Planning Law Updates

Brownfield land registers and what being on one means

6 min readBy PlanScope Editorial Team

Every English council keeps a brownfield land register. A Part 1 entry is evidence; a Part 2 entry is a consent that settles location, use and amount for five years.

A brownfield land register is a public list, kept by every local planning authority in England, of previously developed land the authority considers suitable, available and achievable for housing. Being on Part 1 of that register carries no planning permission at all. Being on Part 2 does: an entry in Part 2 grants permission in principle for housing development on that site, fixing location, land use and the amount of development, and leaving everything else to a later technical details consent.

Most registers contain only Part 1 entries. That gap between the two parts is where the value, and the confusion, sits.

What a register is and who keeps it

The Town and Country Planning (Brownfield Land Register) Regulations 2017 require each local planning authority in England to prepare and maintain a register and to publish it, reviewing it at least once a year. The power comes from the Housing and Planning Act 2016.

To be entered, land must be previously developed, of at least 0.25 hectares or capable of supporting at least five dwellings, suitable for residential development, available for it, and achievable, meaning development is likely to take place within fifteen years. Authorities apply those tests themselves, drawing on their strategic housing land availability assessment, planning history and site submissions.

Registers are published in a prescribed data format, which is why they can be searched nationally rather than council by council. The aggregated national dataset is a faster starting point than twenty separate council websites when you are sourcing sites across a region.

The difference between Part 1 and Part 2 entries

Part 1 is a list. It records the authority's view that a site meets the criteria, with fields for the site name, coordinates, area, ownership status, planning history, a minimum and maximum net dwelling range, and whether the site is deliverable.

Part 2 is a decision. The authority enters a site in Part 2 only after following publicity, consultation and notification procedures equivalent to those for a planning application, and only where it has decided the site is suitable for permission in principle. That means notifying owners and occupiers, publicising the proposal, consulting the relevant statutory bodies and taking representations into account.

The practical consequence is straightforward. A Part 1 entry is evidence you can use in a planning argument, showing the authority regards the land as suitable in principle for housing. A Part 2 entry is a consent.

Councils have been cautious about Part 2, partly because the procedure is resource intensive and partly because permission in principle removes their ability to refuse on the settled matters later.

How an entry can grant permission in principle

Where a site is entered in Part 2, permission in principle takes effect for the housing development described, together with any non-housing development that is compatible with the residential use. It settles just three things: the location, the land use and the amount of development, expressed as a range of dwellings.

It lasts five years from the date of entry, which is longer than the three years that attach to permission in principle granted on application. If no technical details consent is granted in that period, the permission in principle lapses.

Some development is excluded. Permission in principle cannot be granted for development requiring environmental impact assessment, or for development likely to have a significant effect on a European site requiring appropriate assessment. Where either applies, the site stays in Part 1 or comes out altogether. The distinction between outline permission and permission in principle matters here, because outline permission can carry EIA development and permission in principle cannot.

Getting a site added to the register

There is no statutory right to have land entered. Authorities decide what goes on, and most run an annual call for sites alongside the review, though many will accept a submission at any point.

A submission that gets taken seriously usually contains: a red line plan with the area in hectares, evidence that the land is previously developed within the policy definition, title information showing ownership and any constraints, a capacity statement with an indicative dwelling range, a summary of access and services, and a short note on known constraints and how they would be addressed.

Previously developed land is the test that trips submissions up. Agricultural buildings and land, private residential gardens, mineral workings with restoration conditions, and land where the remains of a permanent structure have blended into the landscape all sit outside the definition. Check the wording in the current Framework before you argue the point.

Where a site is plainly brownfield but the council has not listed it, read how councils run their own registers and permission in principle before making a submission, because approaches differ sharply between authorities.

Limits on what an entry covers

An entry in either part is not a substitute for the checks you would run anyway. It does not confirm that the land is free of contamination, that flood risk has been assessed, that access can be delivered, or that there is any sewer capacity.

It does not override designations. A site can be on a register and still be subject to a Tree Preservation Order, sit within a conservation area, or fall inside a nutrient neutrality catchment. Nor does it affect biodiversity net gain: the biodiversity gain condition applies to technical details consent in the ordinary way, so the habitat baseline still has to be measured, and on a site that has been vacant for years that baseline may be higher than expected.

