Energy, Sustainability and Carbon

Choosing between TM52 and TM59 overheating criteria

7 min readBy PlanScope Editorial Team

TM59 does not replace TM52, it borrows one of its criteria and adds a night-time bedroom test. How to allocate methodologies in a mixed use building and report the weather file honestly.

Pick the wrong overheating methodology and the assessment answers a question nobody asked. The short version: TM59 is the domestic methodology and applies to homes, TM52 is the adaptive comfort methodology for free-running non-domestic spaces, and TM59 borrows one of TM52's criteria rather than replacing it. A mixed use building usually needs both, applied to different parts.

The confusion arises because TM59 is not a separate test regime. It is a design methodology that specifies modelling assumptions for homes, then applies TM52 criterion one to the habitable rooms and adds a bedroom criterion of its own.

What each methodology covers

TM52 sets out the adaptive comfort approach for buildings without mechanical cooling, where occupants adjust clothing, open windows and tolerate higher internal temperatures when it is warm outside. The comfort temperature moves with the running mean external temperature, so the same internal figure can be acceptable in August and uncomfortable in May. It is written for offices, schools, and other non-domestic spaces that run free.

TM59 takes that framework and fixes the inputs for dwellings: occupancy profiles for living spaces and bedrooms, internal gains from appliances and lighting, assumptions about curtains and blinds, window opening behaviour, and the treatment of communal corridors and risers. It then applies two criteria to naturally ventilated homes and a different criterion set to predominantly mechanically ventilated homes.

So the choice is not really a choice for a residential scheme. It is a choice for the non-residential parts of a mixed building, and for the question of which criteria apply to a space that is neither clearly domestic nor clearly an office.

The criteria side by side

Methodology and space type Criteria applied Assessment period
TM52, free-running non-domestic Hours of exceedance, daily weighted exceedance, and an upper limit on the temperature difference Occupied hours, May to September
TM59, naturally ventilated home, living areas and kitchens Hours of exceedance against the adaptive comfort threshold Occupied hours, May to September
TM59, naturally ventilated home, bedrooms The same exceedance criterion plus a night-time operative temperature limit Night hours across the year for the second criterion
TM59, predominantly mechanically ventilated home Fixed operative temperature thresholds for bedrooms and living areas Occupied hours

The three TM52 criteria work together and a space fails if it breaches more than one of them, which gives some tolerance to a brief extreme. The second and third criteria are the ones that catch a space with a short severe peak rather than a long mild excess, and they are why a space can pass on total hours and still fail.

For homes, the adaptive criterion and the night-time criterion test different things. A living room with large south glazing tends to fail the daytime criterion. A single aspect bedroom with a west window and restricted opening tends to fail the night-time one. They respond to different design moves, so report them separately rather than giving a single pass or fail per dwelling.

Bedrooms and the overnight test

The night-time bedroom criterion is the one that drives design on urban sites, and it is the hardest to satisfy. A bedroom retains heat gained during the day, the external temperature falls slowly in a built-up area, and if noise or security restricts the openable area, the room cannot purge.

Three consequences for the design team. Shading on east and west elevations matters more than on south elevations for bedrooms, because low-angle sun in the late afternoon heats the room shortly before the test period begins. Exposed thermal mass helps only if there is a night ventilation path to discharge it, so a sealed room with a concrete soffit performs worse than an insulated one with a purge route. And restrictors fitted for falling safety reduce the free area actually available, so model the restricted opening rather than the nominal one.

Where the acoustic environment rules out night opening altogether, mechanical ventilation with a summer bypass is normally the next step. Planted roof surfaces also reduce the heat reaching top-floor bedrooms, which brings the overheating design into contact with the other demands on a roof, as our note on biosolar roofs describes.

Mixed use buildings and which applies

Apply the domestic methodology to the dwellings and the adaptive non-domestic methodology to the commercial floors, and say in the report which applies where. Three space types sit awkwardly between them.

Communal corridors and lobbies in a residential block are addressed within the domestic methodology, and they frequently fail where risers carry heating distribution pipework. The usual fixes are insulation of the pipework, separation of the riser from the corridor, and mechanical ventilation of the corridor, all of which are design decisions rather than reporting decisions.

Student rooms, co-living rooms and hotel bedrooms are rooms used for sleeping that are not self-contained dwellings. The pragmatic approach, which councils generally accept, is to apply the domestic bedroom criterion to the sleeping space and the non-domestic approach to communal areas, with the choice explained.

Accommodation for occupiers who cannot easily adapt, such as a care home or supported housing, needs tighter thresholds than either default. The domestic methodology includes guidance for vulnerable occupants, and a scheme that ignores it will be queried by an environmental health or housing consultee rather than by the planning officer.

Weather files and future climate years

The weather file choice changes the answer more than most design decisions do. Design summer year files come in three forms for each location: a moderately warm summer, a short intense warm spell, and a longer less intense warm period. A design that passes against one can fail against another, because the three test different failure modes.

