Use Classes and Change of Use

Class F1 against Class F2: which community use sits where

8 min readBy PlanScope Editorial Team

F1 holds institutions with a wide catchment, F2 holds facilities a neighbourhood cannot replace. Movement inside each class is free, movement between them needs permission.

Class F1 covers learning and non-residential institutions, and Class F2 covers local community uses. The practical class f1 f2 difference is that F1 is about institutions serving a wide catchment, such as schools, museums, libraries, public halls and places of worship, while F2 is about the small facilities a neighbourhood loses and cannot replace, such as a village shop, a community hall, an outdoor sports area or a swimming pool. Both classes are protected, in the sense that there is no general permitted development right out of either, so moving a building between them needs planning permission.

Knowing which class a building is in therefore decides what the owner can do without asking anybody.

What each class contains

The two lists are short enough to learn.

Class F1, learning and non-residential institutions, covers the provision of education, the display of works of art other than for sale or hire, a museum, a public library or public reading room, a public hall or exhibition hall, use for or in connection with public worship or religious instruction, and a law court.

Class F2, local community, covers a shop mostly selling essential goods including food where the premises are no more than 280 m² and there is no other such facility within 1,000 metres, a hall or meeting place for the principal use of the local community, an area or place for outdoor sport or recreation not involving motorised vehicles or firearms, and an indoor or outdoor swimming pool or skating rink.

Both classes date from the September 2020 amendments to the Use Classes Order 1987, which broke up the old Class D1 and Class D2. Several uses that people still describe as D1 moved somewhere else entirely: clinics, health centres, creches and day nurseries went into the broad Class E, as did indoor sport and gyms from D2. Cinemas, concert halls, bingo halls, dance halls and live music venues became sui generis. That matters when you read an old permission, because consents and conditions granted before the change are still construed by reference to the classes as they stood then.

Halls and meeting places in F2 against exhibition halls in F1

This is the distinction that generates most of the arguments, because the word hall appears in both classes.

A public hall or exhibition hall is F1(e). A hall or meeting place for the principal use of the local community is F2(b). The difference is catchment and function rather than size or appearance. A hall hired by touring exhibitions, trade shows and ticketed events drawing people from across a town or region reads as F1. A hall whose users are the parish council, the toddler group, the bowls club and a Saturday market reads as F2.

In practice the test is who principally uses it. Ask for the booking diary. A village hall with a diary full of local groups is F2(b) whatever the deeds call it, and a former chapel now hired out for regional conferences has probably become F1(e).

Why does it matter if both are protected? Because movements within a class are not development. An F1 hall can become a school, a museum or a place of worship with no application at all. An F2 hall cannot, because those uses are in Class F1.

Use Class Can it become a school without permission?
Public or exhibition hall F1(e) Yes, education is F1(a)
Community hall or meeting place F2(b) No, that is a change to Class F1
Village shop meeting both F2(a) tests F2(a) No
Swimming pool F2(d) No
Museum F1(c) Yes

Education, museums, libraries and places of worship

The F1 limbs are broader than they look and they catch some uses people expect to find elsewhere.

Education in F1(a) covers schools, colleges and training premises, and it is not limited to state provision. A private tutoring centre operating as an educational establishment sits here rather than in Class E, which is a frequent source of confusion because a training room attached to an office does not.

Religious use in F1(f) covers use for or in connection with public worship or religious instruction. The in connection with wording brings ancillary and associated activity inside the class, so a church hall used for the congregation's own activities is normally part of the F1 use rather than a separate F2 use. Once the hall is hired out principally to unconnected local groups, the analysis changes and the building may contain two planning units.

Libraries and reading rooms in F1(d) must be public. A subscription library or a private archive is not within the limb and will usually be assessed as sui generis or as part of another use.

Museums in F1(c) and art display in F1(b) are distinguished by the sale point. Display of works of art otherwise than for sale or hire is F1(b). A commercial gallery selling the work is retail, which puts it in Class E(a), and that single word changes the whole flexibility position for the building.

Outdoor sport areas and swimming pools

The 2020 split put indoor sport in Class E(d) and left outdoor sport and swimming pools in Class F2. That produces an odd pair of outcomes worth knowing about.

An indoor tennis centre is Class E(d), so it can become an office, a shop or a nursery without permission. An outdoor tennis court is F2(c) and cannot. A swimming pool is F2(d) whether it is indoors or out, which is the one place the indoor and outdoor split does not apply.

