Templates, Checklists and Examples

Checklist for a tree works application under a TPO

7 min readBy PlanScope Editorial Team

TPO applications are free and decided in eight weeks, but vague descriptions get them refused. Here is the evidence that gets consent granted as proposed.

Works to a tree protected by a Tree Preservation Order need written consent from the local planning authority before anything is cut. The application is made under the Town and Country Planning (Tree Preservation) (England) Regulations 2012, there is no fee, and the authority has eight weeks to decide. Cutting down, topping, lopping, uprooting or wilfully damaging a protected tree without consent is a criminal offence under section 210 of the Town and Country Planning Act 1990, and the duty to plant a replacement under section 206 follows removal whether or not consent was given.

A tree in a conservation area that is not covered by an Order is a different procedure: a section 211 notice giving the authority six weeks to decide whether to make an Order. Do not mix the two up on the form.

Confirming the tree is protected, and by what

Three possibilities, and they need different paperwork.

An Order protects a specified tree, group, area or woodland. The authority holds the Order with a plan and a schedule, and you are entitled to see it. Ask for the Order number, the schedule entry and the plan, and check that the tree you want to work on is the one listed. Orders made decades ago sometimes describe trees that have since been felled or that were never there, and an area designation can protect everything that was standing at the date the Order was made but not later self-seeded growth.

A conservation area tree with a trunk diameter over 75 millimetres, measured at 1.5 metres above ground, needs a section 211 notice rather than an application, with a lower threshold applying where the work is thinning to improve the growth of other trees.

A planning condition or a section 106 obligation can also protect trees on a development site, and breach of those is enforced differently again.

Check the authority's own records rather than relying on a neighbour, an estate agent's pack or a conveyancing search alone. Where the tree stands on a neighbour's land and overhangs yours, your common law right to abate a nuisance by cutting back to the boundary does not override the Order. You still need consent.

Describing the works precisely

The most common reason a TPO application is refused or returned is a vague description.

Write the specification as an arboriculturist would, species by species and tree by tree, using the Order's reference numbers. State the operation, the extent and the reason. So not "reduce the oak" but "T4 pedunculate oak: crown reduce lateral branches on the south-east aspect by up to 2 metres, retaining natural form, in accordance with BS 3998:2010". Not "cut back the lime" but "T7 common lime: remove epicormic growth to 3 metres and crown lift to 4.5 metres over the highway".

Include the timing. Works in the bird nesting season from March to August need a pre-works check, and bats in cavities or under loose bark are protected independently of the Order, so a bat assessment may be needed on veteran or cavity-bearing trees. A protected species survey and any licence require a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017.

Arboricultural justification and reports

The authority is weighing the amenity value of the tree against your reason for the work. Give it something to weigh.

For routine pruning, a short arboricultural specification and a statement of purpose is usually enough. For felling or heavy reduction, expect to need more:

  • A condition report covering species, age class, height, stem diameter, crown spread, vitality and structural condition.
  • The defect or conflict relied on, described and photographed, with any decay detection results.
  • The management options considered and why the proposed work is the least intervention that resolves the problem.
  • The replacement planting proposal.
  • Where subsidence is claimed, engineering and soil evidence linking the damage to the tree, including root identification and a soil plasticity assessment. A claim unsupported by that evidence will not succeed.

Where the works relate to a development proposal, the evidence belongs in an arboricultural impact assessment prepared to BS 5837:2012 rather than in a bare TPO application, and the product's tree survey and arboricultural impact assessment page sets out what that document covers. Councils usually expect a suitably qualified author for this kind of report, and professional review is strongly advised.

Photographs and the tree plan

A plan and photographs do more work than the narrative.

Supply a site plan showing the tree positions with the Order reference numbers, the buildings, boundaries and any hard surfaces, at a stated scale. Add photographs taken from at least two directions, with the target branches or defects marked up on the image. Where crown reduction is proposed, an annotated photograph showing the proposed finished outline is the single most useful document you can submit, because it removes the ambiguity that produces a refusal or an over-restrictive condition.

Keep the file sizes sensible and name the files clearly. An officer who cannot work out which photograph shows which tree will ask, and that costs a fortnight.

Replacement planting proposals

Offer replacement planting with any felling application, even where you think it is not required.

State the species, nursery stock size, planting position, staking and protection, the establishment maintenance period and who is responsible. Where the original tree was large, a like-for-like replacement is rarely realistic on a domestic plot, so propose a species suited to the available rooting volume and say why. BS 8545 covers trees from nursery to independence and is the reference for establishment.

An application that offers nothing invites a condition requiring a replacement the authority chooses. An application that proposes something sensible usually gets it approved as proposed.

