Caravan and residential park home site planning permission

7 min readBy PlanScope Editorial Team

Permission authorises the use, a site licence regulates the layout, and the licence cannot be issued without the permission. Here is how the two consents fit together and why flood risk decides so many rural caravan applications.

A caravan site needs two consents, not one. Caravan site planning permission authorises the use of the land, and a site licence issued under the Caravan Sites and Control of Development Act 1960 regulates how the site is laid out and run. The licence cannot be issued to anyone who does not already hold planning permission for the use, so the order is fixed: permission first, licence second, and the licence conditions then bind the operation for as long as it continues.

Landowners routinely apply for one and discover the other halfway through.

Two consents, two regulators, one site

Planning permission comes from the local planning authority and answers the policy question: is this use acceptable here, at this scale, with this access and this landscape effect.

The site licence comes from the local authority acting under the 1960 Act and answers the operational question: are the units far enough apart, are the roads wide enough for a fire appliance, is there adequate water, drainage, refuse storage and lighting. Licence conditions draw on the government's model standards for caravan sites, which cover separation between units, road widths, hard standings, fire points and boundary distances. Check the current version rather than an older one, because they have been revised.

For residential park home sites in England the Mobile Homes Act 2013 added a licensing regime with fit and proper person requirements and enforcement powers, and residents on protected sites hold statutory agreements under the Mobile Homes Act 1983. None of that is planning, and none of it can be fixed by a planning condition.

What counts as a caravan, and when siting one is development

The statutory definition is in section 29 of the 1960 Act: a structure designed or adapted for human habitation that is capable of being moved from one place to another, whether by towing or on a vehicle. Section 13 of the Caravan Sites Act 1968 extends that to twin-unit structures assembled on site, within maximum dimensions of 20 m in length, 6.8 m in width and 3.05 m internal height.

Exceed those dimensions and the structure is not a caravan. It is a building, which changes the application from a change of use to operational development and usually changes the policy test with it.

Stationing caravans on land is a change of use of the land rather than building work. Whether it needs permission is the ordinary question of whether there has been a material change of use, so a single caravan used by the household within the garden of a house, incidental to the enjoyment of that house, generally does not need permission, while five caravans let to holidaymakers in the same garden plainly would.

Schedule 1 to the 1960 Act lists uses that do not need a site licence, and Part 5 of Schedule 2 to the General Permitted Development Order 2015 grants planning permission for most of those same circumstances. The recurring ones are use incidental to a dwellinghouse, a single caravan for one or two nights by a traveller, up to three caravans on land of five acres or more for not more than 28 days in any twelve months, sites approved by certified exempted organisations, seasonal accommodation for agricultural and forestry workers, and accommodation on building and engineering sites. Each has conditions attached and each is narrower than it sounds.

Residential, holiday and touring pitches are different applications

The three are treated separately, and mixing them in one application without saying so is a common reason for refusal.

A residential park home site provides permanent homes. It engages housing policy, needs to be assessed against the local plan's spatial strategy, and in most rural authorities will be tested for whether the location is sustainable for people who live there all year.

A static holiday caravan site provides tourism accommodation. It engages rural economy and tourism policy, which is often more permissive in the countryside, but it comes with occupancy conditions to stop the units becoming permanent homes.

A touring site provides pitches for caravans and motorhomes brought by their occupants. Landscape effect is lower because the units come and go, but the seasonal traffic, the utility provision and the reinstatement of the land when the site closes all get scrutinised.

Say which one you are applying for in the first paragraph of the planning statement, and say what the maximum number of pitches will be. Applications that leave that open are usually refused or heavily conditioned.

Why flood risk is the hardest test for caravan sites

The flood risk vulnerability classification treats caravans, mobile homes and park homes intended for permanent residential use as highly vulnerable development. That is the most restrictive category, and highly vulnerable development should not be permitted in Flood Zone 3, and in Flood Zone 2 requires the exception test to be passed.

Sites used for holiday or short-let caravans and camping sit one step down, as more vulnerable, provided there is a specific warning and evacuation plan in place.

The logic is straightforward once you have seen a flooded caravan site. Units are light, they float, occupants may be asleep and unfamiliar with the area, and evacuation on foot through moving water is dangerous. So the sequential test bites hard, the Environment Agency comments, and a flood risk assessment that does not include a proper flood warning and evacuation plan, with named responsibilities and a route to a refuge above design flood level, will not satisfy either the council or the Agency.

Where the site is seasonal, a condition closing it during the winter months is a common mitigation, because it takes the occupants out of the period of highest fluvial risk.

The evidence base an officer will ask for

For anything beyond a handful of pitches, budget for the following:

  1. A survey-based site layout showing pitch positions, separation distances, roads, turning heads, parking, refuse points and fire points.
  2. Access and visibility splays measured against the highway authority's standards, with a swept path analysis for the largest vehicle expected, which for a static site means the transporter that delivers the units.
  3. Foul drainage evidence: connection to the public sewer where available, or a package treatment plant with percolation testing and an environmental permit position.
  4. Surface water drainage that accounts for the hard standings and access roads, with discharge rates agreed.
  5. Water supply, electricity and lighting, with a lighting design that keeps spill away from hedgerows used by bats.
  6. An ecological appraisal, since these sites tend to be on field margins, and a landscape assessment where the site is prominent or within a National Landscape.

