Use Classes and Change of Use

Cinemas, theatres and concert halls as sui generis uses

7 min readBy PlanScope Editorial Team

Since 2020 cinemas and concert halls have been sui generis, outside the use classes. That means permission both ways, and a technical case built on noise isolation.

The cinema use class question has a short answer: there is no class. Since the September 2020 changes to the Use Classes Order, cinemas, concert halls, bingo halls, dance halls and venues for live music performance are all sui generis, standing outside the classes altogether. Theatres already were. So every change into or out of one of these uses needs planning permission, and none of the flexibility that Class E gives a shop or an office is available.

That is a real disadvantage for operators and a real protection for existing venues. Both effects follow from the same rule.

Why these uses sit outside the classes

Before 2020 most of these uses sat in the old assembly and leisure class, alongside swimming pools and gyms. The 2020 amendment broke that class up. Indoor sport, recreation and fitness moved into Class E(d), which means a gym can now occupy a former shop without permission. Everything with an audience and amplified sound was pushed out into sui generis.

The distinction is worth understanding because neighbouring uses are treated differently. A museum or an art gallery is within Class F1, a local community hall is within Class F2, and a gym is within Class E. A cinema is none of those things.

One consequence catches landlords. A vacant unit in Class E cannot become a cinema without permission, and a cinema that closes cannot be relet as a retail unit without permission either. Limited specified changes exist in Part 3 of Schedule 2 to the GPDO, so check the current Part 3 for your particular starting and finishing use rather than assuming there is nothing available.

Changing from retail to a venue

An application to convert a shop, a bank or a former department store into a cinema or a music venue is a change of use application with a substantial technical content. Four issues dominate.

Noise breakout to neighbouring residential and commercial occupiers. Servicing and waste. Highway and pedestrian effects at the end of a performance. And the loss of the previous use, where the local plan protects retail frontage or employment floorspace.

Deal with the last one in the Planning Statement by reference to the plan's own wording. Where a policy protects a primary shopping frontage, set out the vacancy history of the unit, marketing evidence where it exists, and the contribution the venue makes to evening footfall. Where the policy supports cultural uses, quote it.

Noise breakout and structural isolation

Entertainment noise is assessed differently from industrial plant noise, and applicants who submit only a BS 4142 assessment of the air conditioning units have answered the easier question.

Music and film soundtracks contain low frequency energy that travels through structure, and the usual criterion applied to entertainment noise is far tighter than for general plant: inaudibility, or no measurable increase in the existing background level, inside the nearest noise-sensitive rooms. Achieving that in a building with a shared party wall or flats above means structural separation rather than acoustic treatment.

The measures that actually work are expensive and have to be designed in at the start: an independent inner structure isolated from the host building, floating floors on resilient bearings, acoustically isolated ceilings with a break in the structural path, lobbied entrances with two doors and a sound lock, and attenuated ventilation routes with no direct path from the auditorium to the outside.

A Noise Impact Assessment should therefore contain three things beyond the usual survey: measured background levels inside the nearest sensitive rooms rather than only outside, the predicted source levels at the loudest expected content, and the insertion loss required from each element of the separating construction. Councils usually expect a suitably qualified acoustician for this work and professional review is strongly advised.

Plant noise still needs assessing in its own right, because a cinema carries substantial cooling load and the condensers usually end up on the roof.

The agent of change principle, both ways

The agent of change principle puts the onus for mitigation on the party introducing the change. National policy applies it to protect existing businesses and facilities, including music venues, from new development that would place unreasonable restrictions on them, and it appears in the London Plan as a policy in its own right.

For a new venue, the principle works against you. You are the agent of change, and you carry the mitigation cost.

For an established venue facing a residential application next door, it works in your favour. The developer should be designing the flats to protect their occupants from your existing operation, and a condition or obligation securing that design is the usual mechanism. Existing operators should respond to nearby residential applications rather than assuming someone else will, and the note on live music venues and agent of change sets out how those representations are best framed.

Servicing, queuing and dispersal

The transport case for a venue is about arrival and departure patterns rather than daily trip totals. A multi-screen cinema empties in waves. A concert hall empties at once.

Set out in the transport evidence: the capacity of the venue and the expected pattern of arrival and departure, the pedestrian routes to and from public transport and the crossings involved, the pick-up and drop-off arrangement including taxis, the coach arrangement where relevant, and the queue management outside the entrance so that a queue does not block the footway.

A Transport Statement is usually proportionate for a conversion in a town centre with good public transport, with a full assessment for larger schemes or edge of centre sites. A Travel Plan dealing with staff travel and with late-night dispersal is commonly required by condition.

Servicing needs a delivery and collection arrangement that keeps vehicles off the highway, a waste storage area sized for the actual volumes, which for a cinema means a lot of cardboard and food waste, and a collection schedule that avoids early morning noise next to housing.

