Glossary

Breach of condition notice: how it works and why it bites

6 min readBy PlanScope Editorial Team

Section 187A notices require compliance with a planning condition and carry no appeal to the Planning Inspectorate. The compliance period, the statutory defences and the routes that remain open.

A breach of condition notice is the enforcement tool with no appeal. Serve an enforcement notice and the recipient can appeal to the Planning Inspectorate on seven statutory grounds, which suspends the notice while the appeal runs. Serve a breach of condition notice under section 187A of the Town and Country Planning Act 1990 and there is no appeal at all. The compliance period runs, and when it expires the breach becomes a criminal offence.

That is why councils reach for it, and why it lands badly on a live site.

What the notice does

Section 187A allows the local planning authority to serve a notice where a planning condition has not been complied with. The notice requires compliance with the condition, either by taking specified steps or by ceasing a specified activity.

It does not require the development to be removed. The condition is the target, so a notice about a construction hours condition requires the hours to be observed, and a notice about a landscaping condition requires the landscaping to be carried out. Where the authority wants the building gone, it needs an enforcement notice instead.

Both can be served over the same development. They are not alternatives, and authorities sometimes use a breach of condition notice for the immediate nuisance and an enforcement notice for the underlying development.

Who can be served

The notice may be served on the person carrying out the development or on any person having control of the land. In practice that means the developer, the contractor, the landowner or an occupier, and more than one person can be served over the same breach.

For a site that has changed hands, this is the point to watch. A purchaser who takes on land where a condition has been breached can find themselves served, because control of the land rather than authorship of the breach is the test. Condition compliance belongs in the due diligence alongside the search of the local land charges register.

The compliance period

The notice specifies a period for compliance, which cannot be less than 28 days from service. The authority can allow longer and often does where the steps take time, such as a landscaping scheme that has to wait for a planting season.

Nothing about the period is negotiable once the notice is served, though authorities in practice will discuss an extension where the recipient is plainly working towards compliance. Get any such agreement in writing. An email from the enforcement officer confirming a revised date is evidence if a prosecution follows.

Why there is no appeal

The policy reason is that the condition itself was appealable. When permission was granted subject to conditions, the applicant could have appealed against those conditions within the statutory period. Parliament took the view that a second bite at the same question, years later and after the development had been carried out, was unnecessary.

Three routes remain open, and none of them stops the clock on their own:

  1. Apply under section 73 for permission to develop without complying with the condition, or subject to a different condition.
  2. Apply under section 96A for a non-material amendment, where the change is minor in substance.
  3. Apply for judicial review of the decision to serve the notice, which is discretionary, expensive and constrained by short time limits.

The first is the usual answer. A section 73 application reopens the condition rather than the permission, and if it succeeds the condition the notice relies on has gone. Where the change really is minor, the non-material amendment route is quicker, though its limits are narrow and an authority will refuse to use it for anything that alters what was assessed. Making that application does not suspend the notice, so the two run in parallel and the prosecution risk continues in the meantime.

Defences in the magistrates court

Failure to comply with the notice after the compliance period is a summary offence prosecuted in the magistrates court, and the fine is set by the court. Each continuing period of non-compliance can found a further prosecution.

The Act provides defences. A person charged as the person carrying out the development can show that they took all reasonable measures to secure compliance with the condition. A person charged as the person having control of the land can show that they no longer had control at the relevant time, and that they took all reasonable measures to secure compliance.

Reasonable measures is a factual question and the bar is real. Instructing a contractor to comply and then not checking is unlikely to be enough. Keeping dated records of what was instructed, what was checked and what was found is the difference between a defence and an assertion.

The court has limited scope to look behind the condition itself. Arguments that the condition was unreasonable, or that the officer should have used a different tool, belong in a section 73 application or a judicial review rather than in the criminal proceedings.