Report the file you used by name, including the location, the percentile and the time period. Run at least one sensitivity case against a different file, and say what happened. Where a future climate year is tested, say which decade and which emissions scenario, since a 2050s file with a high emissions scenario is a different test from a 2030s median file.

A scheme that passes on a current file and fails on a future one is worth disclosing rather than hiding. Officers in authorities with a climate resilience policy increasingly ask for it, and volunteering the result with an explanation of the adaptation capacity built into the design reads much better than being asked.

Where Approved Document O sits

Part O of the Building Regulations is a separate compliance regime from planning, and it offers two routes: a simplified method with limits on glazing area and requirements for removing excess heat, and a dynamic thermal modelling route. The modelling route uses the domestic methodology with its own specified criteria, weather data and modelling assumptions, so a model built for Part O compliance is not automatically the model a planning authority wants.

In practice the sensible approach is one model, run twice, reported once. State which criteria set each result relates to, and keep the geometry, glazing and ventilation inputs identical between runs so that the two reported outcomes can be reconciled. Where they differ, say why.

Coordination with the Energy Statement matters here too, because the overheating model and the energy model share glazing specifications, g-values and ventilation rates. Discrepancies between the two are found on almost every review.

What to state in the report

Six items, each in one line near the front. The methodology and its edition. The criteria applied and to which spaces. The weather file by full name. The software and version. The rooms modelled and the worst performing room. And the compliance route being demonstrated.

Then the results, room by room, with the occupancy profile and internal gains in an appendix so a reviewer can check them. An Overheating Risk Assessment structured that way takes a reviewer twenty minutes rather than two hours, and that alone shortens the determination period.

Overheating modelling is a report type where councils expect a suitably qualified author and professional review is strongly advised. PlanScope drafts the planning narrative and structure around a modeller's outputs, with flags where figures are still to be confirmed. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. Enter your postcode on PlanScope to see which reports your scheme is likely to need.

Frequently asked questions

Is TM59 a replacement for TM52?

No. TM59 is a design methodology for homes that fixes occupancy, gains and ventilation assumptions, then applies the TM52 hours of exceedance criterion to habitable rooms and adds a night-time bedroom criterion. TM52 remains the adaptive comfort approach for free-running non-domestic spaces such as offices and schools.

Which methodology applies to student rooms or co-living?

These are sleeping rooms that are not self-contained dwellings, so neither default fits exactly. The approach councils generally accept is to apply the domestic bedroom criterion to the sleeping space and the non-domestic adaptive approach to communal areas, with the allocation explained in the report rather than left implicit.

Why do communal corridors fail overheating assessments?

Usually because risers carry heating distribution pipework into a space with little ventilation. The domestic methodology addresses corridors directly. The remedies are design decisions: insulate the pipework, separate the riser from the corridor, or ventilate the corridor mechanically rather than relying on reporting assumptions.

Which weather file should be used?

Design summer year files come in three forms for each location: a moderately warm summer, a short intense warm spell, and a longer less intense warm period. Report the file by full name including location, percentile and period, run at least one sensitivity case against a different file, and state the outcome.

Does a Part O model satisfy a planning authority?

Not automatically. Part O offers a simplified method and a dynamic modelling route, and the modelling route specifies its own criteria, weather data and assumptions. Run one model twice with identical geometry and ventilation inputs, report both outcomes, and say which criteria set each result relates to.

Sources and further reading

overheatingtm59tm52part ocibseenergy

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Energy, Sustainability and Carbon

View all →
Energy, Sustainability and Carbon6 min read

Renewable energy requirements on employment units

A renewables percentage applied to a shell and core warehouse depends entirely on what it is measured against. How to settle the definition and draft a condition that can be complied with.

Read article →
Energy, Sustainability and Carbon7 min read

Solar panels on a pitched roof: permission and policy

Class A of Part 14 allows roof-mounted solar on a house, including the front slope and in conservation areas, subject to a 0.2 metre projection limit and conditions on appearance.

Read article →
Energy, Sustainability and Carbon7 min read

Whole life carbon: modules A to C and what gets reported

Whole life carbon is modules A plus B plus C, with D reported separately and never netted off. What each module covers, which assumptions drive the result, and how to present it so a reviewer can check it.

Read article →
Energy, Sustainability and Carbon7 min read

Communal heat networks and what planning policy requires

National policy says little about site heat networks; the requirement comes from local plans and, in London, policy SI 3. What evidence persuades, how zoning changes the safeguarding argument, and which conditions work.

Read article →
Energy, Sustainability and Carbon8 min read

Heat pumps in an energy strategy: what officers check

A heat pump energy strategy is judged on three things: the seasonal performance figure against the design flow temperature, the external unit's location, and the noise assessment positions.

Read article →
Energy, Sustainability and Carbon7 min read

Future Homes Standard transitional rules for consented sites

A planning permission does not fix which edition of the energy requirements applies. The transitional mechanism works plot by plot, so the evidence of a start on each individual dwelling is what matters.

Read article →