Commercial Occupiers

Class E change of use: moving a unit inside the class

7 min readBy PlanScope Editorial Team

A change from one Class E use to another is not development under section 55(2)(f), so no permission is needed. Old conditions, extraction works and the lawful use record are where the difficulty sits.

If your unit is already in Class E, you can usually switch it to another Class E use without any planning application at all. The Class E change of use rules work through section 55(2)(f) of the Town and Country Planning Act 1990, which says that a change within the same use class is not development. No development, no permission needed. The traps are elsewhere: planning conditions attached to an old permission, the physical works you want to carry out, and whether your existing lawful use really is Class E in the first place.

Class E was created on 1 September 2020 by the Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, which swept the old A1, A2, A3 and B1 classes into one commercial, business and service class.

What the commercial, business and service class covers

The class has seven limbs, and the breadth of it still surprises landlords.

Limb Uses included
E(a) Display or retail sale of goods, other than hot food
E(b) Sale of food and drink mainly consumed on the premises
E(c) Financial services, professional services and other services appropriate in a commercial, business or service locality
E(d) Indoor sport, recreation or fitness, not involving motorised vehicles or firearms
E(e) Provision of medical or health services, other than by a person's home
E(f) Creche, day nursery or day centre
E(g) Offices, research and development, and light industrial processes that can be carried on in a residential area without detriment to amenity

So a bank can become a gym, a shop can become a nursery, and an office can become a dental practice, with no application. That is the whole point of the 2020 reform.

What sits outside the class matters just as much. Pubs and drinking establishments, hot food takeaways, cinemas, concert halls, live music venues, nightclubs and petrol filling stations are all sui generis, which means each is in a class of its own and any move to or from them is a change of use needing permission. A restaurant in E(b) that starts trading mainly as a takeaway has moved to sui generis and needs an application, whatever the lease says.

Moves that need no application

Where both the old and the new use sit inside Class E, there is nothing to apply for. You do not need prior approval, you do not pay a fee, and no Community Infrastructure Levy liability arises from the change itself.

Two things are still worth doing. Write a dated file note recording the change, with photographs and the date trading started, because in ten years that note is your evidence. And check the title and the lease, since a user covenant restricting the permitted use is a private matter the council has no interest in and cannot waive.

Deliveries, opening hours and staff numbers are not part of the use class question. They become relevant only if a condition controls them.

The use change is free. The building works usually are not.

  • A new or altered shopfront on a building in a conservation area, or any works to a listed building, need consent in their own right
  • External extraction ductwork for a kitchen or a salon is development, and often the single most contentious element
  • Plant, condensers and air handling units on a flat roof or rear elevation need permission where they are not covered by permitted development
  • A mezzanine floor inserted in a retail unit that increases the floorspace beyond the threshold in section 55(2A) of the 1990 Act counts as development
  • Signage is dealt with separately under advertisement consent

Extraction is where most food and beauty uses come unstuck. A nursery moving into a former office rarely needs more than internal work, while a cafe needs a duct that terminates above eaves level and a case that odour will be controlled. The evidence for that sits in a Ventilation and Extraction Statement, and the same logic applies to the extraction and odour issues in a nail bar or salon. Plant noise is assessed separately against BS 4142 in a Noise Impact Assessment, and environmental health officers comment on both.

Conditions that pin the use down

This is the real limit on Class E flexibility. A planning permission can restrict the use of a building to something narrower than its use class, and where it does, the condition governs.

Conditions of this kind are common on units consented in the last thirty years. Typical wording limits the premises to retail use within Class A1 as it stood at the date of the permission, or restricts the floorspace, or controls hours. Where the permission predates September 2020 and refers to the old classes, the condition still bites according to the meaning the class had when the permission was granted. A condition restricting use to A1 therefore continues to prevent a move to office or gym use, even though both are now in the same class as the shop.

The route out is an application under section 73 to vary or remove the condition. It is a full planning judgement on that condition, so the council can refuse, and it attracts a fee and consultation. Varying restrictions on trading is the same mechanism described in the note on varying trading hours under a section 73 application.

Always read the decision notice for the unit before assuming flexibility. Not every unit has one.

What Article 4 directions can and cannot touch

This point is widely misunderstood. An Article 4 direction withdraws permitted development rights granted by the General Permitted Development Order 2015. A change within Class E is not permitted development, because it is not development at all. An Article 4 direction therefore cannot stop you moving from a shop to an office inside Class E.

