Choosing assessment dates for sunlight studies

6 min readBy PlanScope Editorial Team

BRE 209 anchors its sunlight and overshadowing tests to 21 March. Here is why the equinox is the default, what summer and winter plots add, and the clock time and true north errors that undermine a study.

Sunlight assessment dates are not a matter of preference. The default is 21 March, because BRE 209 sets its sunlight and overshadowing tests at the spring equinox, and an assessment plotted on a different date without explanation invites the objection that the modeller picked a flattering day. Where a council's own guidance names additional dates, those are added to the equinox rather than substituted for it.

The date question sounds procedural. It decides outcomes, because shadow length at this latitude roughly triples between midsummer and midwinter, and a scheme that looks harmless in June can bury a garden in December.

Why the equinox is the standard date

On 21 March the sun follows a path close to the annual average, and the same path repeats around 21 September. Modelling one date therefore describes two, and it sits between the extremes rather than at either of them.

The two BRE tests that use it are worth stating precisely. For amenity space, at least half the area should receive at least two hours of sunlight on 21 March. Where an existing space already meets that and a proposal reduces the sunlit area to less than 0.8 times its former value, the loss is treated as noticeable. The same 0.8 relative threshold runs through the window-based sunlight tests, which work on annual probable sunlight hours rather than on a single day.

That combination of an absolute test and a relative test is why the equinox matters so much. Both halves of the amenity test are anchored to it, so a study run on any other date cannot answer the question the guidance asks. The window-based side of the analysis, including the winter probable sunlight hours split, belongs with the wider Daylight and Sunlight Assessment rather than with shadow plots.

What the summer and winter dates add

Neither 21 June nor 21 December forms part of the BRE numerical tests. Both are still worth plotting, for different reasons.

June shows the best case, and it is the honest answer to an applicant who says the courtyard will be usable in summer. It also shows where a tall element casts a shadow across a neighbouring garden in the early evening, which is when people are actually outside.

December shows the worst case. Low sun angles produce very long shadows, and a December plot is what an objector will produce at committee if you do not. Including it and explaining it is a stronger position than omitting it and being asked why.

A useful discipline: if you plot June and December, say plainly that they are context rather than compliance, and keep the compliance conclusion anchored to the equinox.

Dates and intervals councils specify

Local guidance varies and it overrides your default. Some authorities require plots at additional dates, some specify intervals, and some ask for sun-on-ground diagrams in addition to shadow outlines.

Output Common requirement
Shadow plots 21 March, hourly from sunrise to sunset
Supplementary shadow plots 21 June and 21 December where amenity space is affected
Sun-on-ground diagram Percentage of amenity area receiving two or more hours on 21 March
Transient overshadowing Existing and proposed cases shown side by side at the same time steps
Window sunlight Annual probable sunlight hours, with the winter months shown separately

Check the supplementary planning document before you start. Redoing a set of plots because the council wanted half-hourly intervals costs a fee round and a committee cycle, and the requirement is usually written down somewhere.

Time intervals and how many to plot

Hourly is the working standard. Half-hourly is worth using where a shadow crosses a small garden quickly, because hourly steps can miss the moment of worst effect entirely.

Run the plots between sunrise and sunset for the date, not between arbitrary office hours. A set that starts at 09:00 and stops at 16:00 on 21 June cuts off several hours of real sunlight and will be read as selective.

Show the existing situation and the proposed situation at identical time steps, on identical base drawings, at the same scale. Reviewers compare frames, and any difference in framing between the two sets slows that comparison and raises suspicion. Where the site sits among tall neighbours and existing overshadowing is already severe, say so in the baseline rather than letting the proposed plots carry the whole story, which is the approach set out for daylight assessment in dense historic townscapes.

Clock time, solar time and true north

Three errors recur, and all three are avoidable.

The first is British Summer Time. Sun position calculations work in local solar time, and clocks in the United Kingdom run one hour ahead from late March to late October. A 21 June plot labelled 13:00 without saying whether that is clock time or solar time is ambiguous, and the difference is a full hour of sun movement. Label every frame with the convention used.

The second is north. Building models are often drawn to grid north taken from the ordnance survey base, while the sun path needs true north. The difference varies across the country, and on a tight site it is enough to move a shadow edge off a boundary or onto it.

The third is site coordinates. Solar geometry depends on latitude, and a model left at a software default rather than set to the site's own position will be wrong by a noticeable margin in the north or south of England. State the latitude and longitude used.

