Professionals and Qualifications

Choosing an arboriculturist and reading their credentials

6 min readBy PlanScope Editorial Team

There is no protected title in arboriculture, so the checks are yours to make. Qualifications, membership grades, the drawings you actually need and the quotation red flags.

The first thing to work out is whether you are hiring a consultant or a contractor, because the two do different jobs and hold different qualifications. A contractor climbs, prunes and fells, and holds practical certificates for chainsaw and aerial work. A consultant surveys trees, writes reports and produces the drawings a council asks for with a planning application. Asking a contractor for an arboricultural impact assessment, or a consultant to take a limb off, wastes everybody's time.

For a householder application affected by a tree, what you almost always need is a consultant who works to BS 5837:2012, the British Standard on trees in relation to design, demolition and construction. That standard sets out the survey, the categorisation of trees, the root protection area calculation and the protective measures, and a report that does not reference it is unlikely to satisfy a case officer.

Qualifications that indicate consultancy competence

Arboriculture has a ladder of qualifications, and the useful signal is the level rather than the initials.

Level What it indicates Typical use
Practical certificates for chainsaw and aerial work Trained for the physical work Contractors carrying out pruning and felling
Technician-level diploma in arboriculture Sound working knowledge of tree biology and management Survey work under supervision
Higher diploma or degree in arboriculture Assessment, report writing and design interaction Consultancy, including BS 5837 reports
Professional tree inspection certificate Trained in condition and hazard assessment Tree safety inspections rather than planning reports
Chartered status through a forestry or arboricultural institute Assessed professional competence and continuing development Complex or contested cases

A tree safety inspection qualification is not the same as competence in planning work. The two overlap but they answer different questions: one is about whether a tree is likely to fail, the other about how a development and a tree can coexist.

Professional body membership and what each grade means

The Arboricultural Association operates graded membership. Associate grades reflect an early career position, full Member status carries the designation MArborA, and Fellow is the senior grade. The letters after a name therefore tell you something about assessed experience rather than just subscription.

Chartered status through a forestry or arboricultural institute is the other marker, and it brings a code of conduct and a continuing professional development requirement with it.

Neither membership nor chartered status is a legal requirement. There is no protected title in arboriculture, so anyone may describe themselves as a tree consultant. That is precisely why the check matters, and our note on what competent person means in planning legislation explains where the law does impose a competence requirement and where it leaves it to the council's judgement.

Registered consultant schemes

The Arboricultural Association runs a registered consultant scheme with an assessment process covering technical knowledge, report quality and professional practice. Registration is a stronger signal than membership alone, because someone has reviewed the applicant's actual work.

Ask two questions about any scheme a consultant cites: whether registration required an assessment of submitted reports, and when it was last renewed. A scheme that only requires a fee tells you nothing.

Distinguishing a consultant from a tree contractor

Some firms do both, which is fine, but the conflict needs managing. A free survey offered by a company that also quotes for the felling has an obvious incentive problem, and a council reading a report that recommends removal of the only tree constraining the layout will notice who wrote it.

What to look for on each side:

  • A consultant should hold professional indemnity insurance, produce reports and drawings, and have no financial interest in the works recommended
  • A contractor should hold practical certificates, public liability insurance and, for larger jobs, an approved contractor accreditation, and should work to a specification someone else has written
  • Where one firm does both, the survey and the works quotation should be separately priced and separately dated

Checking experience of the specific drawing you need

This is where most householders under-specify, and then receive a document the council rejects. Ask for a sample of the exact deliverable, redacted if necessary.

  1. A tree survey schedule listing every tree with a reference number, species, dimensions, condition and BS 5837 category
  2. A tree constraints plan showing root protection areas and canopy spreads to scale
  3. An arboricultural impact assessment relating the proposed layout to each retained tree
  4. An arboricultural method statement with tree protection details and a schedule of works
  5. A tree protection plan that a contractor can actually build from

A quotation for "a tree report" that does not name these outputs is a quotation you cannot compare with another. Councils typically ask for specific documents by name on their validation lists, so get the list first and buy against it. Our note on checking whether a survey is still valid covers how long the resulting data lasts.

Ask also whether the consultant has worked on applications with your council. Local validation lists vary, and a consultant who has had reports accepted there will know what the tree officer expects.

Insurance and the scale of your project

Professional indemnity cover should be in place and proportionate to the value of what could go wrong. On a single extension near one protected tree, the exposure is the cost of redesign and delay. On a plot where a tree constrains the position of the whole building, it is larger.