Then there is dispersal itself. A dispersal management plan covering staffing at closing time, signage, the route patrons take, and liaison with the authority's licensing team answers the objection that most often comes from residents. Offer it with the application.

Licensing runs in parallel

A premises licence under the Licensing Act 2003 is needed for regulated entertainment and for alcohol, and it is granted by the licensing authority against four objectives, including the prevention of public nuisance.

Two points matter for the planning application. The licensing and planning regimes are separate, and a planning permission does not guarantee a licence or vice versa, so run them in parallel and keep the operating information consistent between them. And conditions volunteered in the licensing process, on hours, capacity, door supervision and noise limiters, often reassure planning officers, so it is worth sharing the draft operating schedule.

Hours are where the two regimes meet most often. Ask for the hours the business needs, with a closing arrangement you can actually staff, and expect a condition tying amplified sound to a noise limiter set by an acoustician after commissioning.

Assembling the application

For a conversion to a venue, the pack that gets through validation and committee contains:

  • A planning statement addressing use class, policy protection and the loss of the previous use.
  • A design and access statement covering the frontage, entrance and accessibility.
  • A noise impact assessment with internal background levels and the required insertion losses.
  • A separate plant noise assessment for roof-mounted condensers.
  • A transport statement with arrival and departure profiles.
  • A delivery, servicing and waste plan.
  • A dispersal management plan.
  • A ventilation and extraction scheme where food and drink are prepared.

Where the building is listed or in a conservation area, add a heritage statement dealing with the internal interventions, because acoustic isolation inside a historic building means new structure against historic fabric and that is the point at which conservation officers engage.

For the wider picture of uses that fall outside the classes, see the note on sui generis uses.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Which entertainment uses are sui generis?

Cinemas, concert halls, bingo halls, dance halls and venues for live music performance were all made sui generis by the September 2020 changes to the Use Classes Order, and theatres already were. Indoor sport, recreation and fitness moved into Class E(d) instead, which is why a gym can take a former shop without permission but a cinema cannot.

Can a shop become a cinema without permission?

No. A Class E unit cannot change to a sui generis use without planning permission, and a closed cinema cannot be relet as retail without permission either. Some specified changes exist in Part 3 of Schedule 2 to the GPDO, so check the current Part 3 for your particular starting and finishing use before concluding there is no route.

How is entertainment noise assessed?

More strictly than industrial plant noise. The criterion applied to music and soundtrack noise is usually inaudibility or no measurable increase in background level inside the nearest noise-sensitive rooms, which means structural separation rather than surface treatment. Measure internal background levels, predict source levels at the loudest content, and state the insertion loss each element must achieve.

Does the agent of change principle help a new venue?

No, it works against you. As the party introducing the change you carry the mitigation cost. The principle helps an established venue facing a residential application nearby, where the developer should design the new homes to protect occupants from the existing operation. Existing operators should make representations rather than relying on the authority to apply it.

Do I need a premises licence as well as permission?

Yes, for regulated entertainment and for alcohol, granted by the licensing authority against four objectives including prevention of public nuisance. The regimes are separate, so permission does not secure a licence. Run them in parallel, keep operating information consistent, and share the draft operating schedule with the planning officer.

Sources and further reading

use classessui generiscinemalive musicnoiselicensingcommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Veterinary practices: Class E or sui generis?

Consulting surgeries are usually treated as Class E. Boarding, catteries and dog day care sit outside the Use Classes Order entirely, so a practice doing both runs a mixed use with no fallback.

Read article →
Use Classes and Change of Use7 min read

Dentists, clinics and the limits of Class E(e)

Dentists and clinics sit in Class E(e), so movement from another Class E use is not development. Surgeries attached to a practitioner's home, overnight care and restrictive conditions are where that breaks down.

Read article →
Use Classes and Change of Use8 min read

Betting shops, payday lenders and amusement arcades

Betting offices, pay day loan shops and amusement arcades sit outside the use classes, so there is no permitted change into them and no fallback use to rely on.

Read article →
Use Classes and Change of Use6 min read

Padel and outdoor sport: consents and conditions

The use class is the easy part. How padel noise is assessed when there is no national method, what the lighting limits require, and when Sport England is consulted.

Read article →
Use Classes and Change of Use6 min read

Self-storage and the limits of Class B8

Self-storage sits within Class B8, but ancillary sales, trade counters and processing all test the edge of the class. Where the line falls and how it is conditioned.

Read article →
Use Classes and Change of Use7 min read

Dog day care and boarding: which consents you need

Day care and boarding sit outside the Use Classes Order, so the change of use always needs permission. Barking decides the case, and welfare licensing is a separate consent.

Read article →