Data Tools How-To

How to check a tree preservation order before you buy

6 min readBy PlanScope Editorial Team

A protected tree changes what you can build and what you can do in the garden. Here is how to establish whether a specific tree is protected, before you commit.

To check a tree preservation order before you buy, you need three things: the council's TPO map or register, the order document itself with its schedule, and confirmation of whether the property sits in a conservation area. The map alone is not enough, because an order plan drawn in 1974 and digitised in 2008 can place a tree ten metres from where it actually stands.

A protected tree in the wrong place changes what you can build. It also changes what you can do in the garden, which is the part buyers discover after completion.

Where orders are recorded

Every local planning authority keeps a register of the tree preservation orders it has made under section 198 of the Town and Country Planning Act 1990. Most publish a searchable map. Some publish only a list, and a few will only answer a written enquiry.

Orders are also registrable as local land charges, so they appear in the official search your conveyancer carries out. That search is reliable for the existence of an order and less useful for working out which trees it covers, because it returns the order reference rather than the schedule.

Some authorities now publish tree preservation order data through the national planning data platform, which is worth checking alongside the council's own map. Coverage is partial and the council's register remains the definitive record.

Reading the schedule against the plan

An order has two parts that matter. The schedule lists what is protected, by reference number and species. The plan shows where those references sit.

Work through them together. A schedule entry reading "T4 Oak" tells you nothing until you find T4 on the plan, and the plan will show it as a dot, a circle or a hatched area depending on the classification.

Older orders were drawn at small scales on base mapping that has since been superseded. Where the dot sits ambiguously between two trees, the position is uncertain, and that uncertainty is resolved by the tree officer rather than by the buyer's judgement. Plenty of enforcement disputes start here.

Check the date of the order and any subsequent variation or confirmation. An order that was made but never confirmed within six months lapsed, and a provisional order that was allowed to expire protects nothing.

Individual, group, area and woodland classifications

The four classifications behave differently, and the differences matter more than most buyers realise.

Classification What it protects The practical catch
Individual (T) One named tree at a plotted position Position accuracy on older plans
Group (G) Several trees treated as a unit Individual trees within the group are not separately identified
Area (A) All trees of the specified kinds present at the date the order was made Later self-seeded trees are not protected, and proving planting dates is hard
Woodland (W) All trees within the woodland boundary, including future growth Applies to trees planted after the order as well

Area classifications cause the most confusion. An area order protects the trees that were there on the day the order was made, so a 40 year old order over a garden may protect three surviving specimens and nothing else. It does not protect saplings that have grown since. Establishing which is which usually needs an arboriculturist and, on a contested site, aerial photography from the relevant date.

Woodland classification works the other way round and captures new growth, which is why it is used for genuine woodland rather than for garden trees.

Trees protected because of a conservation area

A tree in a conservation area is protected even without an order. Section 211 of the Act requires six weeks' written notice to the local planning authority before carrying out work to a tree above the size threshold set in the 2012 regulations, measured by diameter at 1.5 metres above ground.

The six week period gives the authority time to make an order if it wants to. If it does nothing, you may proceed within the following two years.

So the conservation area question has to be asked separately from the order question. Boundaries are not always where people assume, and they can be checked against the national dataset as described in finding conservation area boundaries. Designations further out from the site, including ancient woodland and protected habitats, show up on the MAGIC service, covered in using MAGIC to check designations around a site.

What a local land charges search shows

The official search reveals registered charges, including tree preservation orders affecting the land being purchased. It has two limits worth knowing.

First, it covers the property being bought. An order on a neighbour's tree whose canopy and roots extend across your boundary will not appear, and that tree can still stop your extension.

Second, conservation area protection is a general designation rather than a charge against a specific tree, so the search tells you the property is in a conservation area without telling you which trees that affects.

Ask the seller directly whether any tree on the plot has been the subject of an application, a refusal or an enforcement notice. That history is informative and is not always visible on the public register.

Asking the tree officer the right question

Councils answer specific questions far more readily than general ones. Compare two enquiries.

