Planning Law Updates

Class E and what the 2020 use classes reform replaced

6 min readBy PlanScope Editorial Team

Since 1 September 2020 movement between shops, offices, restaurants, gyms, clinics and nurseries has not been development. The exclusions and the pre-2020 conditions that still restrict units.

On 1 September 2020 the shop, the office, the restaurant, the gym, the nursery and the doctor's surgery became the same thing in planning terms. Use Class E swallowed six former classes, and moving between any of the uses inside it stopped being development at all. For a business looking at a vacant unit, use class E explained is the difference between an eight week application and a change of signage.

The reform came through the Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, amending the Use Classes Order 1987. It applies in England only.

What was consolidated

Class E, described as commercial, business and service, absorbed the old A1 shops, A2 financial and professional services, A3 restaurants and cafes, B1 business in all its parts, and the parts of D1 and D2 that suit a commercial setting.

Its limbs cover retail sale of goods other than hot food, sale of food and drink mostly consumed on the premises, financial and professional services, indoor sport and fitness, medical and health services, creches and day nurseries, and offices, research and development and light industrial processes that can be carried on in a residential area without detriment to amenity.

Two new classes were created alongside it. Class F1 covers learning and non-residential institutions such as schools, museums, public libraries, public halls, places of worship and law courts. Class F2 covers local community uses, including a shop of no more than 280 square metres selling mostly essential goods where there is no other such facility within 1,000 metres, community halls, outdoor sport and swimming pools and skating rinks.

That 280 square metre village shop provision is worth knowing. It protects the last shop in a settlement from being converted freely, and it catches owners who assume every small shop sits in Class E.

Movements inside Class E

Using a building for any purpose within the same class is not development. That is the operative rule, and it is why a former bank can become a gym, a nursery or a restaurant without an application.

What this does not remove is everything else. Physical works to the shopfront may need planning permission. Extraction, plant and external alterations certainly can. An office becoming a restaurant brings cooking odour, deliveries, refuse and late hours, none of which the use classes reform touched. The Ventilation and Extraction Statement is often the document a council asks for in exactly this situation, and environmental health will have a view whether or not planning permission is needed.

Listed buildings and conservation areas are unaffected too. A free change of use inside Class E does not license the flue, the extract terminal or the illuminated fascia that goes with it.

What was left outside

The uses that generate the most amenity complaints were deliberately excluded and made sui generis, meaning they sit in no class at all and any change to or from them is a material change of use.

Use Position after 2020
Pubs and drinking establishments Sui generis
Drinking establishments with expanded food provision Sui generis
Hot food takeaways Sui generis
Cinemas, concert halls, bingo halls, dance halls, live music venues Sui generis
Hotels and guest houses Class C1, unchanged
Residential institutions Class C2, unchanged
Betting shops, pay day loan shops, laundrettes Sui generis, unchanged

The practical effect is sharp. A cafe in Class E that starts selling mainly hot food for consumption off the premises has moved into a sui generis use and needs planning permission. So has a restaurant that reorients itself as a bar. Councils look at the balance of the trade rather than the name over the door.

Conditions referring to the old classes

This is the trap that catches the most occupiers, and it catches professional advisers too.

Where a permission granted before September 2020 carries a condition restricting the use to a named former class, that condition continues to have effect by reference to the class as it was. A unit permitted subject to a condition limiting it to A1 retail is still limited to A1 retail, and the freedom inside Class E is simply not available to it.

So read the planning history first. And read it before the lease, not after. Find the original permission, read every condition, and check for later variations. Retail parks, edge of centre units, mixed use ground floors and anything permitted through a masterplan are the places these conditions cluster. Units consented as part of a residential scheme are another, because the restriction was often imposed to protect the flats above from noise, cooking smells and late deliveries. A landlord who tells you the unit is Class E is describing the class the use falls within, which is not the same as telling you what the permission allows.

Where a condition bites, the route out is an application under section 73 to vary or remove it. That is a full application on the merits, and the council will assess the effect of removing the restriction rather than waving it through.

Article 4 directions and the response

Councils reacted to the reform in two ways. Some made Article 4 directions removing permitted development rights that allow Class E premises to become homes. Others adopted policies protecting particular frontages or clusters.