A Part 1 entry also carries no weight against a later change of policy. Authorities remove sites at each review, and an entry is not a promise.

Moving from an entry to technical details consent

Permission in principle is only half a consent. The second stage is technical details consent, applied for under the permission in principle order, and it is where everything the earlier stage did not settle gets decided: layout, scale, appearance, landscaping, access, drainage, contamination, ecology, parking and conditions.

The authority must grant technical details consent in accordance with the permission in principle, so it cannot revisit whether housing is acceptable in that location or reopen the dwelling range. It can refuse on the details, and it does. The evidence base for that application looks like a full application: a design and access statement where required, the technical reports the site constraints demand, and the supporting document set the validation list requires.

Plan it as a full application in everything except the principle. Work through how permission in principle and technical details consent interlock before committing to the route, because the timescales are tighter than they look.

Checking the register before buying

Register data is useful due diligence and costs almost nothing to obtain. Before an acquisition, establish which part of the register the site sits in and the date of entry, the dwelling range recorded, whether any permission in principle is live and when it expires, and how the council's stated capacity compares with your own.

Then look at what the register does not say. Pull the planning history, check the constraint layers, and treat the authority's capacity figure as an opening position rather than a finding. A council that recorded a range of twelve to eighteen dwellings three reviews ago may have used a density assumption that no longer matches its adopted policy.

Follow reform news on the planning law updates timeline rather than assuming the regime is static, since the registers sit alongside permission in principle and both have been revisited more than once.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does being on a brownfield land register grant planning permission?

Only if the site is in Part 2. A Part 1 entry records the authority's view that the land is suitable, available and achievable for housing, which is useful evidence but grants nothing. A Part 2 entry grants permission in principle for the housing described, settling location, land use and the amount of development.

How long does permission in principle from a register entry last?

Five years from the date the site is entered in Part 2, compared with three years for permission in principle granted on application. If no technical details consent is granted within that period the permission in principle lapses and the site reverts to needing a conventional application route.

How do I get a site onto a brownfield land register?

Most councils run an annual call for sites alongside the statutory review, and many accept submissions at any time. Provide a red line plan with the area in hectares, evidence that the land is previously developed, title information, an indicative dwelling range and a note on constraints. There is no right to have land entered.

What size does a site need to be?

The regulations set a threshold of at least 0.25 hectares, or land capable of supporting at least five dwellings. The land must also be previously developed, suitable for residential development, available for it and achievable, meaning development is likely within fifteen years. Authorities apply those tests using their own housing land evidence.

Can permission in principle be granted for any brownfield site?

No. It cannot be granted for development requiring environmental impact assessment, or where the proposal is likely to have a significant effect on a European site requiring appropriate assessment. Sites in either category stay in Part 1 or come off the register, and any development there needs an outline or full application instead.

Sources and further reading

brownfield registerpermission in principletechnical details consentland sourcinghousing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Local validation lists: what authorities may require

A local list item only bites if it was published within two years and is reasonable for your scheme. How to check, and what to do when validation disagrees.

Read article →
Planning Law Updates8 min read

Temporary stop notices and how long they last

A temporary stop notice halts an activity on display, with no right of appeal, and now lasts up to 56 days in England. Here is what it can and cannot prohibit.

Read article →
Planning Law Updates7 min read

Appeal procedures compared: written, hearing and inquiry

You state a preference and the Inspectorate decides. Here is how the three appeal procedures are allocated, what each demands, and how to argue for the one you want.

Read article →
Planning Law Updates8 min read

Prior approval procedure and the deemed grant trap

The 56 day deemed grant under paragraph W runs from receipt, permits only what was submitted, and waives none of the class conditions. How to use it safely.

Read article →
Planning Law Updates7 min read

Permitted development conditions and the effect of a breach

A breached condition in the General Permitted Development Order leaves the whole extension unauthorised, not just the non-compliant part. What follows and how to fix it.

Read article →
Planning Law Updates7 min read

The standard method for local housing need explained

Local housing need now starts from existing stock rather than household projections. The result is a minimum for plan making, not a target, a ceiling or a test for any single application.

Read article →