Ask for the level of cover and the renewal date, and check it covers the type of advice you are buying. Some policies exclude certain activities, and a consultant who cannot answer the question quickly may not have read their own policy.

Warning signs in a quotation

Several of these come up repeatedly, and each is a reason to ask another question rather than to walk away immediately.

  • No reference to BS 5837:2012, or a reference to a superseded edition
  • A price given without any idea how many trees are involved or whether they are protected
  • No site visit included, with the survey offered from aerial imagery
  • A promise about the planning outcome, which nobody can give
  • Text in a sample report that plainly belongs to another site, including a different species list
  • No mention of root protection area calculations or of category grading
  • A survey bundled free with a quotation for felling work
  • No professional indemnity insurance stated

One more practical point. A consultant cannot tell you whether a tree is protected by a preservation order; only the council's own records can, and trees in a conservation area are protected separately with a notice requirement before work. Check that yourself before you commission anything, because it changes the scope of the report.

As an illustrative example, a rear extension within the root protection area of a neighbour's protected sycamore needs a tree survey, a constraints plan, an impact assessment and a method statement with a no-dig construction detail. A quotation covering a survey alone, at a price that looks attractive, leaves three of those four documents unbought and the application unvalidated.

Councils usually expect a suitably qualified author for arboricultural work, and professional review is strongly advised before submission. A tree survey page sets out what the document covers, reviewers can be found through the professional directory, and the wider document set for an application is listed under the 66 report types.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What does MArborA mean?

It is the designation for full Member grade of the Arboricultural Association, which sits above the associate grades and below Fellow. It reflects assessed experience rather than simply paying a subscription. Membership is not a legal requirement, because arboriculture has no protected title, which is why checking qualifications and sample work matters.

Do I need a consultant or a contractor?

A consultant for surveys, reports and the drawings a council asks for; a contractor for pruning, felling and physical works. Consultants hold academic and professional qualifications plus professional indemnity insurance. Contractors hold practical certificates and public liability cover. Where one firm offers both, have the survey and the works quotation priced separately.

Which documents should I be buying?

Check the council's validation list first, then buy against it. Typically a tree survey schedule with every tree referenced, species, dimensions, condition and category, a tree constraints plan with root protection areas to scale, an arboricultural impact assessment, a method statement with protection details, and a tree protection plan a contractor can build from.

Is a tree safety inspection qualification enough for planning work?

Not on its own. A tree inspection certificate trains someone to assess condition and the likelihood of failure, which is a different question from how a development and a retained tree can coexist. For planning work, look for a higher diploma or degree in arboriculture, professional membership and experience of BS 5837 reports.

Can the consultant tell me if my tree is protected?

No. Only the council's own records confirm whether a tree preservation order applies, and trees in a conservation area are protected separately with a notice requirement before work. Check that yourself before commissioning, because protection status changes the scope of the report and the consents you will need.

Sources and further reading

treesarboriculturebs 5837professionalsqualifications

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Professionals and Qualifications

View all →
Professionals and Qualifications6 min read

Checking a consultant's membership and currency

Letters after a name tell you somebody passed an assessment once. Currency, indemnity cover and the right institute are what protect you.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and who can sign one

An odour risk assessment needs dispersion judgement as well as ductwork knowledge. The two skills rarely sit in the same person, and almost never in the supplier.

Read article →
Professionals and Qualifications7 min read

Transport evidence: who signs a trip generation note

A trip generation note is only as good as the judgement behind the site selection. Here is the competence highway authorities look for and what to put in the brief.

Read article →
Professionals and Qualifications6 min read

Whole life carbon assessment competence and scope

The RICS whole life carbon standard fixes the modules, the 60 year study period, the data rules and the reporting format. Most differences between assessments come from scope choices, not arithmetic.

Read article →
Professionals and Qualifications7 min read

Overheating assessments and CIBSE TM59 competence

Nobody is licensed to run a CIBSE TM59 overheating assessment, so competence is judged on the inputs. The weather file, assumptions schedule and per-room results are the places to look.

Read article →
Professionals and Qualifications6 min read

What MRTPI tells you about a planning agent

Chartered membership of the Royal Town Planning Institute signals assessed competence and a binding code of conduct. It is not a financial remedy, and planning consultancy has no protected title at all.

Read article →