A poor one asks whether there are any TPOs at the address. A good one names the address, attaches a plan with the trees numbered, states which trees the buyer is asking about, and asks whether each is protected by order or by conservation area status, giving the order reference and classification.

Most tree officers will answer the second within a couple of weeks, and some will walk the site if the question is worth it. Put the reply in the conveyancing file, because it is evidence of the position at the date of purchase.

When the records are unclear

Sometimes the answer is not clear at all. The plan is ambiguous, the area order predates the tree, or the order was made over a site that has since been subdivided into six gardens.

Treat unclear as protected until proved otherwise. The offence under section 210 of cutting down or wilfully destroying a protected tree carries a substantial fine, and there is a duty to replace under section 206. Nobody has ever been prosecuted for being cautious.

Where a purchase depends on removing or working near a tree, commission a tree survey to BS 5837:2012 before exchange rather than after. It will identify root protection areas and the constraints they place on the footprint, which is the information that decides whether the development you have in mind is achievable at all.

And build the timing in. A tree works application to a council takes eight weeks, a conservation area notice takes six, and neither can be rushed because contracts have been exchanged.

Enter your postcode on PlanScope to see which reports a site with protected trees is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does a local land charges search show tree preservation orders?

Yes, orders affecting the property are registrable as local land charges and appear in the official search. The search returns the order reference rather than the schedule, so it confirms an order exists without telling you which trees it covers. It also will not show an order on a neighbour's tree overhanging your boundary.

Are all trees in a conservation area protected?

Trees above the size threshold in the 2012 regulations, measured by diameter at 1.5 metres above ground, are protected by the section 211 notice duty. You must give the council six weeks' written notice before carrying out work. If the council does not make an order in that period, you may proceed within the following two years.

What does an area classification protect?

All trees of the kinds specified that were present on the date the order was made. Trees that have grown since are not covered, which is why old area orders over gardens often protect only a handful of surviving specimens. Establishing which trees qualify usually needs an arboriculturist and dated aerial photography.

What happens if I remove a protected tree by mistake?

Cutting down or wilfully destroying a protected tree is an offence under section 210 of the Town and Country Planning Act 1990 and carries a substantial fine. Section 206 imposes a duty to replace the tree. Where the position is uncertain, treat the tree as protected and ask the council's tree officer in writing.

How long does a tree works application take?

An application to carry out work to a tree covered by an order is usually determined in eight weeks. A conservation area notice runs for six weeks. Neither timescale bends for a purchase deadline, so raise tree questions before exchange rather than assuming they can be resolved after completion.

Sources and further reading

tree preservation ordertreesconveyancingconservation areahouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Data Tools How-To

View all →
Data Tools How-To8 min read

Finding trip rate data and using it defensibly

The output is only as good as the site selection. Record the land use category, the filters, the included sites and the reason for every exclusion, then offer a sensitivity test.

Read article →
Data Tools How-To7 min read

Using aerodrome safeguarding maps

Safeguarding maps sit with the local planning authority, and the triggers cover far more than tall buildings. Check the map before the layout is fixed, not after.

Read article →
Data Tools How-To7 min read

Checking railway and canal safeguarding near a site

Network Rail and the Canal & River Trust do not grant permission, but their requirements can make one undeliverable. Here is the check to run before the boundary is fixed.

Read article →
Data Tools How-To7 min read

Reading a drainage asset record from a water company

A sewer asset plan shows position, size and flow direction, and rarely much else. Here is how to request it, read it and verify what it leaves out.

Read article →
Data Tools How-To7 min read

Finding section 106 and levy spend data locally

Councils must publish an annual infrastructure funding statement showing what developer contributions were received, allocated and spent. Here is how to read one and what the numbers do not say.

Read article →
Data Tools How-To6 min read

Checking the Housing Delivery Test result for an area

The Housing Delivery Test measurement is published annually for every English authority, and the consequences for decision taking follow from which band it falls into. Here is how to find it and use it properly.

Read article →