Glossary

Breach of condition notice: the no-appeal route

8 min readBy PlanScope Editorial Team

A breach of condition notice is served under section 187A of the Town and Country Planning Act 1990 and cannot be appealed to the Planning Inspectorate. Here is what it binds you to, the two statutory defences, and the routes that actually work.

A breach of condition notice is the enforcement tool a council reaches for when planning permission exists but a condition attached to it has not been complied with. It is served under section 187A of the Town and Country Planning Act 1990, it gives a compliance period of at least 28 days, and there is no right of appeal to the Planning Inspectorate against it. That last point catches most landlords and small developers off guard. An enforcement notice can be appealed, and lodging the appeal suspends it. A breach of condition notice keeps running while you argue.

So if one lands on your doormat, the clock matters more than the argument.

What the notice does and who it binds

Section 187A lets the local planning authority serve the notice on any person who is carrying out or has carried out the development, and on any person having control of the land. For a converted house let to tenants, that usually means the freeholder and often the managing agent as well. Both can be served. The notice must identify the condition that has been breached and specify the steps to be taken, or the activities to cease, to secure compliance.

It can be served whether or not an enforcement notice has already been issued for the same matter. Councils sometimes run both in parallel: the enforcement notice deals with the unauthorised building work, the breach of condition notice deals with the condition on the earlier permission that was ignored.

Typical triggers on small residential schemes are familiar ones. A condition requiring bin and cycle storage to be provided before first occupation, and it never was. A landscaping condition with a planting season deadline that passed two winters ago. An occupancy restriction on an annexe. A condition limiting the number of bedrooms or restricting use to a named class.

Why there is no appeal, and what you have instead

Parliament designed section 187A as a summary route. The condition was imposed on a permission you accepted, and the merits of that condition were open to challenge at the time, either by not implementing the permission or by appealing the condition under section 78. Once the permission has been implemented, the statutory position is that the condition binds the land and the council should not have to re-argue it.

The practical consequence is that the only direct challenge is judicial review in the Administrative Court, on public law grounds: the notice is defective on its face, the condition does not mean what the council says it means, the authority acted for an improper purpose. Judicial review is expensive and the time limit is short. Most recipients are better served by complying and then applying to change the condition properly.

There is one route that is often overlooked. If you believe the condition has in fact been complied with, or that the condition does not apply to what you are doing, you can apply for a lawful development certificate under section 191 or 192. A certificate is a formal determination rather than an opinion, and it gives you something to put in front of the enforcement officer.

The compliance period and the offence

The compliance period runs from service and cannot be less than 28 days. Councils often give longer where the steps take time, for example where a condition requires a scheme to be submitted and approved before works continue. If the period expires and the condition is still not complied with, the person responsible commits a summary offence. Section 187A sets the maximum fine by reference to the standard scale, and the level has been amended more than once, so check the current text on legislation.gov.uk before advising anyone on exposure.

The offence is not a one-off. Where the breach continues, the authority can prosecute again on fresh facts, which is why councils treat the notice as a ratchet rather than a single shot. A council can also withdraw the notice by written notice, and withdrawal does not stop it serving another one later.

One quiet risk sits underneath all of this. A live breach of condition notice, or an unresolved prosecution, will show up on local authority searches and can stall a sale or a refinance long after the planning issue itself is dull.

Defences that actually work

Section 187A provides two defences, and they are narrower than most people expect.

  1. That the defendant took all reasonable measures to secure compliance with the condition. This is a defence about effort and evidence, not intention. Instructions to a contractor, a paid order for the bin store, correspondence chasing a landscaping firm and dated photographs all help. A statement that you meant to get round to it does not.
  2. For a person served as someone having control of the land, that they no longer had control of the land at the relevant time. Dated completion statements or a signed surrender of a lease support this. An informal arrangement with a relative does not.

Neither defence lets you reopen the planning merits of the condition. A magistrates court hearing a section 187A prosecution is not the place to explain that the parking condition was unreasonable.

Choosing between a breach of condition notice and an enforcement notice

The two instruments do different jobs, and the choice tells you something about how the council sees the case.

Breach of condition notice Enforcement notice
Statutory basis Section 187A, TCPA 1990 Sections 172 to 173, TCPA 1990
What it addresses Non-compliance with a condition on an extant permission Development carried out without permission, or a breach
Appeal to the Inspectorate None Yes, under section 174, on stated grounds
Effect of an appeal Not applicable Notice suspended until the appeal is decided
Minimum period 28 days for compliance 28 days before it takes effect
Failure to comply Summary offence Offence, with unlimited fine on indictment

A council that wants a quick, unappealable result on a clear-cut condition breach uses section 187A. A council that wants to remove a building, or that is unsure whether a permission was validly implemented at all, uses an enforcement notice because it needs the wider powers and can live with an appeal.

Time limits sit behind both. The Levelling-up and Regeneration Act 2023 brought the immunity periods in England into line at ten years for breaches occurring on or after the date those provisions took effect, replacing the old four-year rule for operational development and change of use to a single dwellinghouse. Older breaches keep the rules that applied when they occurred, so the date of the breach is the first thing to pin down. Verify the position on when that took effect on legislation.gov.uk before relying on it.