Time limits on service

Enforcement action has to be taken while the breach remains vulnerable. The Levelling-up and Regeneration Act 2023 moved the enforcement time limit in England to ten years for breaches occurring after the date that change took effect, replacing the previous four year limit for certain operational development and changes of use to a single dwelling. Older breaches keep the limits that applied when they became immune, so check the date the change took effect and the date of the breach rather than applying a single rule.

For conditions, the clock generally runs from the breach rather than from the grant of permission, and a continuing breach is a continuing exposure.

Responding without making it worse

Take these steps in order:

  • Read the notice and identify exactly which condition it cites and which steps it requires.
  • Diarise the compliance date and work backwards from it.
  • Check the decision notice to confirm the condition is on the permission as granted and has not been varied or discharged already.
  • Check whether the condition has in fact been discharged, including by the deemed discharge route, which applies to some conditions where the authority failed to determine an application in time.
  • Comply where you can, in writing, and tell the enforcement officer what you have done.
  • Where compliance is impossible, apply under section 73 immediately and say so to the officer.

Silence is the worst response. Enforcement officers have discretion over prosecution, and a recipient who engages, complies with what they can and evidences the rest is in a different position from one who does nothing for six weeks.

Conditions are easier to manage at the application stage than after service. Setting out clearly what each condition will require, and why, in the planning statement tends to produce conditions that are precise enough to discharge.

To see which supporting documents a fresh application is likely to need, browse the report types on PlanScope.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Can I appeal a breach of condition notice?

No. Section 187A provides no right of appeal to the Planning Inspectorate, on the basis that the condition itself could have been appealed when permission was granted. The remaining routes are a section 73 application to vary or remove the condition, a section 96A non-material amendment where the change is minor, or judicial review.

How long is the compliance period?

The notice must allow at least 28 days from service, and the authority can allow longer where the steps take time, such as planting that has to wait for a season. The period is fixed once the notice is served. Any agreed extension should be confirmed in writing by the enforcement officer.

Who can be served with a breach of condition notice?

The person carrying out the development or any person having control of the land, and more than one person can be served over the same breach. A purchaser who takes on a site where a condition was breached can be served, because control of the land rather than responsibility for the breach is the test.

What happens if the notice is not complied with?

Non-compliance after the period expires is a summary offence prosecuted in the magistrates court, with the fine set by the court, and continuing non-compliance can found further prosecutions. Statutory defences exist for a person who took all reasonable measures to secure compliance, or who no longer had control of the land.

Does applying under section 73 suspend the notice?

It does not. The notice remains in force and the compliance period continues to run while the application is determined, so the criminal exposure continues in the meantime. Apply immediately, tell the enforcement officer what you have applied for, and comply with as much of the notice as you can in the interim.

Sources and further reading

enforcementplanning conditionssection 187abreach of condition noticesection 73

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Severance: when one permission cannot be built in parts

A planning permission is normally a permission for the whole development, not a set of independent parts. Here is what severance means, where the rule comes from, and how to check the position for a part-built site.

Read article →
Glossary8 min read

Enabling development: the heritage exception explained

Enabling development permits development contrary to policy because it funds the repair and future of a heritage asset. The tests are demanding, and the deficit has to come from the building rather than the owner.

Read article →
Glossary7 min read

Pre-commencement conditions and the agreement rule

Section 100ZA stops authorities imposing pre-commencement conditions without written agreement. The exception is served notice met with silence, which is why the ten working day window matters.

Read article →
Glossary7 min read

Validation: national and local list requirements compared

The national validation tier comes from statute and applies everywhere. The local tier is whatever your authority has published, and it can be challenged on reasonableness and relevance.

Read article →
Glossary7 min read

Permitted development rights: how they are removed

Permitted development rights can be withdrawn by an article 4 direction, a planning condition or the Order itself. Removal means you apply, not that you cannot build.

Read article →
Glossary6 min read

Zone of theoretical visibility: what a ZTV shows

A zone of theoretical visibility is a geometric screening tool, not evidence of visual harm. Here is what it shows, where it comes from and how inspectors treat it.

Read article →