Commercial Occupiers

Betting shops, vape shops and sui generis retail

7 min readBy PlanScope Editorial Team

Betting offices, pay day loan shops and hot food takeaways sit outside Class E with no route back in. What that means for lettings, frontage policy and conditions.

The betting shop use class answer is that there is no class. Betting offices are sui generis, meaning they sit in a class of their own, so every move into or out of a betting shop needs planning permission. That single fact drives the whole letting strategy for a unit in a secondary parade, because a landlord with a sui generis tenant has no permitted flexibility to fall back on when the lease ends.

The 2020 reforms made this sharper rather than simpler. Class E swallowed most shops, services and offices, and left a short list of uses outside it with no route back in.

Which retail uses sit outside Class E

Class E covers shops, food and drink consumed on the premises, financial and professional services, indoor fitness, medical and health services, creches and offices. Movement between those limbs is not development. What matters for a landlord is the list that did not get in.

Sui generis uses that regularly occupy shop units include betting offices, pay day loan shops, hot food takeaways, pubs and drinking establishments, laundrettes, amusement arcades and adult gaming centres, cinemas, live music venues, nightclubs, petrol filling stations and premises selling or displaying motor vehicles.

Each of those requires an application for any change of use, in either direction. A hot food takeaway cannot become a cafe without permission, even though a cafe is Class E, and a Class E unit cannot become a betting office without permission either. Our note on adult gaming centres and amusement arcades covers the gambling end of that list, and micro-pubs in former shop units covers the drinking establishment route.

The asymmetry is what catches investors. Buying a unit with a sui generis consent gives you a valuable use and no fallback. Buying a Class E unit gives you flexibility within Class E and no ability to reach the sui generis uses that often pay the highest rent.

Betting offices and pay day loan shops

Betting offices and pay day loan shops were taken out of the former Class A2 and made sui generis by amendment in 2015, precisely so that councils could control their spread through the planning system.

There is a reason planning does the heavy lifting here. Under the Gambling Act 2005 the licensing authority operates with a statutory duty to aim to permit, subject to the licensing objectives, so a premises licence is harder to refuse than a planning permission. Where a council wants to resist a concentration of betting shops in a parade, the planning application is where it happens.

Expect the assessment to turn on frontage policy, the character of the parade and the cumulative position rather than on gambling harm in the abstract. Committee reports on these applications read very differently from the licensing paperwork on the same premises, and both sets of documents end up in the file.

One practical point for landlords. Where a unit has an unimplemented betting office permission, check whether it has been kept alive. A lapsed permission on a unit whose value was underwritten by that consent is a material loss, and the lapse is not always obvious from the title or the marketing particulars.

Vape and shisha premises

Vape retail is more straightforward than it looks. A shop selling vaping products as goods, over a counter, to customers who leave with them, is retail and falls within Class E(a). No application is needed to move a Class E unit to that use.

The complication arrives with consumption on the premises. A lounge where customers sit and vape, with seating, service and a dwell time, has moved away from retail. Where food and drink are served for consumption on the premises it may sit within Class E(b), and where the dominant activity is smoking or vaping on the premises many authorities treat it as sui generis. Shisha premises are usually assessed on that basis, and the outdoor covered areas they typically need raise smoke-free legislation and neighbour amenity questions at the same time.

Two things decide the classification in practice. What proportion of the floor area is given over to seating rather than display and sale, and whether the business model depends on customers staying. A council looking at a unit with fixed seating for 30 people and a small counter will not accept that it is a shop.

If you are letting a unit for this use, get the classification confirmed before completion. A certificate of lawfulness of proposed use is the formal route where the answer carries real money.

Cumulative impact and frontage policies

This is where most refusals come from, and the policy tests are local rather than national.

Policy type What it controls Evidence usually required
Primary shopping frontage protection Proportion of non-retail units within a defined frontage Survey of existing uses along the frontage, with unit counts
Concentration or cluster policy Number of the same use within a stated distance or number of units Plan showing existing premises of that use with distances
Proximity to sensitive uses Distance from schools, youth facilities or treatment centres Measured distances on a plan
Vitality and viability Effect on the health of the centre Vacancy rates and the marketing history of the unit

Read the adopted policy and count the units yourself before you apply. These policies are arithmetic, and a policy permitting no more than a stated proportion of non-Class E frontage either works or does not. Applying in the face of a numerical policy without any other argument wastes a fee.

Where the policy has a threshold you fail, the case has to be built on something else: the length of the vacancy, the marketing evidence, the condition of the unit, the absence of viable retail interest, and the contribution the proposed use makes to footfall.

Shutters, signage and window displays

Solid external roller shutters need planning permission as a material alteration to the external appearance of the building, and they are refused routinely in conservation areas and on active frontages. Open mesh or perforated shutters behind the glazing line are the usual compromise, and internal grilles avoid the issue altogether.

Signage falls under the Town and Country Planning (Control of Advertisements) (England) Regulations 2007. A fascia sign within the standard conditions may benefit from deemed consent, while illuminated signs, projecting signs and anything on a listed building or in a conservation area generally need express consent. Internally lit box signs attract objections on their own.

