Burial grounds and human remains in development
Planning permission does not authorise disturbing burials. The licensing regimes, notice periods, archaeological requirements and consultation that apply instead.
Human remains on a development site trigger a licensing regime that is separate from planning permission and separate from any archaeological condition. Removing buried human remains in England normally requires a licence from the Secretary of State under section 25 of the Burial Act 1857, or a faculty where the ground is consecrated Church of England land. A planning permission does not authorise the disturbance, an archaeological written scheme of investigation does not authorise it either, and discovering this after the groundworks contractor has mobilised is an expensive way to learn it.
Which regimes can apply at once
On a site with burials, up to four regimes run in parallel, and each has its own decision maker.
Planning permission deals with the acceptability of the development. Heritage consents deal with listed structures, monuments and, where relevant, scheduled status. Burial law deals with the removal of remains. And where the ground is or was a burial ground held by particular bodies, statutory restrictions on building may apply in their own right.
They are not sequential and they are not alternatives. A scheme can have planning permission and still be unable to lawfully lift a single burial.
Establish which apply during due diligence. Old maps, tithe records, the Historic Environment Record, the Archaeological Desk-Based Assessment and the title documents between them usually reveal a former chapel yard, a Quaker or Nonconformist burial ground, a workhouse cemetery or a plague pit. These are common in urban sites and are frequently unmarked on modern mapping.
Licences to remove remains
A licence under section 25 of the Burial Act 1857 is issued by the Ministry of Justice and authorises the removal of remains from a place of burial. Applications are made on the department's form and are normally dealt with in a matter of weeks rather than months, though that should not be relied on where a programme is tight.
Licences carry conditions. The usual ones require the work to be screened from public view, that remains are handled with due care and attention to decency, that a specified method is followed, and that remains are reinterred or cremated within a defined period, or retained for study for a stated time where research value is accepted.
The licence is about decency and public order rather than archaeology. That distinction explains why its conditions can sit awkwardly with an archaeological research design, and why both documents have to be written with each other in view.
Where remains may be recent, the position changes. Anything that could be a modern burial, or that raises a question of unexplained death, is a matter for the police and the coroner before anyone continues.
Disused burial grounds and the restriction on building
The Disused Burial Grounds Act 1884 prohibits building on a disused burial ground, subject to limited exceptions. The Disused Burial Grounds (Amendment) Act 1981 created a route to build, but only on conditions.
Those conditions include publishing notice of the intention, giving personal representatives and relatives an opportunity to remove remains themselves or to object, removing the remains that are affected, and reinterring or cremating them in accordance with the Act. The notice period and procedure are prescribed, so the timetable is not within the developer's gift.
Check whether the restriction bites before assuming the 1981 route is available. It applies to particular categories of ground, and the answer depends on the history of the land, who held it, and whether burial rights have been extinguished. This is a legal question for a solicitor with the title deeds, not a planning question.
Consecrated ground and the faculty route
Land consecrated according to the rites of the Church of England is governed by ecclesiastical law. Removal of remains from consecrated ground normally requires a faculty from the diocesan consistory court rather than a Ministry of Justice licence, and the process runs on its own timetable with its own petitioning requirements.
Consecration follows the land rather than the building. A churchyard sold decades ago and now in commercial use can remain consecrated, and a burial ground attached to a demolished chapel may still be within the jurisdiction. The chancellor of the diocese decides.
The wider framework here overlaps with the ecclesiastical exemption and listed building consent, and the two questions are often answered by the same diocesan advisory body at the same time. Approach them together.
Archaeological requirements sit alongside, not instead
Where remains are of archaeological interest, the council's archaeological adviser will expect excavation, recording and analysis to a professional standard, usually secured by condition through a written scheme of investigation.
That work includes osteological assessment: age, sex, stature, pathology, and where research questions justify it, isotope or ancient DNA analysis. It needs specialists, and the Chartered Institute for Archaeologists publishes standards for the treatment of human remains that councils expect to be followed.
An Archaeological Field Evaluation is the usual way of establishing how many burials there are before the main works, and the number matters enormously. A dozen burials is a manageable variation. Several hundred is a project in itself, with implications for programme, cost, storage and eventual reburial.
The licence and the archaeological condition must agree with each other on retention. A licence requiring reinterment within twelve months and a research design proposing long term curation are in conflict, and the time to resolve that is at application, not at excavation.
Consultation with faith communities and descendants
This is the part that cannot be reduced to a procedure, and the part that most affects how a scheme is received.
Where a burial ground is associated with a living congregation or a defined community, early consultation with that community is both expected and sensible. Jewish and Muslim burial grounds raise particular requirements about disturbance and reburial that should be understood from the community itself rather than from a checklist.
Descendant interest is real for burials of the nineteenth and twentieth centuries. The statutory notice procedures exist partly to give relatives the chance to act, and local and family history societies often surface interest that the notices alone would not.
Handle press and site security accordingly. Screening is a licence condition for a reason, and images of exposed burials circulating locally will damage a scheme in ways no planning argument recovers.
Reburial, memorialisation and programme
Reburial needs somewhere to go. That means a cemetery or burial ground willing to accept the remains, a plot, a fee, and sometimes an agreement with the local authority or diocese. Secure it early, because the licence will require it and availability is not guaranteed.
Memorialisation is often the element that resolves community concern. A recovered and relocated headstone, an interpretation panel, a plaque, or a named memorial listing those reinterred, agreed with the community rather than designed for it.
For the programme, assume the following sequence and price each stage separately: desk assessment, evaluation to establish numbers, licence or faculty application, notice periods where the 1884 restriction applies, excavation with screening and supervision, osteological assessment, reburial arrangements, and reporting. Each of those has a lead time, and the notice periods in particular cannot be accelerated.
Treat this as a material risk in the appraisal rather than a contingency line. Sites with burials have derailed more schemes than sites with bats.
This is general guidance, not legal advice. Check the position with your local planning authority, the relevant licensing authority and a solicitor before relying on it. A Heritage Statement should set out the significance of the burial ground and its setting as part of the application.
Browse all 66 PlanScope report types to see which heritage and archaeological documents a site like this is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Do I need a licence to remove human remains from a development site?
Normally yes. Removing buried human remains in England generally requires a licence from the Secretary of State under section 25 of the Burial Act 1857, issued by the Ministry of Justice. Where the ground is consecrated Church of England land, a faculty from the diocesan consistory court is usually required instead. Planning permission does not authorise removal.
Can you build on a disused burial ground?
Only within the route created by the Disused Burial Grounds (Amendment) Act 1981, and only on conditions. Those include publishing notice, allowing relatives and personal representatives to object or remove remains themselves, and reinterring or cremating affected remains. Whether the restriction applies at all depends on the history and ownership of the land.
What conditions come with a burial licence?
Typically that the work is screened from public view, that remains are handled with due care and attention to decency, that a specified method is followed, and that remains are reinterred or cremated within a defined period, or retained for study for a stated time. The licence addresses decency and public order rather than research value.
How do archaeological conditions interact with the burial licence?
They run alongside each other. The council's archaeological adviser will expect excavation, recording and osteological assessment to professional standards through a written scheme of investigation. Conflicts arise where the licence requires reinterment within a set period and the research design proposes long term curation, so both should be drafted together.
How many burials should be expected on a site?
Evaluation is the only reliable way to find out, and the number changes the project. A dozen burials is a manageable variation. Several hundred becomes a project in its own right with consequences for programme, cost, storage and reburial capacity. Establish numbers before the main works are priced.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.