Changing a Class E unit to a hot food takeaway
Hot food takeaways were left outside the use classes in 2020, so every change from Class E needs planning permission. Concentration and school proximity policies usually decide the application.
Turning a Class E unit into a hot food takeaway needs planning permission, every time. There is no permitted development route for it, because the sale of hot food for consumption off the premises was taken out of the use classes in September 2020 and left as a use in its own right. The Town and Country Planning (General Permitted Development) (England) Order 2015 allows the reverse move, from a takeaway into Class E, but not the one you want. So the application is a full change of use application, and it will usually be decided on local concentration and school proximity policy rather than on how good your extraction design is.
Why a takeaway sits outside Class E
Class E of the Town and Country Planning (Use Classes) Order 1987, as amended in 2020, gathers shops, cafés and restaurants, financial and professional services, indoor fitness, medical uses, nurseries, offices, research and light industry into a single class with free movement between them. A café at E(b) covers the sale of food and drink mainly for consumption on the premises.
Hot food taken away is different. It was Class A5 until the 2020 amendment, and it is now a named use outside the classes, which means every change into it is a material change of use requiring permission.
The grey area is the restaurant that also does takeaway. A modest counter trade alongside covers is normally ancillary to the E(b) use. Once the takeaway trade becomes the main activity, measured by turnover, floor area given over to waiting customers and the pattern of trading, it has become a separate use. Delivery-only kitchens with no customer frontage are argued both ways, and a lawful development certificate is the only way to settle it with certainty.
Local policies that decide the application
Most adopted local plans carry a policy on hot food takeaways, and it usually does two things: it caps the proportion or number of takeaways within a defined frontage or centre, and it keeps new takeaways away from schools.
The school restriction is the one that catches people. In London, Policy E9 of the London Plan asks boroughs to restrict new hot food takeaways within 400 metres walking distance of primary and secondary schools, and many authorities outside London have adopted a comparable radius through their own plans or a supplementary planning document. Walking distance, not straight line. Measure it on a route, not with a compass.
Concentration policies are usually expressed as a percentage of ground floor units in a defined frontage, or as a bar on two takeaways adjoining one another. Read the policy wording and then count the units yourself on the ground, because the council's monitoring may be out of date and a vacant unit's lawful use is not always what the last occupier did.
| Policy test | What the council is measuring | Evidence that helps |
|---|---|---|
| Concentration in a centre | Proportion or number of existing hot food takeaways in the defined frontage | A surveyed schedule of ground floor uses with photographs and dates |
| Proximity to schools | Walking distance from the unit to the school entrance | A measured route plan, not a radius |
| Vitality of the centre | Loss of a shop or service from a primary frontage | Marketing evidence and the unit's trading history |
| Residential amenity | Noise, odour, litter and late activity near homes | Extraction design, acoustic report, management plan |
Where the unit sits in a primary shopping frontage, the retail policy tests may also apply, and the reasoning in our note on the retail tests for a trade counter conversion transfers directly.
Extraction, odour and the duct route
Odour is the issue that turns neighbours into objectors, and the fix is a duct, not a filter alone. The accepted approach for commercial kitchens is to discharge at high level, usually at least a metre above the ridge of the building and clear of openable windows, with grease filtration and an odour abatement stage sized to an assessed odour risk.
That duct has to get from the kitchen to the roof. In a terrace of listed or unlisted shops with flats above, the route is often the deciding constraint, because running it up the front elevation is unacceptable visually and running it internally through residential demises needs the freeholder and probably a deed of variation. Work the route out before you sign the lease.
A Ventilation and Extraction Statement sets out the kitchen schedule, the extract rate, the abatement stages, the discharge point and the maintenance regime. Environmental health officers read this part closely and will ask for commissioning evidence by condition.
Fan and condenser noise is assessed separately, normally under BS 4142:2014+A1:2019, against the background sound level at the nearest residential facade at the quietest trading hour. A Noise Impact Assessment that measures the real background rather than assuming a typical urban level is worth the money, and the same logic applies to any external refrigeration, as our note on refrigeration plant noise explains.
Litter, parking and delivery riders
Takeaway litter is a planning consideration where the evidence supports it, and the usual response is a management plan secured by condition: bins inside and outside the unit, a litter picking radius and frequency, and a named responsible person.
Delivery riders have changed this part of the assessment. A unit with a strong delivery trade generates riders waiting, idling and parking, often on the footway. Councils increasingly ask for a rider waiting area inside the unit, secure cycle parking, and a condition preventing riders from congregating outside. Offer that before you are asked.
Customer parking matters most on a parade with no off-street provision and a 20 minute dwell time. A short Transport Statement covering trip generation, servicing and the loading arrangement is usually enough at this scale, and it heads off a highway authority objection based on nothing more than the absence of information.
Hours and the amenity case
Hours do more work than any other condition in a takeaway consent. Where the unit adjoins or sits beneath flats, expect a closing time earlier than you want, and expect the council to look at cumulative late night activity in the street rather than at your unit alone.
Two points are worth making in the submission. First, if you intend to trade after 23:00 you will also need a premises licence for late night refreshment under the Licensing Act 2003, and the two regimes are decided separately on different tests. Second, offering a tighter closing time on Sunday to Thursday with a later Friday and Saturday is often more persuasive than asking for a uniform late hour.
As an illustrative example, a vacant former estate agent on a suburban parade, with two flats above and a primary school 320 metres away by footpath, would fail a 400 metre school policy on measured walking distance before extraction was even discussed. The same unit 450 metres away, with a rear service yard and a route for the duct up the back elevation, is a very different application.
Conditions to expect and to offer
Offering conditions in the covering submission signals a competent applicant and narrows the officer's work.
- Opening hours, split between weekdays and weekends.
- Installation and commissioning of the extraction and abatement system before first use, with evidence submitted.
- A maintenance and filter replacement schedule, retained for inspection.
- A litter and waste management plan, including bin storage and collection times.
- A delivery rider management plan with cycle parking and a waiting area inside the unit.
- A limit on external plant noise expressed as a rated level relative to background.
This is general guidance rather than legal advice, so check the policy position and the lawful use of the unit with your local planning authority before you commit to a lease. Enter your postcode on PlanScope to see which reports a change of use at your unit is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Is there a permitted development right from Class E to a takeaway?
No. The sale of hot food for consumption off the premises was left outside the use classes by the 2020 amendment, so the change is always a material change of use needing permission. The General Permitted Development Order 2015 allows the opposite move, from a hot food takeaway into Class E, but not the one you want.
Can a restaurant sell takeaway food without a separate permission?
A modest counter trade alongside covers is normally ancillary to the Class E(b) restaurant use. Once takeaway becomes the main activity, judged by turnover, the floor area given to waiting customers and the trading pattern, it is a separate use. A lawful development certificate is the only way to settle a borderline case.
How is the 400 metre school distance measured?
By walking distance along available routes, not as a straight line radius. Policy E9 of the London Plan asks boroughs to restrict new hot food takeaways within 400 metres walking distance of primary and secondary schools, and many authorities outside London use a comparable measure set through their own local plan or guidance.
Where does the kitchen extract duct have to discharge?
Normally at high level, around a metre above the ridge of the building and clear of openable windows, with grease filtration and odour abatement sized to the assessed risk. The route from kitchen to roof is often the deciding constraint in a terrace with flats above, so resolve it before signing a lease.
Do I need a licence as well as planning permission?
If you intend to trade after 23:00 you will need a premises licence for late night refreshment under the Licensing Act 2003, decided separately from planning on different tests. You will also need to register the food business with the council. A planning permission does not imply either of them.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.