An Article 4 direction does not affect movement inside Class E, because that movement is not development and there is nothing for the direction to remove. Directions target the permitted development rights in Part 3 of the GPDO, principally the Class MA route from commercial to residential. National policy has since expected such directions to be limited to situations where they are necessary to avoid wholly unacceptable harm, which has narrowed their scope.

Class MA itself has been amended more than once since it was introduced in August 2021, including changes to the floorspace cap and the vacancy requirement. Check the current text of Part 3 rather than a summary written at the time, and follow changes through the planning law timeline.

Evidencing an existing lawful use

None of the above helps if you cannot show what the lawful use is.

  1. Obtain the planning history for the unit from the council's online register, including every permission and every condition.
  2. Gather evidence of actual use over time: leases, rating records, accounts, dated photographs, trading records.
  3. Where the position is unclear, apply for a Lawful Development Certificate for an existing use under section 191 of the Town and Country Planning Act 1990.
  4. Where you want confirmation before committing, apply for a certificate for a proposed use under section 192 instead.

A certificate costs a fee and takes eight weeks, and it is the only formal way to settle the question. For a tenant signing a fifteen year lease on a unit whose planning history is messy, that is a modest price. The policy and history narrative belongs in a Planning Statement where an application turns out to be needed.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance rather than legal advice, so check the position with your local planning authority or a qualified professional before relying on it. Browse the PlanScope report types to see what a change of use application usually needs.

Frequently asked questions

Which classes did Class E replace?

Class E absorbed the former A1 shops, A2 financial and professional services, A3 restaurants and cafes, B1 business in all its parts, and the parts of D1 and D2 suited to a commercial setting. Class F1 was created for learning and non-residential institutions and Class F2 for local community uses.

Can a shop become a restaurant without planning permission?

The change of use itself is not development, because both sit within Class E. Physical works, extraction, plant and external alterations may still need permission, and environmental health will take an interest in odour, noise and refuse regardless. Listed building and conservation area controls are unaffected.

Which uses are outside Class E?

Pubs and drinking establishments, drinking establishments with expanded food provision, hot food takeaways, cinemas, concert halls, bingo halls, dance halls and live music venues were all made sui generis. Hotels remain in C1, residential institutions in C2, and betting shops, pay day loan shops and laundrettes remain sui generis.

Do old conditions restricting a unit to A1 still apply?

Yes. Where a permission granted before September 2020 carries a condition restricting the use to a named former class, that condition continues to operate by reference to the class as it stood. The freedom to move within Class E is not available to that unit. An application under section 73 is the route to remove it.

How do I confirm the lawful use of a commercial unit?

Obtain the planning history and read every condition, then gather evidence of actual use through leases, rating records, accounts and dated photographs. Where the position is unclear, apply for a Lawful Development Certificate under section 191 for an existing use or section 192 for a proposed one.

Sources and further reading

use classesclass echange of usesui generiscommercialplanning law

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates7 min read

Section 73B and the limits on amending a permission

Section 73B was inserted to fill the gap left between non-material amendments and condition variations. It does not solve the Hillside problem, and its commencement needs checking.

Read article →
Planning Law Updates8 min read

Upward extensions under Part 20 and the prior approval tests

Part 20 grants the principle of adding storeys and then gives the authority a long list of prior approval matters. Daylight, amenity and external appearance are where these applications are won or lost.

Read article →
Planning Law Updates8 min read

Use Classes Order 2020: what a condition still restricts

The 2020 amendment revoked the old classes but removed no conditions. A permission restricting a unit to Class A1 and no other purpose still binds, and the ways out are a section 73 application or a certificate.

Read article →
Planning Law Updates8 min read

Securing biodiversity gain for thirty years

The thirty year securing arrangement outlives the development and has to survive the land changing hands. Section 106 and conservation covenants behave differently, and the choice matters.

Read article →
Planning Law Updates8 min read

The statutory biodiversity metric and the small sites version

The small sites metric is a simpler calculator, not a lower standard. The eligibility conditions disqualify more sites than self-builders expect, and the hedgerow account is where plots fail.

Read article →
Planning Law Updates7 min read

The Infrastructure Levy and what replaces the current charge

The Levelling-up and Regeneration Act 2023 created powers for a value-based Infrastructure Levy, but none have been switched on. What that means for appraisals and land deals, as at October 2026.

Read article →