Data Tools How-To

Checking an off-site unit on the biodiversity gain sites register

7 min readBy PlanScope Editorial Team

The register records the land, the habitat values, the securing mechanism and every allocation already made. Reading it properly is the due diligence most off-site unit buyers skip.

The biodiversity gain sites register is the public record of every off-site habitat scheme that can be counted towards the statutory 10 per cent gain in England. Natural England maintains it under Schedule 7A of the Town and Country Planning Act 1990, inserted by the Environment Act 2021. If you are buying off-site units, the register is where you confirm the site exists, the habitat works are legally secured, and the units you are paying for have not already been sold to someone else.

Buyers still turn up at gain plan stage with an invoice and no register entry. That is the wrong order.

What the register records

An entry is not a marketing listing. It records the land itself, by boundary and grid reference, together with the biodiversity value of that land before the works and the value those works are expected to reach. Values are split into the three currencies the statutory metric uses: area habitat units, hedgerow units and watercourse units. They are not interchangeable.

The entry also records the legal mechanism holding the habitat works in place for at least 30 years, the responsible body or local planning authority on the other side of that mechanism, and the habitat management and monitoring plan. Finally it records allocations: which developments have claimed which units.

That last field is the one buyers skip. An entry showing ten area habitat units created does not mean ten are available.

Searching for a site and reading the entry

Search by location first. The register lets you look for gain sites by area, and the distance from your development matters because of how the statutory metric treats spatial risk. The metric reduces the value of units delivered further from the development site, so a unit created outside your local planning authority area and outside the same national character area is worth less than its headline figure. Check the multiplier in the version of the metric current when your gain plan is submitted, because the metric is revised.

Then read the habitat detail. Trading rules in the metric require like for like or better. Units created as modified grassland cannot substitute for the loss of a species-rich grassland, and no amount of unit arithmetic gets around that. A Biodiversity Net Gain Assessment that shows a shortfall in one distinctiveness band has to be met by units in that band or higher.

Cross-check the site's surroundings while you are there. Designations, priority habitat and irreplaceable habitat near a gain site change what the responsible body will accept, and our guide to checking designations around a site on MAGIC covers the layers worth looking at.

How an allocation to a development works

Allocation is a formal step taken by the gain site owner, not by the developer. The owner applies to record on the register that a stated number of units from their site is allocated to a specific development, identified by its planning permission reference and local planning authority.

A single gain site can be allocated across many developments, in slices, until its units are exhausted. This is why the ordering matters: an allocation to your permission is the only thing that ties those units to you on the public record. A contract with the landowner is a private promise. The register entry is the evidence the local planning authority will look at when it considers your biodiversity gain plan.

Ask for the allocation to be recorded before final payment, or structure payment so the balance falls due on allocation.

Checking the securing mechanism

Off-site gains are secured either by a conservation covenant with a responsible body designated by the Secretary of State, or by a planning obligation under section 106 with the local planning authority for the area where the gain site sits.

Both work. They behave differently.

A conservation covenant binds successors in title and is enforced by the responsible body, which has its own monitoring obligations and its own charging structure. A section 106 agreement is enforced by the council, which may or may not have capacity to monitor a habitat 30 years out. Ask which mechanism applies, ask to see it, and check that the habitat works described in the agreement match those described in the register entry and in the habitat management plan. Mismatches between those three documents are common on early gain sites.

Check too that the responsible body named in a covenant appears on the government's published list of designated bodies. A covenant with an organisation that is not designated does not do the job.

Due diligence on the land and its management

The baseline condition of a gain site is assessed by survey, and the assessment must be carried out by a competent person. The Environment Act 2021 regime treats biodiversity net gain as work for a qualified ecologist, and a metric completed without a proper habitat condition assessment is the single weakest point in most off-site offers. Ask for the survey, the survey date and the surveyor's qualifications, and check the condition scores against the habitat descriptions rather than taking the output figures on trust.

Things worth confirming before you commit:

  • Who holds the long-term management liability, and whether it is funded or merely promised.
  • Whether the management plan has a monitoring schedule with reporting to the responsible body.
  • Whether the habitat creation has actually started, or whether the units are being sold against habitat that exists only on paper.
  • Whether any part of the site is already subject to another environmental obligation, such as nutrient mitigation or an agri-environment agreement, which cannot be double counted.
  • What happens if the habitat fails to reach its target condition at year 10 or year 20.