What Article 4 directions do bite on is the separate permitted development right to change from Class E to residential use under Class MA of Schedule 2 Part 3, and the older rights covering changes out of the commercial class. Many councils have made directions covering town centres and shopping frontages precisely to control that. So if your plan ends in flats rather than another commercial use, the direction matters a great deal. If it ends in a gym, it does not.

Proving the existing lawful use

Everything above depends on knowing what the lawful use is now, and that is not always what the tenant says or the rates list records.

Work from the documents in this order: the most recent planning permission and its conditions, any lawful development certificate, historic decision notices held on the council's public register, and then evidence of actual use over time such as accounts, tenancy agreements, invoices and dated photographs. Where the building has drifted through several occupiers without applications, the lawful use may be a hybrid or may have become sui generis without anyone noticing.

A lawful development certificate under section 191 of the 1990 Act, for an existing use, or section 192 for a proposed one, is the only formal way to confirm that a use is lawful. It costs a fee and takes eight weeks, and on any transaction where the use is doing real work in the valuation it is money well spent. A certificate under section 192 can also confirm that a proposed switch inside Class E needs no permission, which is useful for a lender who wants more than an opinion.

Keep the records. The commercial class gives you freedom to move between uses without asking anyone, and the price of that freedom is that nobody else is keeping a record of what you did.

To see which supporting documents a change of use would need where works are involved, enter your postcode on PlanScope and it will flag the reports your site is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and use a lawful development certificate where the lawfulness of a use needs to be settled. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I turn a shop into a gym without planning permission?

If the lawful use is Class E(a) and the gym falls within E(d), the change is not development and no application is required. Check the decision notice first, because a condition restricting the unit to retail use overrides the class. Any external plant, ventilation or shopfront alteration is a separate matter that may need its own permission.

Does an Article 4 direction stop movement within Class E?

No. Article 4 directions withdraw permitted development rights under the General Permitted Development Order, and a change within a single use class is not permitted development because it is not development at all. Directions do restrict changes out of Class E, including the Class MA route to residential, which is what most town centre directions are aimed at.

Is a hot food takeaway in Class E?

No. Hot food takeaways became sui generis on 1 September 2020, along with pubs, drinking establishments, cinemas, concert halls, live music venues and nightclubs. A restaurant within E(b) that shifts to mainly takeaway trade has changed use and needs planning permission, regardless of what the lease or the food hygiene registration says.

Do I pay Community Infrastructure Levy on a change within Class E?

A change of use that is not development creates no levy liability, since there is no chargeable development. Physical works that add floorspace can create liability, depending on the charging authority's schedule and whether the existing building has been in lawful use for the required period. Check the current charging schedule with the collecting authority.

How do I prove the existing lawful use of a unit?

Start with the latest planning permission and its conditions, then the council's public register of past decisions, then documentary evidence of actual trading such as accounts, leases and dated photographs. Where the position is unclear or a lender needs certainty, apply for a lawful development certificate under section 191 of the Town and Country Planning Act 1990.

Sources and further reading

use classesclass echange of usecommercial propertylawful development certificate

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Hours of opening conditions and how to negotiate them

An hours condition is easier to shape before it is imposed than to vary afterwards. Here is the evidence that supports longer hours, how to split customer and delivery restrictions, and what varying an existing condition involves.

Read article →
Commercial Occupiers7 min read

Planning a pharmacy alongside a medical practice

Retail and health services both sit inside Class E, so a pharmacy opening in a shop unit or alongside a surgery usually needs no change of use permission. The consents that do bite are parking, hours, extraction and signage.

Read article →
Commercial Occupiers7 min read

Change of use to a light industrial unit near homes

Light industry sits inside Class E only where the process could be carried out in a residential area without detriment to amenity. That wording, not the machinery, decides whether your unit needs permission.

Read article →
Commercial Occupiers6 min read

Change of use to an amusement arcade or betting shop

Amusement arcades and betting offices sit outside every use class, so a change of use always needs planning permission. The decision usually turns on frontage policy, clustering and noise rather than on the gambling itself.

Read article →
Commercial Occupiers7 min read

Planning a barber, nail bar or beauty salon

Most personal care uses now sit inside Class E, so the use rarely needs permission. Extraction, waste and registration are where the work is.

Read article →
Commercial Occupiers7 min read

Mobile catering on private land and the 28-day rule

Part 4 Class B allows temporary use of land for 28 days a year. It does not apply inside the curtilage of a building, which rules out most car parks.

Read article →