Data Tools How-To

Checking air quality management areas and monitoring data

6 min readBy PlanScope Editorial Team

The declaration order names the pollutant and the boundary. The annual status report carries the monitoring data. Both decide what a change of use application has to include.

An air quality management area check takes about twenty minutes and should happen before you sign a lease, not after the environmental health officer has objected to your extract flue. Councils in England declare these areas under Part IV of the Environment Act 1995 wherever the national air quality objectives are not being met, and the declaration tells you which pollutant is the problem, which streets are affected and what the council has committed to do about it.

For a restaurant, a takeaway, a gym with a plant deck or a nursery beside a busy road, that information changes what your application has to include.

Finding declared areas and their boundaries

Start with the council. Every authority that has declared an area publishes the declaration order, a map and its annual reporting, usually under environmental health rather than planning. The order is the authoritative document because it defines the boundary and names the pollutant and the objective being exceeded.

Then cross-check nationally. Defra's air information resource carries a national list of declared areas with an interactive map, which is useful for three things the council pages often miss: whether an area has been revoked or amended, whether neighbouring authorities have declared areas that abut your site, and the historical sequence of declarations.

Boundaries can be tighter than people assume. Many are drawn along a single corridor, sometimes to a defined distance from the kerb line, sometimes to the building line. A property fifty metres off the high street may sit outside the area while still being affected by it, and that distinction matters when you are arguing about whether an assessment is needed.

What the declaration says about the pollutant

Most English declarations relate to nitrogen dioxide, driven by road traffic. Some relate to particulate matter. A small number relate to sulphur dioxide near industrial sources.

The objectives sit in the Air Quality (England) Regulations 2000 and the amending regulations. For nitrogen dioxide the annual mean objective is 40 micrograms per cubic metre, with an hourly mean objective of 200 micrograms per cubic metre not to be exceeded more than 18 times a year. For particulate matter as PM10 the annual mean objective is also 40 micrograms per cubic metre, with a 24 hour mean of 50 micrograms per cubic metre not to be exceeded more than 35 times a year.

Knowing which objective is exceeded tells you what the council cares about. Where nitrogen dioxide is the issue, the council is thinking about traffic and combustion plant. Where particulate matter is the issue, construction dust and solid fuel appliances move up the agenda.

Local monitoring data and diffusion tubes

Councils monitor in two ways. Automatic analysers give continuous data at a handful of sites and are the more reliable record. Passive diffusion tubes, exposed monthly and analysed in a laboratory, give a much denser network at lower cost, and their results are adjusted using a national bias adjustment factor before they are reported.

Both appear in the council's annual status report, which is the document worth downloading. It lists each monitoring site with its identifier, grid reference, site classification and the annual mean for each year, usually with several years of history. That history is what you cite.

Two cautions. Diffusion tube data measures nitrogen dioxide only, so a report full of tube results says nothing about particulates. And the relevant question for planning is exposure at a receptor, so a tube on a lamp post at the kerb is not evidence of the concentration at a first floor bedroom window six metres back.

Action plans and their measures

A declaration triggers an air quality action plan setting out what the authority intends to do. Read it, because the measures in it often become the things your application is asked to contribute to: electric vehicle charging, delivery and servicing restrictions, low emission plant requirements, travel planning, or a contribution towards a wider scheme.

Action plans also tell you how the council thinks. An authority whose plan is built around traffic reduction will look hard at trip generation and parking. One whose plan targets combustion emissions will look hard at your boiler and any standby generator.

When an assessment is triggered

There is no national numerical trigger. In practice, an Air Quality Assessment is expected where a proposal introduces new exposure inside or close to a declared area, where it generates traffic above the screening criteria used in industry guidance, or where it introduces combustion plant or an extract system that could affect nearby occupiers.

The screening criteria most consultants and officers use come from the joint guidance published by the Institute of Air Quality Management and Environmental Protection UK on planning and air quality. It is guidance rather than policy, and councils that adopt it usually say so in a supplementary planning document.

For a change of use in a town centre the practical triggers tend to be these:

  1. New residential or other sensitive use within or adjoining a declared area.
  2. A material increase in vehicle movements, including delivery vehicles.
  3. New or replacement combustion plant, including kitchen equipment and generators.
  4. Demolition or construction generating dust near sensitive receptors.

Emissions from plant and from traffic

Commercial occupiers usually meet air quality through plant rather than traffic. Kitchen extract is the common case, and it brings odour and noise with it, so the same drawing set has to satisfy three separate concerns.