A Preliminary Ecological Appraisal of your own development site should be finished before you go shopping for units, because it tells you which habitats you are actually losing and therefore which units you need.

Timing against gain plan approval

The biodiversity gain condition is deemed to be attached to most planning permissions in England. It requires a biodiversity gain plan to be submitted to and approved by the local planning authority before development begins. The plan identifies the on-site gains, any registered off-site gains allocated to the development, and any statutory biodiversity credits purchased from the government.

Work backwards from that. The register allocation has to be in place before the gain plan can rely on it, the metric has to be completed against the version current at the time, and the authority has its own period to determine the plan. Leaving this to the month before a start on site is how schemes slip a quarter.

Statutory credits exist as the last resort in the hierarchy, and they are priced to be the expensive option. Treat them as a fallback rather than a plan.

When an allocation falls through

Allocations can be reversed, and gain sites can fail. If the habitat works are not delivered, or the securing mechanism is found to be defective, the units disappear and the condition still has to be discharged.

Three responses are available: find and allocate replacement units on another registered site, buy statutory credits, or revise the scheme to reduce the off-site requirement. All three cost money and time, which is the argument for spreading a large off-site requirement across more than one gain site rather than relying on a single supplier.

Biodiversity net gain is a report type where a competent person is legally required, so treat any AI-assisted draft as the starting point for that ecologist rather than a substitute. You can find reviewers through the professional directory.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What does the biodiversity gain sites register show?

It shows the gain site's boundary and location, the biodiversity value before and after the habitat works in area habitat, hedgerow and watercourse units, the legal mechanism securing the habitat for at least 30 years, the responsible body or local planning authority enforcing it, the habitat management and monitoring plan, and any allocations of units already made to specific developments.

How are off-site biodiversity units allocated to a development?

The gain site owner applies to record an allocation on the register, naming the number of units and the specific development by its planning permission reference and local planning authority. Developers cannot make the allocation themselves. Until the allocation appears on the register, a purchase contract is a private arrangement that the authority will not treat as evidence when it considers the biodiversity gain plan.

Do off-site units count less if they are far from the site?

Yes. The statutory biodiversity metric applies a spatial risk multiplier that reduces the value of units delivered further from the development, with the local planning authority area and the national character area used as the reference. Check the multiplier in the version of the metric current when your biodiversity gain plan is submitted, because the metric is periodically revised.

What secures an off-site gain site for 30 years?

Either a conservation covenant with a responsible body designated by the Secretary of State, or a planning obligation under section 106 with the local planning authority covering the gain site. Check that the habitat works described in the agreement match those in the register entry and the habitat management plan, and confirm any named responsible body appears on the published list.

What happens if a gain site fails to deliver?

The biodiversity gain condition still has to be discharged. Options are to allocate replacement units from another registered gain site, to buy statutory biodiversity credits from the government, or to revise the scheme so less off-site gain is needed. Statutory credits sit last in the hierarchy and are priced accordingly, so they work as a fallback rather than a strategy.

Sources and further reading

biodiversity net gainoff-site unitsgain sites registerconservation covenantdue diligencestatutory metric

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Data Tools How-To

View all →
Data Tools How-To8 min read

Finding trip rate data and using it defensibly

The output is only as good as the site selection. Record the land use category, the filters, the included sites and the reason for every exclusion, then offer a sensitivity test.

Read article →
Data Tools How-To7 min read

Using aerodrome safeguarding maps

Safeguarding maps sit with the local planning authority, and the triggers cover far more than tall buildings. Check the map before the layout is fixed, not after.

Read article →
Data Tools How-To7 min read

Checking railway and canal safeguarding near a site

Network Rail and the Canal & River Trust do not grant permission, but their requirements can make one undeliverable. Here is the check to run before the boundary is fixed.

Read article →
Data Tools How-To7 min read

Reading a drainage asset record from a water company

A sewer asset plan shows position, size and flow direction, and rarely much else. Here is how to request it, read it and verify what it leaves out.

Read article →
Data Tools How-To7 min read

Finding section 106 and levy spend data locally

Councils must publish an annual infrastructure funding statement showing what developer contributions were received, allocated and spent. Here is how to read one and what the numbers do not say.

Read article →
Data Tools How-To6 min read

Checking the Housing Delivery Test result for an area

The Housing Delivery Test measurement is published annually for every English authority, and the consequences for decision taking follow from which band it falls into. Here is how to find it and use it properly.

Read article →