Window treatment is the sleeper issue for sui generis retail. Betting offices, gaming premises and some vape shops obscure their glazing for commercial and regulatory reasons, and councils respond with conditions requiring a stated proportion of the shopfront to remain clear and unobscured, with no vinyl film or posters above a set height. Read any such condition before signing a lease, because it may be incompatible with the tenant's own operating standards.

Hours and management conditions

Conditions are where the permission gets its teeth. Expect some combination of opening hours, a limit on deliveries and collections, no external loudspeakers, a litter management obligation, a requirement to keep the frontage clear of A-boards, and in some cases a management plan submitted for approval before opening.

Hours are negotiable at application stage and painful to change afterwards. A section 73 application to vary an hours condition is a fresh assessment of that condition, and an authority that was reluctant first time round will be no keener second time.

Where the use generates cooking odours or plant noise, the conditions get more technical. A Noise Impact Assessment for plant, and extraction details where food is prepared, are the usual requirements, and councils generally expect a suitably qualified author with professional review.

Evidence for a change of use application

Keep the pack proportionate to the unit. For a single shop unit in a parade, what actually moves the decision is:

  1. A frontage survey showing every unit in the defined frontage with its current use and class, dated and photographed.
  2. Marketing evidence for the unit, with the agent's particulars, the asking rent, the period marketed and a record of enquiries.
  3. A plan showing existing premises of the same use within the distance the policy specifies.
  4. Confirmation of the existing lawful use, with the planning history and any relevant certificate.
  5. Hours, staffing and management proposals, offered rather than waited for.

The policy case belongs in a Planning Statement that engages with the numerical policy directly instead of around it. Larger retail proposals bring in the separate question of whether a Retail Impact Assessment is needed, which is keyed to the national floorspace threshold or a lower local one, and that rarely bites on a single shop unit.

This is general guidance rather than legal advice. Use classification and local frontage policies vary, so check the position with your local planning authority or a qualified professional before relying on it.

Working out which documents a change of use application needs? Enter your postcode on PlanScope to see the likely list. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What use class is a betting shop?

None. Betting offices are sui generis, meaning they sit outside the use classes in a class of their own. They were taken out of the former Class A2 by amendment in 2015. Every change of use into or out of a betting office needs planning permission, and there is no permitted flexibility to fall back on.

Do I need planning permission for a vape shop?

Usually not if it really is a shop. Selling vaping products as goods over a counter is retail within Class E(a), so moving a Class E unit to that use is not development. Permission is likely to be needed where customers sit and vape on the premises, because the dominant activity has moved away from retail.

Which former shop uses are sui generis after the 2020 reforms?

Hot food takeaways, pubs and drinking establishments, cinemas, live music venues, nightclubs and amusement arcades were left outside Class E, alongside betting offices and pay day loan shops that were already sui generis. Laundrettes, petrol filling stations and premises selling or displaying motor vehicles are also outside it.

Can a council refuse a betting shop because there are already several nearby?

Yes, where the adopted local plan contains a concentration or frontage policy that the proposal fails. These policies are arithmetic, so count the units within the defined frontage or distance before applying. Planning is often the main control, because the Gambling Act 2005 licensing regime operates with a duty to aim to permit.

Will the council control my window display?

Frequently, through a condition requiring a stated proportion of the shopfront to remain clear and unobscured, with limits on vinyl film and posters. Solid external roller shutters also need permission and are commonly refused on active frontages. Check any such condition against the tenant's operating standards before signing a lease.

Sources and further reading

sui generisuse classesbetting shopvape shopchange of useretail frontage

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Hours of opening conditions and how to negotiate them

An hours condition is easier to shape before it is imposed than to vary afterwards. Here is the evidence that supports longer hours, how to split customer and delivery restrictions, and what varying an existing condition involves.

Read article →
Commercial Occupiers7 min read

Planning a pharmacy alongside a medical practice

Retail and health services both sit inside Class E, so a pharmacy opening in a shop unit or alongside a surgery usually needs no change of use permission. The consents that do bite are parking, hours, extraction and signage.

Read article →
Commercial Occupiers7 min read

Change of use to a light industrial unit near homes

Light industry sits inside Class E only where the process could be carried out in a residential area without detriment to amenity. That wording, not the machinery, decides whether your unit needs permission.

Read article →
Commercial Occupiers6 min read

Change of use to an amusement arcade or betting shop

Amusement arcades and betting offices sit outside every use class, so a change of use always needs planning permission. The decision usually turns on frontage policy, clustering and noise rather than on the gambling itself.

Read article →
Commercial Occupiers7 min read

Planning a barber, nail bar or beauty salon

Most personal care uses now sit inside Class E, so the use rarely needs permission. Extraction, waste and registration are where the work is.

Read article →
Commercial Occupiers7 min read

Mobile catering on private land and the 28-day rule

Part 4 Class B allows temporary use of land for 28 days a year. It does not apply inside the curtilage of a building, which rules out most car parks.

Read article →