F2(c) excludes activity involving motorised vehicles or firearms, so a motocross track, a karting circuit or a shooting ground is outside the class and will be sui generis. Floodlighting, fencing, car parking and buildings on an outdoor sports site are operational development needing permission in their own right whatever the use class says, and a change of use to an outdoor sports area with no buildings may still need a Transport Statement where trips and parking are the issue.

Movements permitted between the two

The position is simple to state and easy to get wrong.

Within F1, any movement between the limbs is not development. Within F2, the same. Between F1 and F2, in either direction, planning permission is needed, and so is any change from either class to Class E, to residential or to a sui generis use.

Part 3 of Schedule 2 to the General Permitted Development Order has been amended repeatedly since 2020 and contains narrow rights that apply to particular situations, including routes to state-funded schools. Check the current text for the specific change you want rather than relying on a general statement, including this one.

Temporary and meanwhile uses are a separate question. A community group occupying an empty building for a season raises exactly the issues set out in the treatment of temporary uses and the risk of permanence, and a use that was meant to be temporary can establish itself.

Why the distinction affects protection policies

Development plans usually carry a policy resisting the loss of community facilities, and the policy is where the real protection lives rather than in the use class.

Those policies typically require evidence of marketing over a defined period, evidence that the facility is no longer needed or viable, and sometimes a replacement facility. Read the wording carefully, because the marketing period, the method and the price basis are often prescribed, and marketing carried out the wrong way has to be done again.

Two other mechanisms support the same aim. An Article 4 direction can remove a permitted development right that would otherwise allow a conversion, and many authorities have used them over village centres and community buildings. Registration as an asset of community value under the Localism Act 2011 does not prevent a change of use, but it gives a community group a moratorium in which to bid when the owner wants to sell, and a live community bid is a material consideration.

For an objector or a parish council, the practical question is usually which class the building is in now, because that tells you whether a change can happen without any application you could comment on.

Establishing the existing class for an old building

Community buildings have long and untidy histories: a Methodist chapel that became a scout hut, then a nursery, then a store. The lawful use is the last lawful use, not the original one and not the one the deeds describe.

Assemble the evidence in date order. Planning history including any permissions and conditions, rating records and the valuation list description, booking diaries and accounts showing who used the building and how often, photographs, and local newspaper or parish records. Where a use changed without permission and has continued for long enough, it may have become lawful through the passage of time, which is a question about immunity rather than about classes.

Where the answer matters, a Lawful Development Certificate under section 191 of the Town and Country Planning Act 1990 is the only formal way to confirm that an existing use is lawful, and it binds the council. A Planning Statement setting out the history with the evidence for each step is the core of that application, and the same material supports an application to change the use if that is where the building is heading. The analysis runs the same way for health and veterinary uses in residential streets, where the Class E boundary for medical uses turns on identical questions of fact.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. Enter your postcode on PlanScope to see which documents a change of use application for a community building would need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the difference between a public hall and a community hall?

A public or exhibition hall is Class F1(e) and serves a wide catchment, often through ticketed events, exhibitions and trade shows. A hall or meeting place for the principal use of the local community is Class F2(b). The test is who principally uses it, and the booking diary is usually the best evidence.

Can a community hall become a nursery without planning permission?

No. Creches and day nurseries sit in Class E following the 2020 changes, so moving a Class F2(b) hall to that use is a change between classes and needs permission. A Class F1 hall could become a school, museum or place of worship without an application, because those uses are all within F1.

Where did indoor sport and gyms go in 2020?

Into Class E(d). Outdoor sport and recreation stayed in Class F2(c) and swimming pools stayed in Class F2(d) whether indoor or outdoor. That produces the odd result that an indoor tennis centre can become an office without permission while an outdoor court cannot.

Is a commercial art gallery in Class F1?

No. Class F1(b) covers the display of works of art otherwise than for sale or hire, so a gallery that sells the work is retail and falls in Class E(a). That single distinction transforms the flexibility available to the building, since Class E allows movement to offices, nurseries, clinics and gyms.

How do I find out which class an old community building is in?

Work through the history in date order: planning permissions and conditions, rating records, booking diaries and accounts, photographs and parish records. The lawful use is the last lawful use rather than the original one. Where it matters, a certificate under section 191 of the 1990 Act settles the question and binds the council.

Sources and further reading

use classesclass f1class f2communitychange of use

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →