Checking coal mining legacy data for a site

6 min readBy PlanScope Editorial Team

Being in a coal mining reporting area tells you records exist. Being in a development high risk area tells you the council will expect a risk assessment with the application.

Two mapped areas decide how much coal mining work your application needs, and they are not the same thing. A coal mining reporting area is the broad footprint where the national coal legacy body, the Coal Authority, since renamed the Mining Remediation Authority, holds and issues coal mining information. A development high risk area is a much smaller mapped area where recorded features could affect the stability of the ground beneath your site.

Inside a reporting area you can buy a report. Inside a development high risk area you need a coal mining risk assessment with the planning application, and the Authority becomes a statutory consultee.

Check which one you are in before you commission anything else.

What a reporting area actually means

It means records exist for the area and the Authority will issue a report for a property within it. Roughly speaking it follows the coalfields: the North East, Yorkshire, the East and West Midlands, Lancashire, Cumbria, Staffordshire, Warwickshire, Shropshire, Kent, the Forest of Dean and South Wales.

Being inside one is not itself a planning constraint. Plenty of land in a reporting area has no workings beneath it, and plenty has workings deep enough to be irrelevant to a two-storey house.

What the designation does is tell you to ask the question. Solicitors act on it for conveyancing. For development, it is the trigger to run the free map check and find out whether the site is also in the higher risk category.

The map walkthrough is set out in the coalfield interactive map before you buy a site, and it is the first ten minutes of any site appraisal in these areas.

Development high risk areas and what they trigger

A development high risk area is drawn around recorded features that could affect surface stability. Typical drivers are mine entries such as shafts and adits, coal workings at shallow depth, recorded geological features that could transmit movement, mine gas outbreak sites, and areas of spoil.

Two consequences follow inside one.

First, the council will expect a coal mining risk assessment to accompany the application. Most authorities in coalfield districts list it on their local validation checklist, and an application without one is commonly returned as invalid rather than refused.

Second, the Authority is consulted on the application as a statutory consultee under the procedures in the Development Management Procedure Order 2015. Its response is technical and specific: it will say whether it agrees the assessment has identified the features correctly and whether the proposed mitigation is acceptable, and it will ask for conditions where intrusive investigation is still outstanding.

Its comments carry real weight with officers, because the authority has no in-house expertise on mining legacy and the consultee does.

What goes in a coal mining risk assessment

The assessment is a desk-based document with a specific job: identify the coal mining features that could affect this development, and say what should be done about them.

A usable one contains:

  • a site description with the proposed development, foundation type and any basement or below-ground works
  • a review of the coal mining information, including mine abandonment plans, borehole records and reported hazards
  • the depth, seam names and recorded extent of workings beneath and adjacent to the site
  • the position and, where known, the treatment history of any mine entry, with its zone of influence plotted against the proposed layout
  • an assessment of mine gas potential
  • a conclusion on risk to the development and the neighbouring land
  • a recommendation for intrusive investigation, or a reasoned conclusion that none is needed

The last point is where these documents are weakest. An assessment that concludes no further work is needed, on a site where the seam is 15 metres down and the records are from the 1870s, will attract a consultee objection. Better to recommend a proportionate investigation and get a condition than to argue the point at appeal.

Ground conditions for foundation design overlap heavily, so commission the geotechnical assessment and the mining work together. One rig visit answering both questions is a great deal less expensive than two.

Reading the report: entries, workings and hazards

Three categories of finding drive decisions.

Mine entries are the sharpest. A shaft or adit carries a zone of influence, derived from its depth and the geology, within which building is normally unacceptable unless the entry has been located, proved and treated. Historic capping is not the same as modern treatment, and a capped shaft under a 1960s garage is a common and expensive discovery. Treatment usually means excavation to sound strata, a reinforced concrete cap and a gas vent, designed and verified.

Shallow workings are the commonest finding. Where a seam was worked within a depth that could affect surface stability, the response is drilling on a grid to prove the workings and grouting to fill voids, followed by a verification record. The cost is driven by area and depth, so a layout that keeps buildings off the worst part of the site saves more than any negotiation.

Mine gas is the least visible. Methane, carbon dioxide and oxygen-depleted air can migrate along workings and fissures, and the response is a gas monitoring regime and, where indicated, protection measures under the relevant British Standard with independent verification on site. Where the ground is also contaminated from a previous use, the gas and contamination work should be scoped together, alongside the contaminated land assessment.

The permit you need before you drill

Coal and associated mining property are vested in the Authority under the Coal Industry Act 1994. Intrusive activity that enters coal, coal mine workings or a mine entry needs a permit from the Authority, and that includes ground investigation boreholes, grouting and piling.

Build the permit into the programme rather than discovering it when the rig is booked. The application needs the site location, the proposed works, the depths and a method statement, and the Authority may attach conditions about how voids are treated and how boreholes are sealed.

The same forward planning applies to other utility and records enquiries on a site, which is the point made in ordering sewer records and pre-development enquiries.

What the data does not tell you

Four limits, each of which has caught developers out.

Records are records. Systematic deposit of abandonment plans came late in the nineteenth century, so bell pits, adits and shallow pillar and stall workings from earlier periods frequently appear nowhere. On old coalfield margins, absence of a record tells you almost nothing.

Coal only. Metalliferous mining, limestone and chalk extraction, brine pumping, gypsum and clay workings all sit outside coal mining reports and need separate enquiry, usually starting with British Geological Survey data and the local authority's own records.

No risk assessment. A mining report is an information product. It does not assess the effect of recorded features on your particular building, your foundation design or your basement, which is the job of the risk assessment and the site investigation.

No guarantee. Treatment verified 30 years ago to the standards of the day may not satisfy a structural engineer now, and the report will not tell you that.

So treat the data as the starting point for a proportionate investigation rather than as an answer. On a coalfield site the honest position at planning stage is usually that the features are identified, the risk is understood, and the confirmation comes from the ground.

Enter your postcode on PlanScope to see which reports your site is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the difference between a reporting area and a development high risk area?

A coal mining reporting area is where the Authority holds and issues coal mining information, which covers the coalfields broadly. A development high risk area is a smaller mapped area where recorded features such as mine entries, shallow workings or hazards could affect surface stability. Only the second triggers the consultation requirement and a coal mining risk assessment.

Do I need a coal mining risk assessment for a single house?

If the site is inside a development high risk area, yes, regardless of scale. The assessment is a planning submission document, not a building control one, and councils commonly refuse to validate applications without it. Outside a high risk area it is not normally required, though a mining report is still worth obtaining for a purchase.

Can I drill boreholes without asking anyone?

Not into coal, coal mine workings or a mine entry. Coal and the associated property rights are vested in the Authority under the Coal Industry Act 1994, so intrusive work that enters them needs a permit. Apply before you programme the site investigation, because the permit is a separate process with its own lead time.

Does a mining report cover tin, lead or limestone workings?

No. Coal mining reports cover coal. Other mineral extraction, including metalliferous mining, limestone, chalk, brine and gypsum, is outside them and needs separate enquiry. British Geological Survey data is the usual starting point, alongside local authority records and, in some districts, specific compensation or subsidence arrangements.

What if the site has unrecorded workings?

That is the normal position for very old mining. Plans were not systematically deposited before the late nineteenth century, so shallow workings and bell pits from earlier periods often appear on no record at all. A risk assessment should say so plainly and recommend intrusive investigation proportionate to the geology rather than concluding no risk from an absence of records.

Sources and further reading

coal miningground stabilityhow-tosite investigationself-build

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Data Tools How-To

View all →
Data Tools How-To8 min read

Finding trip rate data and using it defensibly

The output is only as good as the site selection. Record the land use category, the filters, the included sites and the reason for every exclusion, then offer a sensitivity test.

Read article →
Data Tools How-To7 min read

Using aerodrome safeguarding maps

Safeguarding maps sit with the local planning authority, and the triggers cover far more than tall buildings. Check the map before the layout is fixed, not after.

Read article →
Data Tools How-To7 min read

Checking railway and canal safeguarding near a site

Network Rail and the Canal & River Trust do not grant permission, but their requirements can make one undeliverable. Here is the check to run before the boundary is fixed.

Read article →
Data Tools How-To7 min read

Reading a drainage asset record from a water company

A sewer asset plan shows position, size and flow direction, and rarely much else. Here is how to request it, read it and verify what it leaves out.

Read article →
Data Tools How-To7 min read

Finding section 106 and levy spend data locally

Councils must publish an annual infrastructure funding statement showing what developer contributions were received, allocated and spent. Here is how to read one and what the numbers do not say.

Read article →
Data Tools How-To6 min read

Checking the Housing Delivery Test result for an area

The Housing Delivery Test measurement is published annually for every English authority, and the consequences for decision taking follow from which band it falls into. Here is how to find it and use it properly.

Read article →