Landscape effect decides more rural caravan applications than anything except flood risk. Static units read as pale horizontal blocks in an open field, and screening takes years to establish. A landscape and visual impact assessment prepared to the usual guidelines, with winter viewpoints rather than summer ones, is worth more than a promise of planting.

Conditions you should expect and read carefully

Occupancy conditions are the substance of most holiday site permissions. The usual form restricts occupation to holiday purposes, prevents any unit being occupied as a sole or main residence, and requires the operator to keep a register of occupiers with home addresses and dates of stay, available to the council on request.

Seasonal conditions close the site for a defined period each year. Read the dates before agreeing, because a closure period that runs from late October to mid-March removes most of the shoulder season.

Other standard conditions cap the number of units, fix their positions by reference to an approved layout, control external colours and materials, require landscaping to be planted in the first planting season and replaced if it fails, and restrict the storage of touring units on pitches out of season.

Breaching an occupancy condition is enforceable through a breach of condition notice, which carries no right of appeal, and long-term breaches on caravan sites are one of the areas rural councils do pursue.

Working order for a new site

Pre-application advice first, because the officer will tell you whether the principle is acceptable before you spend money on surveys. Then the constraints check: flood zone, landscape designation, highway access, ecology, heritage. Then the technical evidence. Then the application. Then, once permission is granted, the site licence application to the same council under the 1960 Act, with a layout that matches the approved plan.

Sites for Gypsies and Travellers are assessed under a separate national policy document with its own definitions and tests, and should not be run through the same policy framework as a holiday park.

This is general guidance, not legal advice. Permitted development and licence exemptions are narrow and site specific, and a Lawful Development Certificate is the only formal way to confirm that a use is lawful. Check the position with your local planning authority or a qualified professional before relying on it.

Browse the 66 PlanScope report types or enter your postcode on PlanScope to see which documents a caravan site application is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission and a site licence for a caravan site?

Both, in that order. Planning permission from the local planning authority authorises the use of the land. A site licence under the Caravan Sites and Control of Development Act 1960 regulates layout, spacing, roads, drainage and fire safety, and it cannot be issued to anyone who does not already hold planning permission for the use.

What legally counts as a caravan?

Section 29 of the Caravan Sites and Control of Development Act 1960 defines it as a structure designed or adapted for human habitation that is capable of being moved. Section 13 of the Caravan Sites Act 1968 extends this to twin-unit structures assembled on site within maximum dimensions of 20 m in length, 6.8 m in width and 3.05 m internal height.

Can I put caravans on my land for 28 days without permission?

There is an exemption allowing up to three caravans on land of five acres or more for not more than 28 days in any twelve months, alongside other exemptions in Schedule 1 to the 1960 Act that are mirrored in Part 5 of Schedule 2 to the General Permitted Development Order 2015. Each exemption carries conditions and is narrower than it first appears.

Why are caravan sites treated so strictly on flood risk?

Caravans, mobile homes and park homes intended for permanent residential use fall into the highly vulnerable category, which should not be permitted in Flood Zone 3 and requires the exception test in Flood Zone 2. Holiday and short-let caravan and camping sites sit one step down as more vulnerable, provided a specific flood warning and evacuation plan is in place.

What conditions do councils attach to holiday caravan permissions?

Occupancy conditions restricting use to holiday purposes and barring any unit from being a sole or main residence, a register of occupiers available to the council, a seasonal closure period, a cap on the number of units, positions fixed to an approved layout, controls on colours and materials, and landscaping to be planted and maintained.

Sources and further reading

caravan sitespark homesrural planningsite licenceflood riskoccupancy conditions

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides7 min read

Planning permission for a zip wire course in woodland

A woodland zip wire course needs full planning permission, and the case turns on ancient woodland status, what the anchors and platforms do to the trees, and whether the access can take visitor traffic.

Read article →
Project Type Guides7 min read

Permission for housing on a car showroom site

A car showroom redevelops on its contamination report. Staging the intrusive investigation around demolition is what determines the programme.

Read article →
Project Type Guides7 min read

Permission for a rooftop extension to a car park

Development above a multi storey car park stands or falls on column and foundation capacity. Get the intrusive structural appraisal done before anything else is commissioned.

Read article →
Project Type Guides6 min read

Permission for a restaurant terrace on the pavement

Removable tables on the public footway need a pavement licence. A terrace on your own forecourt is a planning matter. Most disputes come down to where the highway edge sits.

Read article →
Project Type Guides7 min read

Permission for new gates and railings to a listed house

Boundary structures at a listed house are usually part of the listing, and permitted development rights for means of enclosure do not apply within the curtilage. Both consents are needed.

Read article →
Project Type Guides7 min read

Permission for a basement cinema under a listed house

A basement under a listed building needs listed building consent, a structural method statement and usually a basement impact assessment. The statutory duty on harm decides most of these cases.

Read article →