Chargeable development under the Community Infrastructure Levy

7 min readBy PlanScope Editorial Team

Chargeable development is the net new floorspace the levy actually bites on. The in-use test for existing buildings and the order in which notices are served decide most liabilities.

Chargeable development is the term the Community Infrastructure Levy Regulations 2010 use for the development that actually attracts a levy charge. It is not the same as the development described on the application form. Regulation 6 defines what counts as development for levy purposes, the minor development exemption takes out new build under 100 square metres unless a dwelling is created, and the existing floorspace offset removes the gross internal area of qualifying buildings already on the site. What is left, net, is chargeable.

Three details decide most liabilities: the gross internal area measurement, whether the existing building passes the in-use test, and whether anyone served the right notice before work started.

What makes development chargeable

The levy applies to development that creates new build floorspace or new dwellings, in an area where a charging authority has adopted a charging schedule.

Regulation 6 captures anything done by way of, or for the purpose of, the creation of a new building or the enlargement of an existing one. A change of use with no new floorspace is normally outside it, which is why a conversion can be levy-free while the same building extended by a single storey is not.

Two exclusions do the most work in practice. Development with a gross internal area of new build below 100 square metres is exempt as minor development, unless it creates one or more dwellings, in which case the exemption falls away entirely. And buildings into which people do not normally go, or go only intermittently for the purpose of maintaining plant, are outside the charge.

Mezzanine floors inserted into an existing building are a recurring trap. Where the floorspace is created within an existing structure the position depends on whether planning permission was required for it, so check before assuming a mezzanine is free.

How the chargeable amount is calculated

The calculation is mechanical, and it is set out in regulation 40.

The chargeable amount is the rate from the adopted charging schedule, applied to the net chargeable area, indexed from the year the charging schedule took effect to the year permission was granted. The index is specified in the Regulations and published annually, so the figure that applies to your permission is not the figure that applied when the schedule was adopted.

Rates are set per square metre and usually vary by use and by geographic zone within the authority. Residential, retail and other uses can each carry a different rate on the same site, which means a mixed-use scheme is calculated use by use rather than as a single sum.

Two measurement points matter more than they should. Gross internal area is measured to the internal face of the external walls, following the recognised measuring practice, and it includes plant rooms, circulation, internal walls and stair openings. An area schedule prepared for a sales brochure will understate it. Prepare a separate levy area schedule, and keep the calculation on the same basis for the existing building as for the proposed one.

The existing floorspace offset and the lawful use condition

The offset is where money is won and lost.

The gross internal area of an existing building on the site can be deducted from the new floorspace, but only where the building is an in-use building. The test, in Schedule 1 to the Regulations, is that a part of the building has been in lawful use for a continuous period of at least six months within the three years ending on the day planning permission first permits the chargeable development.

Each element of that test is litigated. Lawful use means use that did not breach planning control, which brings the planning unit and its lawful use into play, and severance of a planning unit can change the answer. Continuous means without a break. Six months within three years is a short window and a long lookback, and a building empty since before that window gets no offset at all.

Both demolished and retained parts can be offset where they qualify. A building demolished before the application is submitted can still attract the offset if it passed the in-use test on the relevant day, which is why a demolition programmed to suit a construction sequence can cost a great deal of levy.

Evidence of in-use is the applicant's problem. Business rates records, utility bills, lease documents, payroll, delivery records and dated photographs are what collecting authorities accept. Assemble them before the building empties, not afterwards.

Levy liability does not depend on a planning application. Development carried out under a general consent, which in practice means permitted development under the General Permitted Development Order, can be chargeable in the same way.

Where that applies, regulation 64 requires a notice of chargeable development to be submitted to the collecting authority before development begins. The authority then issues a liability notice as it would for a permission.

This catches conversions and prior approvals that create dwellings. An office to residential conversion that adds floorspace, a barn conversion with an extension, an upward extension under the relevant class: each can be chargeable, and none of them generates a planning permission that would prompt the authority to issue a notice automatically. Begin without the notice and the surcharges follow.

Liability notices, assumption of liability and demand notices

The procedural sequence is unforgiving and there are four documents in it.

  1. The liability notice, issued by the collecting authority as soon as practicable after permission first permits the development, stating the chargeable amount and the payment terms.
  2. The assumption of liability, submitted by whoever will pay. Without it, liability defaults to the landowner and the instalment policy may be lost.
  3. The commencement notice, submitted before development begins and stating the intended start date. Omitting it triggers a surcharge calculated as a percentage of the chargeable amount subject to a cap, and the loss of any instalment policy, so the whole sum becomes payable immediately.
  4. The demand notice, which sets out what is due and when.

Late payment attracts further surcharges and interest. The amounts and percentages are set by the Regulations and have been amended, so take them from the current text.

