recess walls and soffits return useful light to a recessed window. An assumption that does not appear in the materials schedule will be treated as optimistic by the authority's reviewer.

Sources and further reading

daylightbalconiesbre 209residential designamenitymodelling

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Daylight, Sunlight and Amenity

View all →
Daylight, Sunlight and Amenity7 min read

Roof terraces, overlooking and privacy screens

A roof terrace lets the viewer move, which is why separation distance policies written for windows do not resolve it. Screen specification, set-backs and conditions.

Read article →
Daylight, Sunlight and Amenity7 min read

Reading a daylight and sunlight report as an objector

A daylight and sunlight report is easier to check than it looks. Find the baseline, check which windows were assessed, test the room use assumptions, and build an objection around what is missing.

Read article →
Daylight, Sunlight and Amenity7 min read

Tree shading and the balance with tree retention

A protected tree that darkens a kitchen is a planning problem with a narrow set of answers. Crown reduction usually wins over felling, and evergreen hedges are governed by a different statute altogether.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight to commercial and retail frontages

Shops are assumed to be artificially lit, so daylight loss to a frontage attracts little planning weight. Offices and workrooms are different, and rights of light run on a track of their own.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight in classrooms and school extensions

A deep classroom with glazing on one wall gives the back row a fraction of the light and the front row the glare. Uniformity matters as much as quantity.

Read article →
Daylight, Sunlight and Amenity7 min read

Average daylight factor against climate-based modelling

ADF gives one percentage per room under a uniform overcast sky. Climate-based modelling simulates every daylight hour of the year. Policy decides which you need.

Read article →