Transport, Highways and Parking

Choosing and defending TRICS trip rates

6 min readBy PlanScope Editorial Team

Highway officers read the appendix first. Land use categories, the filters that move the rate, rank order graphs, existing use credit and the scoping note that prevents the argument.

A TRICS trip rate is only as defensible as the site selection behind it, and highway officers know exactly where to look. They open the appendix, count how many survey sites you used, read the filters and ask why the sites that would have raised the rate are missing. Get the selection right and the rest of the transport case follows. Get it wrong and every downstream number, from junction capacity to parking demand, is contaminated.

The habit that prevents most of this is unglamorous. Agree the methodology in writing before you run the query.

What the highway officer is actually checking

Four things, in this order.

Whether the land use category matches the proposal. Whether the filters produce a comparator set that resembles the application site. Whether the sample is large enough to mean anything. And whether the exclusions were made for stated reasons rather than to move the answer.

That last point is the one that sinks reports at appeal. An inspector reading a transport case can see when four sites were dropped without explanation, and the natural inference is not flattering.

Getting the land use category right

TRICS land use categories are more specific than most proposals. Privately owned houses and privately owned flats generate different rates, and mixing them into one query to get a bigger sample defeats the purpose. Retail categories separate food superstores from discount food stores from retail parks. Employment categories separate offices from business parks from industrial units.

Two errors recur. The first is choosing a category by the name of the operator rather than by the activity. The second is treating a mixed scheme as one land use, when the honest approach is to run each element separately and sum them, with an explicit and stated allowance for linked trips where the evidence supports one.

Where the proposal has no good match, say so. A transport case that explains why the closest category is imperfect, and then tests sensitivity around it, reads far better than one that pretends the fit is exact.

The filters that change the answer

Every filter is an argument you are making about comparability, so make each one deliberately and record the reasoning.

  • Region and area type, which is where most disputes start. A suburban site in the north of England and an edge of town site in the south east are not interchangeable, and the highway authority will have a view.
  • Location type, meaning town centre, edge of town centre, suburban area, neighbourhood centre, edge of town or free standing. This filter usually moves the rate more than any other.
  • Survey date range, since travel behaviour shifted after 2020 and older surveys attract challenge on that basis. State your cut-off and defend it.
  • Days of the week surveyed, separating weekday from Saturday counts rather than averaging across them.
  • The size range of the independent variable, whether that is dwellings, gross floor area or bed spaces. Selecting sites of broadly similar size to the proposal is more persuasive than a wide range with a convenient average.
  • Population within one mile and five miles, and car ownership levels, both of which let you match the catchment rather than only the site.
  • Parking provision at the survey sites, which matters enormously for retail and employment uses.

Record the filter settings in a table in the appendix, not in prose. Officers check them line by line, and a table makes their job faster, which makes your consultation response faster too.

Averages, regressions and the site you cannot include

TRICS offers arithmetic average rates and, where the data supports it, trip rate regression. Regression is stronger when the relationship between size and trips is not linear, which is common in residential development where larger schemes generate proportionally fewer trips per dwelling. Where you use regression, show the fit and the sample, and be honest when the fit is weak.

The rank order graph is the tool to reach for when a highway authority alleges cherry-picking. It shows every site in the selected set in order of trip rate, so you can point to where your chosen sites sit within the distribution rather than asserting they are representative.

Excluding a site is legitimate when there is a stated reason: a survey affected by roadworks, a site with an unusual on-site constraint, a count that includes a shared access serving something else. Excluding a site because it is the highest is not. Write the reason for every exclusion in the report, and accept that a reason nobody would have accepted verbally will not survive in writing either.

Sample size deserves a sentence of its own. A rate derived from two or three sites is fragile, and a highway authority is entitled to treat it as such.

Existing use credit and the extant lawful use

Netting off the trips generated by the existing use is normal practice, and it is also where transport cases are most often overstated.

Three questions decide how much credit is reasonable. Is the existing use lawful, which usually means an extant permission or an established use. Is it currently operating, or has the building been vacant for years, in which case the highway authority may argue the trips are not really being removed from the network. And could the existing use lawfully resume at the level you are claiming, at the intensity you have assumed?

Where a building has been vacant, survey data from a comparable operating site, or the operator's own historic records, carries more weight than a TRICS derived theoretical figure. Set out the basis plainly and expect it to be tested.