Applying to change the condition rather than fight it

If the condition is truly unworkable, the honest answer is to apply to vary or remove it under section 73 rather than to ignore it. A section 73 application is determined as a fresh application limited to the condition in question, and the authority can impose different conditions or refuse. It carries a fee and a determination period, and it can be extended by agreement in the same way any other application can, which is worth knowing when a compliance period is running in parallel. The extension of time agreement does not pause the breach of condition notice, though. Only the council agreeing to hold off does that, and you should get that in writing.

Where the change is trivial, a wording tweak or a minor dimension, the section 96A non-material amendment power is faster and costs less. It cannot be used to remove a condition that does real work, and officers refuse over-ambitious applications routinely.

Applying does not suspend the notice. Say so to your client in writing before they assume otherwise.

An illustrative example

Take a two-storey rear extension approved with a condition requiring obscure glazing to a first-floor flank window before first occupation. The owner glazed it clear, the neighbour complained, and a breach of condition notice arrived with a 28-day period. The owner has three sensible options: fit obscure glazing and photograph it dated, apply under section 73 to substitute a condition allowing clear glazing above a set cill height with supporting overlooking analysis, or do both and treat the section 73 as the long-term fix. Fighting the notice itself gets nowhere. This example is illustrative.

What to do in the first week

Read the notice against the decision notice it refers to and check that the condition number and wording match. Mistakes happen, and a notice that cites a condition from a superseded permission is vulnerable. Diary the compliance date immediately. Work out whether compliance is physically possible inside the period, and if it is not, write to the case officer with a programme and ask for a longer period before the deadline rather than after it.

Then decide which track you are on: comply, certify, or apply. Most cases resolve on the first. Where the underlying problem is that the original submission never dealt properly with amenity, drainage or parking, the evidence you should have filed first time is usually what unlocks a section 73 now, and the report types grouped by category are a reasonable place to work out which evidence that is.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Enter your postcode on PlanScope to see which reports your site needs.

Frequently asked questions

Can I appeal a breach of condition notice?

No. Section 187A of the Town and Country Planning Act 1990 provides no right of appeal to the Planning Inspectorate, unlike an enforcement notice under section 174. The only direct challenge is judicial review in the Administrative Court on public law grounds, which is costly and time limited. In practice most recipients comply and then apply under section 73 to vary the condition properly.

How long do I have to comply with a breach of condition notice?

The compliance period cannot be less than 28 days from service, and councils often allow longer where the steps take real time, such as a planting season or an approval of details. The period runs whether or not you have applied to change the condition. If you need more time, ask the case officer in writing before the deadline passes, not afterwards.

What happens if I ignore the notice?

Once the compliance period expires and the condition is still breached, the person responsible commits a summary offence. Section 187A sets the maximum fine by reference to the standard scale, so check the current text on legislation.gov.uk. Because the breach continues, the council can prosecute again on fresh facts rather than being limited to a single conviction.

Who can a breach of condition notice be served on?

It can be served on any person carrying out or who has carried out the development, and on any person having control of the land. For a let property that often means the freeholder and the managing agent together. Being served as a person in control gives you a defence if you can show, with dated evidence, that you no longer had control when the breach occurred.

Does applying under section 73 stop the notice?

No. A section 73 application to vary or remove the condition is determined as a fresh application limited to that condition, and it has no suspensive effect on the notice. The compliance period keeps running. Only a written agreement from the authority to hold off enforcement gives you breathing space, and you should ask for that explicitly.

What if I think the condition has already been complied with?

Apply for a lawful development certificate under section 191 or section 192 of the Town and Country Planning Act 1990. A certificate is a formal determination rather than an officer's opinion, and it gives you a document to put in front of the enforcement team. It is also the only formal way to confirm that what you are doing is lawful.

Sources and further reading

enforcementconditionsbreach of condition noticesection 187asection 73planning law

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Severance: when one permission cannot be built in parts

A planning permission is normally a permission for the whole development, not a set of independent parts. Here is what severance means, where the rule comes from, and how to check the position for a part-built site.

Read article →
Glossary8 min read

Enabling development: the heritage exception explained

Enabling development permits development contrary to policy because it funds the repair and future of a heritage asset. The tests are demanding, and the deficit has to come from the building rather than the owner.

Read article →
Glossary7 min read

Pre-commencement conditions and the agreement rule

Section 100ZA stops authorities imposing pre-commencement conditions without written agreement. The exception is served notice met with silence, which is why the ten working day window matters.

Read article →
Glossary7 min read

Validation: national and local list requirements compared

The national validation tier comes from statute and applies everywhere. The local tier is whatever your authority has published, and it can be challenged on reasonableness and relevance.

Read article →
Glossary7 min read

Permitted development rights: how they are removed

Permitted development rights can be withdrawn by an article 4 direction, a planning condition or the Order itself. Removal means you apply, not that you cannot build.

Read article →
Glossary6 min read

Zone of theoretical visibility: what a ZTV shows

A zone of theoretical visibility is a geometric screening tool, not evidence of visual harm. Here is what it shows, where it comes from and how inspectors treat it.

Read article →