Determination, exemptions and the appeal route

The authority has eight weeks from a valid application. If it has not decided by then, you have a right of appeal to the Secretary of State, dealt with by the Planning Inspectorate.

A refusal, or a consent with conditions you cannot live with, can also be appealed. The appeal period is stated on the decision notice and is normally 28 days, which is much shorter than the period for a planning appeal, so diarise it the day the decision arrives.

Three exemptions are worth knowing, and all three are narrower than people assume. Dead trees are exempt but you must give the authority five days notice before the work except in an emergency. A tree that is an immediate risk of serious harm is exempt, with notice given as soon as practicable afterwards. Works to abate a nuisance are exempt only to the extent necessary, and a private law nuisance is not the same as inconvenience. In each case photograph the evidence before the saw touches the tree, because the burden of proving the exemption falls on you.

Where neighbours are affected, a conversation first avoids most of the objections, and the neighbour engagement template is a useful starting point.

An illustrative submission checklist

Treat this as illustrative and check it against your authority's requirements.

  1. Confirm the Order number, schedule entry and plan, or establish that a section 211 notice is the right route instead.
  2. Complete the tree works application form with no fee payable.
  3. Site plan at a stated scale showing tree positions with Order references.
  4. Annotated photographs from two or more directions, with target branches marked.
  5. Works specification tree by tree, referencing BS 3998:2010 operations.
  6. Arboricultural condition report where felling or heavy reduction is proposed.
  7. Supporting engineering and soil evidence where subsidence is relied on.
  8. Replacement planting proposal with species, size, position and aftercare.
  9. Nesting bird and bat position, with a survey where the tree has roost potential.
  10. Diarise the eight week determination date and the appeal period on the decision.

This is general guidance, not legal advice. Check the position with your local planning authority's tree officer or a qualified arboriculturist before relying on it.

Browse the tree and landscape report types on PlanScope and draft the supporting evidence in minutes.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is there a fee for a TPO application?

No. An application for consent to carry out works to a tree protected by a Tree Preservation Order is free. The authority has eight weeks to determine it under the Town and Country Planning (Tree Preservation) (England) Regulations 2012, and if it fails to decide within that period you have a right of appeal to the Secretary of State.

What is the difference between a TPO application and a section 211 notice?

A TPO application seeks consent for works to a tree already protected by an Order. A section 211 notice applies to a tree in a conservation area that is not covered by an Order, with a trunk diameter over 75 millimetres measured at 1.5 metres, and gives the authority six weeks to decide whether to make an Order before you can proceed.

Can I cut back a protected tree that overhangs my garden?

Not without consent. The common law right to abate a nuisance by cutting back to the boundary does not override a Tree Preservation Order, and the nuisance exemption in the Regulations is narrower than general inconvenience. Apply for consent, and if you rely on an exemption, photograph the evidence before any work begins.

How do I appeal a refusal?

To the Secretary of State, through the Planning Inspectorate. The period is stated on the decision notice and is normally 28 days, far shorter than the period for a planning appeal, so diarise it the day the decision arrives. You can appeal a refusal, a condition you cannot accept, or a failure to decide within eight weeks.

Do I have to replace a tree I am allowed to fell?

Usually yes. Section 206 of the Town and Country Planning Act 1990 imposes a duty to plant a replacement where a protected tree is removed, including removal under an exemption. Offer a replacement proposal with the application, stating species, stock size, position, protection and aftercare, so the authority approves what you have chosen.

Sources and further reading

tpotreeschecklistarboriculturehouseholdertree preservation order

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Templates, Checklists and Examples

View all →
Templates, Checklists and Examples7 min read

Checklist for responding to planning objections

An applicant's response to objections is a sorting exercise first. Answer the material points with dimensioned evidence, acknowledge private law issues in one neutral sentence, and offer conditions where you cannot prove a point.

Read article →
Templates, Checklists and Examples6 min read

Checklist for handover of planning documents at completion

The planning file handed over at completion is what a buyer's solicitor asks for years later. Here is the index, and the records that are hardest to recreate.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a demolition prior notification submission

A demolition prior notification is narrow by design. The authority can consider only the method of demolition and the proposed restoration of the site.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a larger home extension prior approval

A single storey rear extension deeper than 3m on a semi, or 4m on a detached house, needs prior approval under Class A. Here are the limits, the information to supply and how the neighbour consultation timetable works.

Read article →
Templates, Checklists and Examples7 min read

Checklist for responding to an invalid application notice

Until an application is validated there is no determination clock. Here is how to sort each item on an invalidity notice, decline requests that are not on the published local list, and protect the validation date.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a written representations appeal bundle

A paper appeal is read once, in order, without you there. Here is how to structure the statement of case, build a numbered core documents list and index the bundle so every assertion is checkable.

Read article →