Illustrative example: a scheme of 60 flats on a former builders merchant claims a credit for the merchant's vehicle movements including heavy goods vehicles. The highway authority accepts the car element, questions the goods vehicle element because the yard had been closed for four years, and asks for a sensitivity test with no credit at all. Running that test at the outset, and showing the junction still works, would have saved a round of consultation.

Making the numbers survive scrutiny

Scope first. Write to the highway authority with your proposed land use categories, filters, survey date range, assessment years, peak hours and the junctions to be modelled. Ask them to confirm. A short agreed scoping note is worth more than twenty pages of justification later, and it is the difference between a transport assessment that gets read and one that gets argued with.

Then publish your working. Include the full TRICS output, the site list with addresses and dates, the filter table, the rank order graph and the calculation sheet. Where the scheme falls below the threshold for a full assessment, a transport statement still benefits from the same transparency at a smaller scale.

Finally, connect the trip rates to the mitigation. If the rates support a lower parking provision, back that with a parking survey using a recognised methodology rather than assertion, and secure the behavioural element through a travel plan with monitoring and named targets. Numbers without a mechanism are just numbers.

A transport assessment normally needs a suitably qualified transport planner, and councils expect one. An AI-assisted draft can carry the policy narrative, the site description and the structure, and it flags where site data is missing rather than inventing it, but the trip generation work and the modelling belong to the specialist. For specialist technical reports, qualified professional input may be required.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which transport documents your site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How many TRICS survey sites do I need?

There is no fixed minimum, but a rate derived from two or three sites is fragile and highway authorities treat it as such. Aim for a set large enough that removing any single site does not materially move the average, and show the rank order graph so the reader can see where your sites sit in the distribution.

Can I exclude TRICS sites from my selection?

Yes, where you state a reason: a survey affected by roadworks, an unusual site constraint, or a count taken at a shared access serving other uses. Write the reason for every exclusion into the report. Excluding a site because it produces the highest rate is not a reason, and inspectors spot unexplained gaps in a site list quickly.

Which TRICS filter has the biggest effect on the rate?

Location type usually moves it most, since town centre, suburban, edge of town and free standing sites behave very differently. Region, survey date range, the size range of the independent variable and parking provision at the surveyed sites all matter too. Record every filter setting in a table in the appendix.

Can I net off trips from the existing use?

Often, but the credit has to be justified. The highway authority will ask whether the existing use is lawful, whether it is currently operating or has been vacant for years, and whether it could lawfully resume at the intensity claimed. Where a building has been empty, expect a sensitivity test with reduced or no credit.

Should I use average trip rates or regression?

Regression is stronger where the relationship between scheme size and trips is not linear, which is common in residential development. Averages are simpler and often adequate for smaller sites. Whichever you use, show the sample, show the fit and say plainly when the fit is weak rather than presenting a single headline figure.

Sources and further reading

tricstrip ratestransport assessmenthighwaystravel planplanning consultant

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Transport, Highways and Parking

View all →
Transport, Highways and Parking6 min read

Temporary traffic orders for construction works

A construction programme usually needs four separate highway permissions, each under a different power. What each one covers, how long it lasts and what happens when works overrun.

Read article →
Transport, Highways and Parking8 min read

Highway drainage for a new rural access

Highway authorities treat run-off and material transfer onto a rural lane as a safety matter. The design comes down to the levels in the first few metres and the consent position for the roadside ditch.

Read article →
Transport, Highways and Parking7 min read

Car club and travel voucher contributions

The money is simple. The on-street bay needs a traffic regulation order the developer cannot deliver, and the operator may never come forward.

Read article →
Transport, Highways and Parking7 min read

Gated accesses and emergency service override

Three bodies have a view on a gated access: the highway authority, the fire service and the waste service. Design for all three before the driveway is drawn.

Read article →
Transport, Highways and Parking7 min read

Blocking back and queue length at a junction

A capacity ratio tells you how hard an arm is working. Only the queue in metres, compared against measured storage, tells you whether the junction behind will block.

Read article →
Transport, Highways and Parking7 min read

Which design vehicles to test in a swept path analysis

A tracking drawing is only as good as the vehicle chosen. The routine and occasional movements to test, and the parked car case most submissions omit.

Read article →