Presenting the seasonal comparison

Put the compliance answer first. The percentage of each amenity area receiving two or more hours of sun on 21 March, existing and proposed, with the ratio between them, in a table. Then the plots.

Keep one page per date, with existing above proposed, and a short caption stating the date, the interval, the time convention and the north reference. Anything an objector might reasonably ask should be answerable from the caption.

Where the proposal falls short, say so and quantify it rather than burying it. A study that concedes a 0.72 ratio on one garden and explains why the harm is limited reads far better than one that reports compliance and is then contradicted at committee. That honesty matters most in an Overshadowing Study submitted alongside a contested application, where the officer is looking for a reason to trust the numbers.

Neighbouring solar installations deserve a separate paragraph if any are present, since panel output is affected by shading in a way that garden amenity is not, and that argument is handled differently, as set out in the note on overshadowing of a neighbour's solar panels.

Agreeing dates before you model

Ask the case officer, in writing, before the modelling starts. A single email confirming the dates, intervals, time convention and which amenity areas are to be assessed costs nothing and removes the most common reason for a resubmission.

Where pre-application advice is being taken anyway, fold the question into it. Where it is not, a short scoping note sent at validation stage does the same job. Record the reply and reproduce it in the methodology section of the report, so the person reviewing it in six weeks can see the scope was agreed rather than chosen.

Daylight and sunlight work is a specialist field, and councils generally expect a suitably qualified author, with professional review strongly advised before submission.

To see which assessments a site is likely to need before you scope the modelling, enter your postcode on PlanScope and work through the guided questions.

This is general guidance, not legal advice, so check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Why do sunlight studies use 21 March?

Because the sun on the spring equinox follows a path close to the annual average, and the BRE guidance sets its sunlight and overshadowing tests on that date. It also repeats around 21 September, so modelling one date describes two. Plotting a different date without explanation suggests the modeller chose a flattering day.

How much sunlight should a garden receive?

The BRE guidance asks for at least half of an amenity area to receive at least two hours of sunlight on 21 March. Where an existing space already meets that and a proposal reduces the sunlit area to less than 0.8 times its former value, the loss is treated as noticeable. Both limbs are tested at the equinox.

Should I include 21 June and 21 December shadow plots?

They form no part of the numerical tests, but both are useful context. June shows the best case and the early evening shadows across neighbouring gardens. December shows the worst case, with very long shadows, and an objector will produce it if you do not. Label them as context, and keep the compliance conclusion at the equinox.

Should shadow plots use British Summer Time or GMT?

Sun position is calculated in local solar time, and clocks run an hour ahead from late March to late October. Either convention can be used provided every frame is labelled, because a plot marked 13:00 without a stated convention is ambiguous by a full hour of sun movement. State the convention in the methodology and on each drawing.

How often should shadow plots be taken through the day?

Hourly from sunrise to sunset for the date being modelled is the working standard. Use half-hourly intervals where a shadow crosses a small garden quickly, since hourly steps can miss the worst moment. Do not truncate the run to office hours, because that cuts off real sunlight and reads as selective.

Sources and further reading

sunlightovershadowingbre 209amenitydaylightshadow study

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Daylight, Sunlight and Amenity

View all →
Daylight, Sunlight and Amenity6 min read

Daylight to rooms behind deep balconies and access decks

The obstruction is your own building. How projection, soffit height and balustrade choice change the daylight result, and what the assessment has to show.

Read article →
Daylight, Sunlight and Amenity8 min read

Adequate natural light as a Class MA prior approval matter

Adequate natural light carries a duty to refuse, not a discretion to weigh, and it is assessed on your drawings. Here is what to submit and how deep floorplates are made to work.

Read article →
Daylight, Sunlight and Amenity7 min read

Overshadowing of a public park by a tall building

The sun on ground test gives one number for an amenity space. A park is many spaces. Here is how to zone it, baseline it and report it so the result survives committee.

Read article →
Daylight, Sunlight and Amenity7 min read

Obscure glazing conditions and their daylight effect

Obscuring glass leaves the geometric daylight metrics untouched and alters everything calculated from transmittance. What changes, what does not, and the alternatives.

Read article →
Daylight, Sunlight and Amenity8 min read

Amenity harm and the presumption in favour of development

A failed Vertical Sky Component test is an input, not a reason for refusal. How to turn daylight findings into weight an inspector can use in the planning balance.

Read article →
Daylight, Sunlight and Amenity7 min read

Measuring existing windows for a daylight survey

External geometry can be measured from the street. Room depth and room use cannot, and that is where most daylight assessments are challenged at committee and on appeal.

Read article →