Appeals are not to the Planning Inspectorate. The chargeable amount is reviewed by the collecting authority and then appealed to the Valuation Office Agency, surcharges and other decisions go to the Secretary of State under their own regulations, and everything else is a matter for the courts. Which route applies is a question of the same kind as the one in section 288 challenge or judicial review.

An illustrative example on a conversion

The figures below are illustrative and chosen to show the mechanism.

A two-storey office building of 400 square metres gross internal area is converted to four flats, with a 90 square metre rear extension. The residential rate in the adopted schedule is used, indexed to the year of permission.

If the office was occupied under a lease until four months before permission, with continuous occupation for the preceding two years, it passes the in-use test. The 400 square metres offsets against the new residential floorspace, leaving the 90 square metre extension as the net chargeable area.

If the office has stood empty for four years, it fails the test. There is no offset, and the chargeable area is the full new residential gross internal area, extension included. The same building, the same scheme, and a liability several times larger.

The difference is a matter of dates and evidence rather than of design.

Reliefs and the sequence that preserves them

Reliefs and exemptions are available for self-build housing, residential annexes and extensions, social housing and charitable development. All of them share one feature: they must be claimed and granted before development begins, and a commencement notice must still be served.

The sequence that preserves relief runs: liability notice issued, assumption of liability submitted, relief claimed, relief granted in writing by the authority, commencement notice served, then work starts. Start before the grant and the relief is lost outright, with no discretion to restore it.

Self-build relief carries a clawback period during which the dwelling must remain the claimant's principal residence, and a disqualifying event within that period makes the full amount payable.

Social housing relief interacts with the affordable housing position set out in an Affordable Housing Statement, and the levy sits alongside rather than inside a viability assessment, because levy liability is a fixed cost input rather than a negotiable obligation.

Browse all 66 PlanScope report types to see which documents a scheme of this kind normally needs.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the in-use test for the existing floorspace offset?

A part of the existing building must have been in lawful use for a continuous period of at least six months within the three years ending on the day planning permission first permits the chargeable development. A building empty for longer than that window gets no offset, so the full new floorspace becomes chargeable. Business rates records, leases and utility bills are the usual evidence.

Does the 100 square metre exemption apply to a new house?

No. The minor development exemption covers new build below 100 square metres of gross internal area, but it falls away entirely where the development creates one or more dwellings. A 70 square metre new dwelling is therefore chargeable in full, while a 70 square metre extension to an existing commercial building is not.

Is permitted development liable for the levy?

It can be. Development under a general consent is chargeable in the same way as development under a planning permission, and regulation 64 requires a notice of chargeable development to be submitted before work begins. Because no permission is issued, nothing prompts the authority to send a liability notice automatically, so the duty sits with the developer.

What happens if no commencement notice is served?

A surcharge applies, calculated as a percentage of the chargeable amount subject to a cap, and any instalment policy is lost so the whole sum falls due immediately. Where a relief or exemption had been granted, starting work without serving the commencement notice can also forfeit it. The amounts have been amended, so check the current Regulations.

How is gross internal area measured for the levy?

To the internal face of the external walls, following recognised measuring practice, including plant rooms, circulation, internal walls and stair openings. An area schedule prepared for marketing will understate it. Prepare a separate levy schedule and measure the existing building on the same basis as the proposed one, because the offset depends on a like-for-like comparison.

Sources and further reading

cilcommunity infrastructure levychargeable developmentplanning feesglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Competent person: who the law accepts for which report

Six planning report types carry a statutory competence requirement. Many more only expect a suitably qualified author. The difference changes who can sign and what happens if they cannot.

Read article →
Glossary7 min read

Betterment in highway terms: what a section 278 delivers

A section 278 agreement lets a developer pay a highway authority to improve the existing highway, but only where the authority is satisfied the public benefits. Here is how it is secured and programmed.

Read article →
Glossary6 min read

Exceedance route: where water goes when the system fills

Every drainage system has a capacity, and water above it has to go somewhere. An exceedance route is the designed overland path, and it is a levels exercise before it is a pipe exercise.

Read article →
Glossary6 min read

Receptor: who and what an assessment protects

Receptor is the third term in the source-pathway-receptor chain, and every discipline defines it slightly differently. Getting the list right is what makes the rest of an assessment defensible.

Read article →
Glossary7 min read

Reasonable worst case: what it means in assessment

An outline or parameter-based scheme still has to be assessed against something definite. Reasonable worst case is how that is done, and the parameters you fix decide whether the assessment holds.

Read article →
Glossary7 min read

Severance: when one permission cannot be built in parts

A planning permission is normally a permission for the whole development, not a set of independent parts. Here is what severance means, where the rule comes from, and how to check the position for a part-built site.

Read article →