A Ventilation and Extraction Statement covers the system design: the canopy, the duct route, the filtration and odour control, the discharge point and its height and direction relative to openable windows. Where odour is the dominant concern, an Odour Assessment sets out the risk and the abatement, and environmental health officers will ask for one on almost any hot food use near flats.

Combustion plant has its own regime. Chimney height approval under the Clean Air Act 1993 applies to certain furnaces and boilers, and it is separate from planning permission. Emission limits for boilers and generators are commonly imposed through local plan policy in London and in authorities that have adopted low emission planning guidance.

The mapping tools that show designations around a site are worth running at the same time, and our note on using MAGIC to check designations around a site sets out that workflow.

Using the data in a supporting statement

Cite precisely or do not cite at all. A statement that says local air quality is generally good will be given no weight. One that names the monitoring site, its identifier, its classification and the annual mean for the last three reported years, taken from the council's own annual status report, is evidence.

Structure it in this order: the designation position, the monitoring evidence, the receptors, the emissions arising from the proposal, the mitigation, and the residual position. Say where the data ends. If the most recent reported year is two years old, say so rather than implying it is current.

And be honest about exposure. If your proposal puts a flat above a restaurant in a declared area, the useful answer is a ventilation strategy that takes supply air from the rear at high level, not an argument that the objective is nearly met.

Enter your postcode on PlanScope to see which reports a site in a declared area is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is an air quality management area?

It is an area declared by a local authority under Part IV of the Environment Act 1995 where one or more national air quality objectives are not being met. The declaration order defines the boundary and names the pollutant concerned. Declaration obliges the authority to produce an air quality action plan setting out the measures it will take to work towards the objectives.

What are the nitrogen dioxide objectives?

Under the Air Quality (England) Regulations 2000 and the amending regulations, the annual mean objective for nitrogen dioxide is 40 micrograms per cubic metre. There is also an hourly mean objective of 200 micrograms per cubic metre, not to be exceeded more than 18 times a year. Most English declarations relate to the annual mean objective and road traffic.

Are diffusion tube results reliable?

They are useful but limited. Diffusion tubes measure nitrogen dioxide only, are exposed monthly, and their results are adjusted using a national bias adjustment factor before reporting. They give a dense network at low cost. Continuous automatic analysers give the more reliable record. Neither tells you the concentration at a specific receptor unless the tube is sited there.

When does a change of use need an air quality assessment?

There is no national numerical trigger. In practice an assessment is expected where the proposal introduces sensitive use within or adjoining a declared area, where it materially increases vehicle movements including deliveries, where it introduces combustion plant or an extract system affecting nearby occupiers, or where demolition and construction would generate dust near receptors.

Do I need chimney height approval for a commercial boiler?

Possibly. Chimney height approval under the Clean Air Act 1993 applies to certain furnaces and boilers and is administered by the local authority separately from planning permission. Getting planning permission does not discharge it, and neither does discharging it satisfy planning. Check with the council's environmental health team before ordering plant.

Sources and further reading

air qualityaqmachange of usemonitoring dataextractionenvironmental health

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Data Tools How-To

View all →
Data Tools How-To8 min read

Finding trip rate data and using it defensibly

The output is only as good as the site selection. Record the land use category, the filters, the included sites and the reason for every exclusion, then offer a sensitivity test.

Read article →
Data Tools How-To7 min read

Using aerodrome safeguarding maps

Safeguarding maps sit with the local planning authority, and the triggers cover far more than tall buildings. Check the map before the layout is fixed, not after.

Read article →
Data Tools How-To7 min read

Checking railway and canal safeguarding near a site

Network Rail and the Canal & River Trust do not grant permission, but their requirements can make one undeliverable. Here is the check to run before the boundary is fixed.

Read article →
Data Tools How-To7 min read

Reading a drainage asset record from a water company

A sewer asset plan shows position, size and flow direction, and rarely much else. Here is how to request it, read it and verify what it leaves out.

Read article →
Data Tools How-To7 min read

Finding section 106 and levy spend data locally

Councils must publish an annual infrastructure funding statement showing what developer contributions were received, allocated and spent. Here is how to read one and what the numbers do not say.

Read article →
Data Tools How-To6 min read

Checking the Housing Delivery Test result for an area

The Housing Delivery Test measurement is published annually for every English authority, and the consequences for decision taking follow from which band it falls into. Here is how to find it and use it properly.

Read article →